Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Sichuan Building Science》 2009-03
Add to Favorite Get Latest Update

Analysis on mechanical characteristics of surrounding rock and support structures of lateral karst cave tunnel

MO Yangchun1,ZHOU Xiaojun1,DENG Yaolin2(1.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;2.School of Seiences,Southwest Jiaotong University,Chengdu 610031,China)  
Because of the influence of karst cave,mechanical characteristics of surrounding rock and support structures of tunnel in karst zone differs from that of common tunnel.Taking a karst cave tunnel in the Zhongdian Expressway as an example,surrounding rock displacement and stress and plastic zone and anchor axial force and shotcrete axial force and moment are studied by using the three-dimensional fast lagrangian analysis of continua method,and the numerical calculation results and field monitoring results are compared.The results indicate that after tunnel is excavated,surrounding rock is convergented toward karst cave and tunnel.The surrounding rock between karst cave and tunnel is convergented in opposite direction.Plastic zone mainly concentrate on around tunnel and left-side and right-side of karst cave.The degree of stress concentration of the surrounding rock between tunnel and karst cave is higher.The anchor axial force and shotcrete axial force and moment of near karst cave are larger than that of away from karst cave.
【CateGory Index】: U451
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 LIU Tong,LIU Wei,LIU Xindong(School of Science,Xi'an University of Architecture and Technology,Xi'an 710055,China);Numerical analysis of construction process for four-lane section tunnel[J];Sichuan Building Science;2007-03
2 WAN Ming-fu1,HAO Zhe2,LIU Jian-ping1,LIU bin1(1.College of Resource and Civil Engineering,Northeastern University,Shenyang 110004,China;2.College of Architectural Engineering,Shenyang University,Shenyang 110044,China);Analysis of stability about excavation and support of super-span road tunnel[J];Journal of Liaoning Technical University;2007-01
3 JIANG Shu-ping1,LI Jian-jun2(1.Chongqing Communications Research and Design Institute,Chongqing 400067,China;2.Chongqing Communications Engineering Quality Supervision Office,Chongqing 400060,China);3D simulation and analysis of highway tunnels by use of advanced entrance construction method[J];Chinese Journal of Geotechnical Engineering;2007-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Xu Fengfeng,Li Haibo(The First Engineering Co.,Ltd.of CTCE Group,Hefei 230041,China);Application of Oblong Dome to the Opening of Multi-arch Tunnel[J];Anhui Architecture;2007-01
2 Li Laosan,Yang Xiaoli(School of Civil Engineering and Architecture,Central South University,Changsha 410075,China);Dynamic Response Analysis of the Large Cross-section Tunnel under Seismic Load[J];Anhui Architecture;2007-01
3 DENG Shao-jun~1,YANG Jun-sheng~1,ZHANG Xue-min~1,ZHONG Fang-ping~2(1.School of Civil Engineering and Architecture,Central South University,Hunan Changsha 410075 P.R.China;2.Construction and Exploitation Ltd.of Chang-Ji Expressway,Hunan Changde 415100 P.R.China);Numerical Simulation of Construction and Excavating Scheme for Shallow Multi-Arch Tunnel Under Unsymmetrical Pressure[J];Chinese Journal of Underground Space and Engineering;2005-06
4 SHI Ya-xin,WANG Ming-nian,Li Qiang(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031 China);Proper Selection of the Middle Wall of a Shallow Double-Linked-Arch Tunnel[J];Chinese Journal of Underground Space and Engineering;2005-06
5 LIU Ming-gao,GAO Wen-xue,ZHANG Fei-jin(College of civil engineering,Beijing University of Technology,Beijing 100022,China);Research on Key Construction Technology and Application of Small Interval Tunnel[J];Chinese Journal of Underground Space and Engineering;2005-06
6 HUANG Sheng-wen1,LI Sen-lin1,LU Chang-liang2(1.The Institute of Geotechnique of CUST,ChangSha 410076,China;2.Department of Construction of GuiZhou province,GuiYang 550003,China);Research on the Rock Classification of Tunnel by Improved Extension Assessment Method[J];Chinese Journal of Underground Space and Engineering;2007-05
7 LING Chang-rong1,2,ZHANG Zi-xin1,2(1.Key Laboratory of Geotechnical and Underground Engineering,Ministry of Education,Shanghai 200092,China;2.Department of Geotechnical Engineering,School of Civil Engineering,Tongji University,Shanghai 200092,China);A Study of Computation Model with Load-structure Method for Unsymmetrically Loaded Closely-spaced Tunnel[J];Chinese Journal of Underground Space and Engineering;2007-06
8 ZHOU Jian-kun1,WU Jian2(1.China Academy of Railway Sciences,Beijing 100081,China;2.Department of Geotechnical Engineering,College of Civil Engineering,Tongji University,Shanghai 200092,China);Fault Tree Analysis of the Collapse Risk in Rock Highway Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-06
9 LU Quan-zhong,PENG Jian-bingCollege of Geology Engineering and Geomatics,Chang'an University,Xi'an 710054,China;Research on Systematic Frame and Some Problems of Engineering Geology of Loess Mass[J];Journal of Jilin University(Earth Science Edition);2006-03
10 WANG Wen-hua,et al.(Faculty of Civil Engineering,Changchun Institute of Technology,Changchun 130012,China);Design scheme of superhighway at section alongside mountain[J];Journal of Changchun Institute of Technology(Natural Sciences Edition);2008-02
China Proceedings of conference Full-text Database 10 Hits
1 MA Yu-cheng KONG Ling-qi GUO Zhong-yin (School of Transportation Engineering,Tongji University,Shanghai 200092,China);Safety Operating Speed and Control Measure Based on Lighting Transition to Tunnel Entrance[A];[C];2007
2 ;红粘土浅埋隧道施工沉降分析及处治措施[A];[C];2005
3 (LONG Bai-hua~1 HU Xing~2 HUANG Da-yong~1 WANG Xin-jie~1) (1.Civil & Architectural Engineering Institute,GuiZhou University,Guiyang,China,550003,2.Testing center of Civil & Architectural Engineering Institute,GuiZhou University,Guiyang,China,550003,);NONLINEAR REGRESSION ANALYZE THE STRAIN OF THE ENCLOSING ROCK OF TUNNEL[A];[C];2005
4 Liu Qin Li Shu-cai Xue Yi-guo Zhang Qing-song Zhang Ning (The Research Center of Geotechnical Engineering,Shandong University,Jinan,250061,China);Comprehensive treatment method of gushing water and gushing mud at F_2 fault in over-length highway tunnel[A];[C];2008
5 Ding Wen-qi Xie Dong-wu Cai Yong-chang Wang Xiao-xing Li Zhi-gang (Key Laboratory of Geotechnical Engineering of Ministry of Education;Department of Geotechnical Engineering,Tongji University,Shanghai 200092 P.R.China);Study on the best curvature of temporary support of the core rock pillar of large cross section tunnel[A];[C];2007
6 Xu Yan Ding Wenqi 1.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Department of Geotecnical Engineering,Tongji University,Shanghai 200092,China;Optimization Design of the Section form and Lining of Twin Tunnel and Its Application[A];[C];2008
7 WANG Wei-feng~1,BI Jun-li~2 (1.Beijing Urban Engineering Design and Research Institute,Beijing 100037,China; 2.China Railway Tunnel Survey and Design Institute,Luoyang 471009,China);Construction project optimizing of soft rock and shallow buried tunnel[A];[C];2007
8 SONG Yu-xiang~(1,2),JIA Xiao-yun~2,ZHU Yong-quan~2 (1.Southwest Jiaotong University,Chengdu 610031,China;2.School of Civil Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China);Research on simplified method of multiple structure reliability of metro tunnel[A];[C];2007
9 WANG Shao-qiang~1,QIAO Chun-sheng~2,XU Gan-cheng~3,ZHU Zheng-guo~2 (1.Anhui Provincial Communications Investment Group Co.Ltd.,Hefei 230011,China; 2.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China; 3.Air Force Engineering Design and Research Bureau,Beijing 100077,China);Deformation and stress distribution of middle-wall for asymmetrically-loaded double-arch tunnel under complicated geological conditions[A];[C];2007
10 TANG Jin-song~(1,2),LIU Song-yu~1,TONG Li-yuan~1,YU Jun~1 (1.College of Transportation,Southeast University,Nanjing 210096,China; 2.School of Civil Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China);Comparative study on tunneling scheme of shallow overburden and large-span highway tunnel in cracked rock mass[A];[C];2007
【Secondary Citations】
Chinese Journal Full-text Database 9 Hits
1 LIU Xin rong et al.;Characteristics of Four-lane Road Tunnel and Problems to be Solved[J];Underground Space;2003-04
2 HUANG Lun-hai et al;Model Test on Single Four-lane Highway Tunnel Excavation[J];Underground Space;2004-04
3 JIANG Shu-ping , HUANG Lun-hai , HU Xue-bin(Chongqing Institute of Research and Design of communication, Chongqing 400067, China);Design and Study of Highway Tunnel with Super-large Cross Section[J];;2005-01
4 HUANG Lun-hai1 , JIANG Shu-ping1 , ZHANG Jun2(1.Chongqing Communications Research & Design Institute,Chongqing 400067;2.Jiangshu Province Expressway Development Headquarter, Nanjing, 21000);Current Status and Prospect of Environmental Design and Construction of Road Tunnel Entrance[J];;2005-03
5 JIA Ming-kui1,2, ZHAO Xing-dong3, JIA An-li1 (1.College of Resource and Safety Engineering, China University of Mining and Technology, Beijing 100083,China; 2. Institute of Jiaozuo Coal Mine Group Corporation, Jiaozuo 454002, China; 3. Center for Rock Instability and Seismicity Research Northeastern University, Shenyang 110004, China);Bolt-grouting support technique controlling floor heave of extremely soft rock roadway[J];Journal of Liaoning Technical University;2005-03
6 HAO Zhe 1,LI Wei 2,WAN Ming-fu 3 (1.School of Architectural Engineering, Shenyang University, Shenyang 110044,China; 2.Shandong Provincial Institute of Architectural Design and Research, Jinan 250001,China; 3.School of Resource and Civil Engineering, Northeast University; Shenyang 110004,China);Thinking About Some Problems in Excavation of Long Span Tunnel[J];Highway;2005-04
7 ZHANG Jun1, JIANG Shu-ping2, LI Jiang-jun3, LIU Yuan-xue 2,4;Finite Element Simulation Research on Highway Tunnel Environment-friendly Imaginary Tunnel Entrance[J];Technocogy of Highway and Transport;2005-03
8 Jiang Shuping (Chongqing Communication Research and Design Institute, Chongqing 400067) Li Jianjun (Chongqing Civil Engineering & Architecture Institute, Chongqing 400074);Construction of the advanced entrances of highway tunnels and its application[J];Modern Tunnelling Technology;2005-02
9 JIANG Shu-ping1, LIU Yuan-xue1,2,3, HUANG Lun-hai1, CHAI He-jun1, TANG Shu-ming1 (1. Chongqing Communication Research & Design Institute, Chongqing 400067, China; 2. Department of Architecture and Civil Engineering, Logistical Engineering University, Chongqing 400041, China; 3. Key Lab for Exploitation of Southwest Resources & Environmental Disaster Control Engineering, Ministry of Education, Chongqing 400044, China);Stability analysis of environmental protection structure on exit of tunnel[J];Chinese Jounal of Geotechnical Engineering;2005-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved