Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Sichuan Building Science》 2011-06
Add to Favorite Get Latest Update

Partial factor in load combination of earthquake action considering the target period of usage

LIU Zhenyong1,YAO Gensheng2(1.Shanghai Municipal Sewerage Company Ltd.,Shanghai 200002,China; 2.East China Architectural Design & Research Institute Company Ltd.,Shanghai 200002,China)  
Probabilistic limit state method based on the probabilistic theory has been accepted worldwide.Based on reliability theory,by introducing the target period of usage,the partial factor in load combination of earthquake action has been correspondingly modified in this article,and the verification of reliability level of modified load effect has been obtained by compiled programs.
【CateGory Index】: TU311.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved