Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Anhui Electrical Engineering Professional Technique College》 2008-01
Add to Favorite Get Latest Update

Combustion Adjustment Technology of 600MW Once Through Bolier for Supercritical Unit

ZHAI De-shuang,ZHANG Jian-hua(Tianji Power Plant,Huainan 232098,China)  
Based on Tianjia Power Plant′s phase 1 project,we introduce the design of 600MW once through bolier for China-made supercritical unit, its current situation and the technology of combustion adjustment under real optation.
【CateGory Index】: TK227.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 GONG He,LIU An-tang,FANG Xiao-dong,WANG Jin-Sheng,ZHANG Wei-kang,WANG Wen-qing,CHEN Tao(Anhui Huainan Pingwei Power Co.,Ltd.,Huainan 232089,Anhui,China);Combustion Optimization Adjustment Method for 600 MW Supercritical Unit[J];East China Electric Power;2010-09
【Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHAI Deshuang(Tianji Power Plant,Huainan 232098,China);Causes of tube explosion of division panel superheaters of once through boilers for 600 MW supercritical units and countermeasures[J];East China Electric Power;2007-10
【Co-citations】
Chinese Journal Full-text Database 2 Hits
1 ZHANG Jian-zhong(Technical Center of East China,China Power Construction Engineering Consulting Corp.,Shanghai 200137,China);Review of Actual Operation Level of China's SC/USC Thermal Unit[J];Electric Power Construction;2009-04
2 ZHU Yi1,YANG Ning1,XU Yao-liang1,CHEN Yuan-liang2(1.Shanghai University of Electric Power,Shanghai 200090,China;2.Shanghai Wujin 2nd Power Supply Co.,LTD.,Shanghai 200241,China);Cause Analysis and Improvement Measures on Heater Tube Cracking of 600MW Supercritical Boiler[J];East China Electric Power;2011-08
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 HUANG Wei(Hunan Provincial Electric Power Test Research Institute,Changsha City,410007);Analysis on Causes of Excessive Main Steam Temperature during Turning of 600 MW Supercritical Unit with Improving Measures[J];Electric Power Construction;2006-11
2 TANG Fei,DONG Bin,ZHAO Min (China Power Engineering Consulting(Groups)Corporation,Beijing 100120,China);USC Unit Development and Application in China[J];Electric Power Construction;2010-01
3 XU Xue-yuan(Shanghai Boiler Co.Ltd.,Shanghai 200245,China);1 200 MW USC Parameter Boiler Development[J];Electric Power Construction;2010-03
4 FAN Quangui(North China Electric Power University, Baoding 071003,China);Analysis of New Pulverized Coal Combustion Technology of Super Critical Pressure Boiler[J];Electrical Equipment;2006-02
5 ZHANG Wen-peng~1,LIN Xi-kui~1,LI Xiang-ling~2,HAN Bao-min~2,Sun Shou-yi~2 (1. Huadian International Zouxian Power Plant,Zoucheng 273502,China ;2. Huadian Internationa1 Shandong Project Management Corporation,Suzhou 234101,China);Type Selection Study of Coal Pulverizing System of 1000MW Class Fossil-Fired Generating Unit[J];Electrical Equipment;2006-06
6 LI Hu (Huaneng Yuhuan Power Plant,Yuhuan 317604,China);Contrast and Analysis of Advanced Design and Economic Operation of 1000 MW Ultra-supercritical Generating Unit[J];Electrical Equipment;2007-12
7 Feng Jun-ka, Mao Jian-xiong;Prospects of Coal Combustion Technology Development[J];Power Engineering;1990-06
8 WANG Jun~1,DENG Zhong-yong~1,LI Tie~1,HE Wei~1,LIN Zheng-chun~2(1.Dongfang Boiler(Group) Co.Ltd.,Zigong 643001,China;2.Dongfang Hitachi Boiler Co.Ltd.,Jiaxin 314001,China);Commissioning and Operational Experiences of 600MW Supercritical Boilers[J];Journal of Power Engineering;2006-01
9 YANG Zhen~1,ZHUANG En-ru~2,CAO Zi-dong~1(1.Xi'an Jiaotong University,Xi'an 710049,China;2.Shanghai Boiler Works Co.Ltd.,Shanghai 200245,China);Combustion Adjustment of a 600 MW Supercritical Once-through Boiler[J];Journal of Power Engineering;2007-04
10 FAN Quan-gui~1,YOU Jun-kun~1,WANG Ning~2(1.North China of Electric Power,Baoding 071003,China;2.Shizuishan Power Plant,Ningxia 753202,China);Experimental Study on Coal Powder Apportioning Uniformity Among Conveying Pipes of Spheroidal Roller Mills & Improvements[J];Journal of Power Engineering;2007-04
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 GAO Ji-lu,ZOU Tian-shu,LENG Jie,WU Jing-xing,LIU Xue-zeng(Electric Power Research Institute of Liaoning Electric Power Co.,Ltd.,Shenyang 110006,China);Test Study on Combustion Adjustment for 1 000 MW Ultra Supercritical Boilers[J];Journal of Chinese Society of Power Engineering;2012-10
2 ZHANG Sai-hong,WU Wen-fei *,LI Bao-wei(Inner Mongolia Key Laboratory for Utilization of Bayan Obo Multi-Metallic Resources,Elected State Key Laboratory,Inner Mongolia University of Science and Technology,Baotou 014010,China);Numerical research of effect of load to tangential firing boiler gas-solid flow characteristics[J];Journal of Thermal Science and Technology;2013-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved