Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Sichuan Building Science》 2007-06
Add to Favorite Get Latest Update

The practice and mode analysis for "deputize build system" in engineering project

LI Ying1,ZHANG Guangzhong2,TAO Xueming1 (1.College of Architectural & Civil Engineering,Xihua University,Chengdu 610039,China;2.Sichuan JINGZHENG Build Consultation Manage Ltd.,Chengdu 610081,China)  
The similarities and differences analyze through the manage mode in project of government invest and mode of PM,PMC,EPC in international engineering project commonly,bring forward the deputize build system is manage mode of engineering that suits the situation of our country.The deputize build system actualize the problemes of procreant in course,such as to choice the mode of deputize build system,to invite public bidding of deputize build company,to status in law and compact manage of deputize build company,to confirm of deputize build moment etc.make with analysis and study,the ways of perfect and criterion are bring forward.
【CateGory Index】: F283
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 HUAI Xianfeng,WANG Xiaolei;Discussion on the Application of Construction-agent System in the South-to-North Water Diversion Middle Route Project Management[J];Construction Economy;2009-S1
【Co-citations】
Chinese Journal Full-text Database 7 Hits
1 TAO Xue-ming~1,XIANG Yong~1,LIU Yong~2(1.Xihua University,Chengdu 610039,China;2.Chongqing University,Chongqing 400045,China);The application of entropy method in the evaluate bids about bills of quantity mode[J];Building Science Research of Sichuan;2005-04
2 TAO Xue-ming,LI Ying(College of Architectural & Civil Engineering,Xihua University,Chengdu 610039,China);The analysis and research for compete force of step item cost in bid quoted price to bill quantity of construction[J];Sichuan Building Science;2006-04
3 BAI Runshan, WANG Liwen;Problems and Countermeasures of Practicing Bill of Quantity[J];Construction Economy;2006-S1
4 LIU Bingnan, FAN Jifei;Application of the Algorithm of Maximizing Deviations in Bidding Evaluation with Reasonable Low Price[J];Construction Economy;2008-02
5 Shen Qi-yu Zhang Shu-jun;STUDY ON THE WHOLE PROCESS CONTROL OF ENGINEERING BUILDS COST FOR THE REAL ESTATE ITEM[J];Building Technique Development;2008-09
6 WANG Jun-jie CHEN Jie;On early cost control of government-invested project[J];Shanxi Architecture;2007-31
7 QIU Bei;On how to control project of the construction enterprise[J];Shanxi Architecture;2009-26
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Li Yongchao,Lv Tianyu(PLA Military Economy College,Wuhan 430035,China);Construct the Substitutive Project Management Pattern for Government-invested Project under Checks and Balances[J];Anhui Architecture;2007-01
2 YAN Ling~(1,2),ZHAO Li-ming ~2(1.Economic and management school,Tianjin University of Technology,Tianjin 300191,China;2.School of Management Tianjin University,Tianjin 300072,China);The Research on the Principal Agent Relationship of Government Investment Project in China[J];Research On Financial and Economic Issues;2005-12
3 LUO Jian-hua, GAO Feng (Department of Industry and Commerce, Changsha University of Technology, C hangsha, Hunan 410077, China);An Analysis of the Trust and Agency in the Construction Project s Invested by the Government[J];Journal of Changsha University of Electric Power;2003-02
4 ZHAO Bin,ZHANG Shi-lian,QI Yu-juan(Faculty of Construction Management & Real Estate,Chongqing University,Chongqing 400030,P R China);The Evaluation System of Agent of Government Investment Project Based on AFD[J];Journal of Chongqing University(Natural Science Edition);2007-11
5 Liu Erlie Cai Gengqian(School of Management,Tianjin University,300072);Engineering Project Integrated Management[J];Port Engineering Technology;2001-04
6 LI Jicai~1,DENG Jiaojiao~2(1.Port of Authorities of Rizhao,Rizhao 276826;2.Economic & Management School,Tianjin University of Technology,Tianjin 300384,China);Preliminary Research on the Agent Incentive Based on the Status Quo of Agential Cost[J];Port Engineering Technology;2006-04
7 LI Li-xin(School of economic & management, tongji university, Shanghai 200092,China);Decomposing and Controlling of Large-scale Infrastructure Project Design Interface[J];Construction & Design for Project;2005-01
8 TANG Qiu-feng (Guangxi University of Finance and Economics,Nanning 530003,China);Study on the Relationship among the Parties in the Government Investment Project Administration——from the View of Principal-agent Theory[J];Journal of Guangxi University of Finance and Economics;2008-04
9 LI Lin~1,TANG Han-ling~2(1.School of Management,Chongqing Technology and Business University;Chongqing 400067,China;2.Economy and Commerce College,Chongqing Technology and Business University;Chongqing 400067,China);On Integrated Management of the Modern Enterprise Model[J];Journal of North University of China(Social Science Edition);2006-04
10 LI Biao~1,CHAI Hong-feng~2(1.Business School,Hohai University,Nanjing 210098,China;2.Department of Water Resources of Zhejiang Province,Hangzhou 310009,China);Selection method for EPAM enterprises based on improved fuzzy optimum model[J];Journal of Hohai University(Natural Sciences);2006-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved