Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Anhui Institute of Architecture》 2002-03
Add to Favorite Get Latest Update

COMPUTING EMULATION OF CONTROL OVER CONSTRUCTION OF LARGESIZED HIGHWAY BRIDGE OVER YANGTZ RIVER IN ANQING

Han Fuqing(School of Civil Engineering,Hefei University of Technology,Hefei,230009) Hu Ke(The institute of design & survey of Anhui Province,Hefei,230041) Kou Mingguo(School of Civil Engineering,Hefei University of Technology,Hefei,230009)  
As to the large sized highway bridge over Yangtz river in Anqing,we confirmate the procedure of computing emulation of beam installation through adjusting constrtuction project over and over and structrural analysis parameter.Aim for the steel main beam,we consider its structural feature and predict every image of stress and deformation of structure during every construction stage ideally,and at the same time provide basis of control over construction.
【CateGory Index】: U445.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 SUN Dong-feng1,SUN Jian-yuan1,CHEN Fang-dong2(1.Dept.of Bridge Engi.,Tongji Univ.,Shanghai 200092,China;2.Zhejiang Provincial Institute of Communications Planning,Design & Research,Hangzhou 310066,China);SIMULATION ANALYSIS AND ADAPTIVE CONTROL ON WENZHOU GATE BRIDGE[J];Low Temperature Architecture Technology;2011-01
2 ZHANG Jian-min~1,XIAO Ru-cheng~2(1.Guangzhou Municipal Engineering Quality and Safety Supervision Station,Guangdong Guangzhou 510050,China;2.Department of Bridge Engineering,Tongji University,Shanghai 200092,China);Construction Process Calculation Analysis for a Prestressed Concrete Cable-stayed Bridge at Wuhekou[J];Journal of Highway and Transportation Research and Development;2007-01
3 ZHANG Jian-min~1,TANG Xi-ming~2(1.Guangzhou Municipal Engineering Quality and Safety Supervision Station,Guangzhou 510050,China;2.Department of Civil Engineering,Guangxi University,Nanning 530004,China);Construction process analysis for the main span of a thousand-meter scale cable-stayed bridge[J];Journal of Guangzhou University(Natural Science Edition);2006-03
【Citations】
Chinese Journal Full-text Database 2 Hits
1 CHANG Ying (Communications Planning and Design Institute of Hubei Province, Hubei Wuhan 430051,China);Analysis of Key?points for Construction Control of Long?span Steel Box?girder Cable?stayed Bridge[J];Journal of Highway and Transportation Reseach andk Development;2001-01
2 CHEN De wei, XU Jun, ZHOU Zong ze, LI Guo zhi (Department of Bridge Engineering,Tongji University,Shanghai 200092,China);New Evolution of Prestressed Concrete Cable-stayed Bridge Construction Control[J];Journal of Tongji University;2001-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Shan-hong~1,JIANG Zi-qiang~2 (1.Department of Bridge and Structure,Chongqing Jiaotong University,Chongqing,400074,China;2.Highway Planning Survey,Design and Research Institute,Sichuan Province Communications Department,Chengdu 610041,China);The study on construction control of Maxiaoxi bridge across the Jialingjiang river[J];Sichuan Building Science;2006-01
2 LIU San-qi1,HU Cheng2,JIANG Tian-xiao3(School Of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Experiment research on prestress tube frictional resistance of PC beam bridge[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2010-02
3 Tao Yuxian et al;Stress Control Analysis in the Control of Bridge Construction[J];Anhui Architecture;2011-04
4 ;Construction Control of Part of the Cable- Stayed Bridge with Prestressed Concrete[J];Anhui Architecture;2011-05
5 ;Construction Technology of Bracket Method of Long-Span Continuous Box Girder[J];Anhui Architecture;2011-06
6 ;Research on Stress Monitoring of Cantilever of Prestressed Continuous Bridge[J];Anhui Architecture;2012-01
7 LIN Wen-quan1,ZHU Er-yu2,SUN Ling3 (1.The Fourth Survey and Design Institute of China Railways,Wuhan 430063,China;2.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China;3.Beijing Municipal Engineering Research Institute,Beijing 100037,China);Application of the First-Order Optimization Method in Adjustment of the Force of Cable[J];Journal of Beijing Jiaotong University;2007-04
8 ZHU Jin-yong (College of Civil Engineering,Lanzhou Jiaotong University,Lanzhou 730070,China);Analysis of affecting construction during closing of prestressed concrete continuous girder bridge[J];Journal of Henan University of Urban Construction;2009-03
9 LIU Shan-hong~1,QIAN Yong-jiu~2(1.Post-Doctoral Research Station of Traffic and Transp. Eng., Southwest Jiaotong University, Chengdu 610031, China;2.School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China);Research on web cracking control of long span PC box girder bridge[J];Journal of Chongqing Jiaotong University;2005-04
10 HUANG Hai-dong~1,XIANG Zhong-fu~1,LIU Zhi-hui~1,SHUN Jun-ling~2,QANG Lu~11.School of Civil Engineering & Architecture, Chongqing Jiaotong University, Chongqing 400074,China; 2.T.Y.lin International of Chongqing, Chongqing 400010, China;Study on construction control project for Chongqing Shibanpo bridge[J];Journal of Chongqing Jiaotong University;2005-06
China Proceedings of conference Full-text Database 4 Hits
1 You Qingzhong~1 He Ping~1 Dong Xuewu~1 Zhang Xigang~2 Wu Shouchang~1 (1.Jiangsu Provincial Su-Tong Bridge Construction Headquarter,Nantong Jiangsu 226010; 2.CCCC Highway Planning and Design Institute,Beijing 100010);Key Techniques for Construction of Su-Tong Bridge with a Main Span of 1088m[A];[C];2009
2 WANG Hang (Beijing General Municipal Engineering Design and Research Institute,Beijing 100045, China);Simulation and Management of A Steel-Concrete Composite Beam Constructed By the Measure of No-Temporary-Support[A];[C];2006
3 GUO Yan-lin,LIU Xue-wu,ZHANG Qing-lin,LIU Lu-yu,DOU Chao (Tsinghua University,Beijing 100084,China);Study and Application of Mechanical Problems During Construction Process of Complex Steel Structures[A];[C];2006
4 Gao Zhenfeng~1,Wu XiaoPing~1,Wang Yunfei~2 (1.Shanghai Construction Group General Co.,Shanghai 200120,China; 2.Shanghai Mechanized Construction Co.,Ltd.,Shanghai 200072,China);Study and Application of Construction Control Technique of Super-large Steel Structure[A];[C];2008
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WEI Xing,QIANG Shi-zhong (School of Civil Eng.,Southwest Jiaotong University,Chengdu610031,China);Application of ANSYS in nonlinear analysis in cable-stayed bridges[J];Building Science Research of Sichuan;2003-04
2 LIU Shan-hong~1,JIANG Zi-qiang~2 (1.Department of Bridge and Structure,Chongqing Jiaotong University,Chongqing,400074,China;2.Highway Planning Survey,Design and Research Institute,Sichuan Province Communications Department,Chengdu 610041,China);The study on construction control of Maxiaoxi bridge across the Jialingjiang river[J];Sichuan Building Science;2006-01
3 WU Dong cai (School of Geodesy and Geomatics,Wuhan University,Wuhan 430079,China);Research on Deformation Monitoring of Large Cable-stayed Bridge[J];Acta Geodaetica Et Cartographic Sinica;2002-03
4 ZENG De-rong\+1, CAO Xiao-chuan\+2 (1 Department of Bridge & Structure Engineering,Chongqing Jiaotong University,Chongqing 400 074,China; 2 Company of Consulting Chongqing Jiaotong University,Chongqing 400074,China);Computation of highth of the bridge model in construction[J];Journal of Chongqing Jiaotong Institute;2001-02
5 HAO Chao 1,\ PEI Min shan 2,\ QIANG Shi zhong 1 (1 Institute of Civil Engineering, Southwest Jiaotong Universtity,Chengdu 610031, China; 2 Highway Planning and Design Institute,the Ministry of Transportation,Beijing 100010,China);Comparison of algorithm for calculating non-stress length of cable in long-span cable-stayed bridges[J];Journal of Chongqing Jiaotong Institute;2001-03
6 ZHANG Jian min\+1,\ ZHEN Jie lian\+2,\ QIN\ Rong\+3 (1 South China University of Technology,Guangzhou 510641,China;2 Guangxi Communication Department,Nanning 530001,China;3 Guangxi University,Nanning 530004,China);Time-dependent behavior analysis of long span CFST arch bridge[J];Journal of Chongqing Jiaotong Institute;2001-04
7 YANG Xuan,ZHOU Shui-xing(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Method to Determine Construction Cable Tension Force of Cable-Stayed Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2008-01
8 YANG Xing,ZHANG Min,ZHOU Shui-xing(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Application of Influence Matrix Method to Secondary Cable-Adjustment of Cable-Stayed Bridges[J];Journal of Chongqing Jiaotong University(Natural Science);2009-03
9 Liu LiMing,Ning PingHua et al.;Construction Control of A Prestressed Concrete Continuous Girder Bridge with a Main Span of 138 m[J];Urban Roads Bridges & Flood Control;2002-01
10 YAN Dong huang 1, YUAN Shuai hua 2, GUO Yi zhong 3 (1.Changsha Comm. Univ., Changsha 410076, China; 2.Xiangtan Technical College, Xiangtan 411100, China; 3.Guangzhou Port Eng. Design Ins.,Guangzhou 510700, China);The Rational Construction State of Jianghan Fourth Bridge in Wuhan[J];JOURNAL OF CHANGSHA COMMUNICATIONS UNIVERSITY;1999-02
【Secondary References】
Chinese Journal Full-text Database 6 Hits
1 ZHANG Bao-kui1,MA Qing-zhen2(1.School of Civil Engineering,Hebei University of Technology,Tianjin 300132,China;2.School of Management,Tianjin University of Commerce,Tianjin 300134,China);Construction Control of a Highway Cable-stayed Bridge on the Yangtze River[J];Journal of Highway and Transportation Research and Development;2007-08
2 LI Ke-yin1, CHENG Liang-tao2 (1.Wuhan Uniyersity of Technology, Wuhan 430063, China; 2.Hainan Frontier Force of APF, Haikou 570208, China);Stress analysis for girder of Yunyang Changjiang River Bridge[J];Technology & Economy in Areas of Communications;2006-02
3 ZHANG Bao-kui1,MA Qing-zhen2(1.School of Civil Engineering,Hebei University of Technology,Tianjin 300132,China;2.School of Management, Tianjin University of Commerce, Tianjin 300134,China);On the construction control in simulating cable-stayed bridge on Yunyang Changjiang River[J];Technology & Economy in Areas of Communications;2007-01
4 WANG Yan1,WEI Chun-ming2,CHEN Huai1(1.School of Civil Engineering,Zhengzhou University,Zhengzhou 450001,China;2.Henan New Century Road and Bridge Engineering Consultation Co.,Ltd.,Zhengzhou 450016,China);Analysis of Mechanical Properties of Extradosed Bridge in Construction Process[J];Bridge Construction;2012-02
5 GUO An-hui1,ZHANG Men-zhe2 (1.CCCC Second Highway Consultants Co.,Ltd.,Wuhan 430056,China;2.Hubei Highway Engineering Consultation & Supervision Center,Wuhan 430030,China);Design of Tieluoping Bridge on Shanghai-Chengdu Expressway[J];Bridge Construction;2012-04
6 TIAN Zhong-chu,ZHONG Wei,JIANG Tian-yong,XIE Hai-bo(School of Civil Engineering and Architecture,Changsha University of Science and Technology,Changsha 410114,Hunan,China);Calculating method of gravity center of arch bridge with open thin-walled boxes and by rotary erection construction[J];Journal of Central South University of Forestry & Technology;2010-10
【Secondary Citations】
Chinese Journal Full-text Database 5 Hits
1 WEN Wu song 1, WANG Bang mei 2 (1. Wuhu Changjiang River Bridge Project Commanding Department, Major Bridge Engineering Bureau, the Ministry of Railways, Wuhu 241001, China; 2. Bridge Science Research Institute, Major Bridge Engineering Bureau, the;Contents and Methods for Monitoring and Controlling of Cable stayed Bridges at Construction Stage[J];BRIDGE CONSTRUCTION;1999-04
2 Chen Dewei; Fan Lichu; Xiang Haifan (Department of Bridge Engineering, Tongji University, Shanghai, 200092);Construction Control of the Stayed Bridge with Single Pier[J];JOURNAL OF TONGJI UNIVERSITY;1997-01
3 Chen Dewei; Wang Xiaotong; Chen Wenyun; Fan Lichu(Department of Bridgr Engineering, Tongji University, Shanghai, 200092);Visualized Construction Control System for Cable-stayed Bridges[J];JOURNAL OF TONGJI UNIVERSITY;1998-05
4 Lin Yuanpei;APPLICATION OF KALMAN'S FILTERING METHOD TO CABLE STAYED BRIDGE CONSTRUCTION[J];China Civil Engineering Journal;1983-03
5 Chen Dewei Zheng Xinguang Xiang Haifan (Tongji University);A CONSTRUCTION CONTROL SYSTEM FOR P.G.CABLE-STAYED BRIDGES[J];China Civil Engineering Journal;1993-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved