Application of modified chipped-peak-method in network planning optimization

LIU Zaijin1,DU Xiaoling2(1.Department of Civil Engineering,Nanchang Institute of Technology,Nanchang330099,China;2.School of Architectural Engineering,Nanchang University,Nanchang330029,China)  
The chipped-peak-method in network planning resource-leveling optimization was analyzed,introduce a modified chipped-peak-method to solve the problem of the complicated adjustment,the fast optimize method can reduced calculating step.Finally,an example is given to show that the modified method is quick and reliable.
【CateGory Index】: TU721.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Hen Jin-qing;Implement Target Control Management and constructing State-of-art Project[J];Fujian Construction Science & Technology;2006-01
2 HE JIN QINGPUTIAN MINZHONG WASTE WATER TREATMENT CO.,LTD.;The technology of purpose managent use in PUTIAN Walking Street engineering[J];Fujian Architecture & Construction;2006-01
3 Guangdong Electric Power Transmission and Substation Engineering Company Chen Bing;Managing a Project Plan by Microsoft Project[J];Guangdong Power Transmission Technolo;2004-03
4 BIAN Liming, WANG Zhuofu, OUYANG Hongxiang, LI Hongxian(International Business School, Hohai Univ., Nanjing 210098, China);Risk analysis of precedence networks[J];Journal of Hehai University (Natural Sciences );2003-01
5 GUO Tai-pinga,TIAN Yan-xinb(a.Personnel Department;b.Civil Engineering College,Hunan City University,Yiyang,Hunan 413000,China);An Analysis of Cost Optimization of Periodic Works with Maximal Flow-Minimal Cut Theory[J];Journal of Hunan City University(Natural Science);2006-01
6 LUO Ming (Faculty of Construction Management and Real Estate, Chongqing University, Chongqing 400045, China);Readout Method about Time Parameters in Network Based on the Structure of Abacus[J];Journal of Chongqing Jianzhu University;2002-01
7 LI Junhong (School of Economics and Management,Guangzhou University,Guangzhou,510091,China);Making an Inquiry into Technical Specification of Engineering network Planning[J];Optimization of Capital Construction;2002-01
8 LI Quan-yun (Hebei Institute of Architecture & Civil Engineering, Hebei Zhangjiakou 075024, China);Improving Calculating Method for the Time Parameter of Splice Network Planning[J];Building Science;2005-02
9 WANG Yan-ling JI Zheng-fei;Brief talk on control of the supervision on the progress in construction[J];Shanxi Architecture;2009-13
10 SUN Cheng-cheng, YU Jian-lin (1.Luoyang Institute of Science and Technology, Luoyang 471023,China; 2.Luoyang Urban Construction Co. Ltd, Luoyang 471000, China);A Method for Direct Expression of Working Float in Time-coordinate Network Program[J];Journal of Luoyang Technology College;2007-05
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 FAN Qiang1,PENG Hong2,HU Jing-song2(1.College of Computer Science and Engineering,Zhanjiang Education College, Guangdong Zhanjiang 524037,China;2.College of Computer Science and Engineering,South China University of Technology,Guangdong Guangzhou 510640,China);Application of GA with Reparative Gene to Multi-resources Equilibrium Optimization in Highway Engineering[J];Journal of Chongqing Jiaotong University;2007-03
2 Zhao Yanlong, Ming Lei;Summarization of Construction Project Network Planning Optimization[J];Urban Roads Bridges & Flood Control;2007-01
3 LU Hao,WU Huan qun,LUO Yi (Changsha Comm.Univ.,Changsha 410076,China);A Time-cost Optimization Modeling and Program[J];Journal of Changsha Communications University;2001-02
4 LIU Yong-jian1,ZHAO Sheng-li2,LIU Yan2,BAI Yong-bing2,DU Guang-qian2,YU Qin-ling3(1.The First Branch Company,Hebei Construction Group,Baoding 071001,China;2.Rural and Urban Construction College,Hebei Agricultural University,Baoding 071001,China;3.Bareau of land and Resource of Haigang seetion,Qinhuangdao 066000,China);Optimization of resource allocation in construction using genetic algorithms[J];Journal of Agricultural University of Hebei;2007-05
5 SONG Jian hai, LIU Shi xin, WANG Meng guang, TANG Li xin (School of Information Science & Engineering, Northeastern University, Shenyang 110004,China,;Modeling and Algorithm for Shipment Scheduling in Steel Plants Product Delivery System[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2002-01
6 ZHANG Li-Wei(Heilongjiang Institute of Technology,Harbin 150050,China);ORGANIZING AND OPTIMIZING OF COMPREHENSIVE NETWORK PLANS[J];Low Temperature Architecture Technology;2007-03
7 Li Gaoyang,Wu Yuhua,Liu Mingguang(School of management,Tianjin University,Tianjin 300072,China);Network Planning Multi-objective Optimization Based on Differential Evolution[J];Engineering Science;2006-06
8 Wang Jiamin Sun Yongguang Wu Zongxin;The Review of Research on Project Scheduling Problem with Discounted Cash Flows[J];Systems Engineering;1999-02
9 GUO Zhen-ning(School of Mechanic & Electronic Engineering Soochow University,Suzhou 215005,China);Study on Acceleration of the Construction Time for Engineering Network Plan[J];Industrial Engineering Journal;2007-02
10 Wu Yuhua;Li Chongbin;Wu Linghui(Department of Management Engineering, Tianjin University, Tianjin, 300072);THE DIFFERENCE METHOD OF PARALLEL PATH BY USING CUT SET[J];JOURNAL OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT;1996-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved