Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Sichuan Building Science》 2007-06
Add to Favorite Get Latest Update

Research on an example of super long deep founndation ditch undering compiex surroundings

LI Anyong1,BAI Wenhua2,ZHAO Xiaowen2,XIE Shengbao3(1.Department of Civil Engineering,USTS,Suzhou 215011,China;2.Suzhou No.2 Construction Group Co.Ltd.,Suzhou 215004,China;3.Suzhou Construction Engineering Supervisory Co.Ltd.,Suzhou 215004,China)  
Under the complex surroundings around it and nearly 100 m of its length,the construction condition of the deep foundation pit is poor.Considering of the post-pouring concrete strain of the building,the suitable enclosure structure,the technology of curtain for cutting off water,soil excavation method was chosen and strengthening the construction monitoring to induced the harmful influence to the surroundings around the pit.Through analyzing the monitoring data,some helpful advice was given to the analogous temporary structures.
【CateGory Index】: TU753
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved