Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Anhui Architecture》 2006-04
Add to Favorite Get Latest Update

The Provincial Road Line S212 Fengshan Tunnel Landslide Process

Zhao Guogang1, Yuan Chunhua2, Wu Yuzhong 1 (1.Shanxi College of Communication Technology, Xi'an 710021,China; 2. The Second Highway Engineering Bureau of Highway-bridge Group Company, Xi'an 710065,China)  
In view of the tunnel landslide and combining with a project example, the paper elaborates the tunnel landslide reason and the processing method, proposes under the similar geological condition, to forecast the sections that may have unfavorable geological conditions through the analysis to the hydrologic geology and the engineering geology, and introduces the experience of preventing tunnel landslide and processing landslip with the help of Xin'ao method to gather data.
【CateGory Index】: U457.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 DONG Lin (The Fifth Engneering Co.Ltd.of China Railway Engneering Bureau 11 Group,Chongqing 400037,China);Monitoring and measuring techniques in the orthogonal tunnel construction[J];Sichuan Building Science;2008-06
2 XU Shusheng1,ZENG Xiangguo1,YAO Anlin2,WANG Qingyuan1,CHEN Huayan1,ZHAO Shiping1(1.College of Architecture and Environment,Sichuan University,Chengdu 610065,China;2.College of Civil Engineering and Architecture,Southwest Petroleum University,Chengdu 610500,China);Effects of excavation processing technology on the stability of surrounding rocks of neighborhood tunnel[J];Sichuan Building Science;2009-03
3 SUN Kuang-biao1,DENG Wen-long2(1.Anhui Expressway Corporation,Hefei,Anhui 230000,China;2.Anhui Institute of Highway Reconnaissance and Surveying,Hefei,Anhui 230041,China);DISCUSSION OF ON-THE-SPOT WALL ROCK CLASS DISCRIMINATION METHOD FOR TUNNEL[J];Geology of Anhui;2009-01
4 MA Chao1,WANG Dong-lin2(1.The Fourth Engineering Company of China Railway No.4 Engineering Group,Hefei 230023,China;2.Anhui University of Architecture,Hefei 230022,China);Monitoring Analysis of Ground Subsidence of the Subway Tunnel Construction by Shallow Mining Method[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2009-03
5 Yuan Fengtian (The Sixth Engineering Co., Ltd. of China Railway 15 Bureau Group , Luoyang 471013 , China);Key Construction Techniques of Multi-Arch Tunnel with Soft Wallrock in Water-Enriched Section[J];Anhui Architecture;2006-03
6 Shi Lei (The Fifth Engineering Co., Ltd. of China Tiesiju Civil Engineering Group , Jiujiang 332000 , China);Controlling Technique of Surface Settlement in Rectangular Tunnel with Large Span by Shallow Embedment and Concealed Excavation[J];Anhui Architecture;2006-03
7 Xu Fengfeng,Li Haibo(The First Engineering Co.,Ltd.of CTCE Group,Hefei 230041,China);Application of Oblong Dome to the Opening of Multi-arch Tunnel[J];Anhui Architecture;2007-01
8 Li Laosan,Yang Xiaoli(School of Civil Engineering and Architecture,Central South University,Changsha 410075,China);Dynamic Response Analysis of the Large Cross-section Tunnel under Seismic Load[J];Anhui Architecture;2007-01
9 ZHOU Xiao-jun;Design and Construction of Tunnel across Yellow River at Yanshuiguan for Gas Transportation Project from West China to East[J];Underground Space;2004-01
10 LI Qiang 1,2 , WANG Ming-nian 2 ,WANG Yu-suo 2(1.China Communications First Highway Survey Design and Research Institute , Xi'an 710075, China;2.Dept. of Underground and Tunnel Engineering, Southwest Jiaotong University, Chengdou 610031, China);Influence of System Anchoring Bolt During Construction ofLarge cross-section Tunnel[J];;2005-01
China Proceedings of conference Full-text Database 10 Hits
1 ;红粘土浅埋隧道施工沉降分析及处治措施[A];[C];2005
2 (LONG Bai-hua~1 HU Xing~2 HUANG Da-yong~1 WANG Xin-jie~1) (1.Civil & Architectural Engineering Institute,GuiZhou University,Guiyang,China,550003,2.Testing center of Civil & Architectural Engineering Institute,GuiZhou University,Guiyang,China,550003,);NONLINEAR REGRESSION ANALYZE THE STRAIN OF THE ENCLOSING ROCK OF TUNNEL[A];[C];2005
3 LEI Xiang-feng~1 WANG Shu-qiang~2 LIU Xu-quan~1 SHI Xin-qiao~2 LI Ben~2 (1.Headquarter of Zhengzhou-Xi'an Railway Passenger Dedicated Line,China Railway First Group Co.,Ltd,Tongguan,Shanxi 714300,China;2.Zhengzhou-Xi'an Railway Passenger Dedicated Line Co.Ltd,Xi'an,Shanxi 710043,China);Application of Wet Shot Microfibre in Construction of Large Sectional Loess Tunnel of Passenger Dedicated Line[A];[C];2008
4 Huang Jun Luo Yongzhong ( China Highway Planning and Design Institute (HPDI) Consultants, INC, Beijing 100010; Guang Dong Road and Bridge, INC, Guangzhou 510635);THE ANALYSIS ABOUT THE INFLUENCE FROM FAULT FRACTURE ZONE TO WIDE PROFILE HIGHWAY TUNNEL DESIGN[A];[C];2006
5 Bai honglu (Yiwan Railway Engineering Headquarters of China Railway 16TH Group Co.,Ltd.Enshi of Hubie Province);The application of Leading grouting technology in the Ye San Guan tunnel[A];[C];2007
6 LIANG Zhaobin,ZHANG Changwei,ZHANG Zhiqiang, (School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Study on the Interaction between the Longitudinal Structural of the Tunnel and Ground[A];[C];2008
7 Jin Yusong~1 Li Wenfei~1 Song yuanbin~1 Peng Kang~2 (1.Guizhou Kailin Group;2.Central South University);Optimizing Selection of Shoring Technology and Parameter of Qingcaichong Soft rock Laneway[A];[C];2009
8 ;可靠、经济的隧道安全新工法[A];[C];2009
9 ;上海长江隧道车道板同步施工植筋技术的应用研究[A];[C];2009
10 HUANG Hongjian, ZHANG Minqing (Yiwan Railway Department of China Railway Ministry, Enshi 445000, China);Construction of Karst and Karst-water of Tunnels on Yichang-Wanzhou Railway[A];[C];2009
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Yu Chang-jun;The Application of the Advance Geological Prediction and Forecast in the Engineering Construction of LiangFengya Tunnel[J];Chongqing Architecture;2006-03
2 ZENG Yu-ping ,XU Qiang, HE Zhong-wen (Chengdu University of Technology, Chengdu 610059, China; Chinese Railway Tunnel Holidings Co. , Ltd. , Xinxiang 453000, China);CAUSE AND TREATMENT MEASURES OF A LANDSLIDE ACCIDENT AT K4+374-+381 OF NANSHAN TUNNEL[J];Geology-geochemistry;2005-03
3 DAI Fuzhong LI Zhengqian SHI Shengwei WANG Guangzhai (Exploration Technology Institute of Geology Academy of china,Chengdu 610081,China);WARNING SYSTEM OF MOLDERING IN TUNNEL[J];JOURNAL OF GEOLOGICAL HAZARDS AND ENVIRONMENT PRESERVATION;2000-02
4 YU Ning,ZHU He-hua,SU Sheng-rui (Department of Geotechincal Engineering, Tongji University, Shanghai 200092,China);ANALYSIS OF GEOLOGICAL HAZARDS AND CORRESPONDING MANAGEMENT DURING THE ROAD TUNNEL CONSTRUCTION[J];Journal of Geological Hazards and Environment Preservation;2003-02
5 XIANG Wei, R. Jaeger (Engineering Faculty, China University of Geosciences, Wuhan 430074, China; Karlsruhe University of Applied Sciences, Karlsruhe 76133, Germany);Principle of the German GPS-Based Online Control and Alarm Systems and the Application in Engineering[J];Geological Science and Technology Information;2005-S1
6 QI Ji-hong1,HOU Zhao-lu2,JIA Shu-yuan1,WANG Neng-feng3 (1.College of Environment and Civil Engineering, Chengdu University of Technology,Chengdu 610059,China; 2.Southwest Investigation & Design Institute Of CR,Chengdu 610031,China; 3.Chengdu Hydroelectric Investigation & Design Institute Of SPC,Chengdu 610072,China);The Research on the Characteristics of Jinjiguan Tunnel′s Water Penetration and Deformation with Defects Control Measures[J];Journal of Disaster Pnevention and Mitigation Engineering;2005-02
7 Yang Bin;Application of anticipated Protection by Pre grounted Big Tube Canopy in Fengshuangling Tunel[J];Fujian Construction Science & Technology;2005-02
8 CHEN Qiunan~(①②)ZHANG Yongxing~(②)LU Qiang~③ WAN Wen~① YANG Shengquan~①(①School of Civil Engineering , Hunan University of Science & Technology, Xiangtan 411201) (②School of Civil Engineering, Chongqing University, Chongqing 400045) (③Traffic programming and Design Institute of Hunan,Changsha 410073);ANALYSIS OF COLLAPSE DISPOSAL AND ITS EFFECT AT GUANKOUYA HIGHWAY TUNNEL[J];Journal of Engineering Geology;2005-03
9 Yang Zhifa Shang Yanjun Liu Ying (Institute of Geology, Chinese Academy of Sciences, Beijing 100029);STUDY ON THE ANALOGISM IN GEOTECHNICAL ENGINEERING[J];JOURNAL OF ENGINEERING GEOLOGY;1997-04
10 Li Shihui 1, Song Jun 2 (1. The 4th Design and Research Institute, Department of the Engineer Corps, H.Qs of the General Staff of PLA, Beijing 100850, China; 2. No.4 Department of the No.14 Railway Construction Bureau,Xinhui, Guangdong 529149, Ch;Deformation Rate Ratio Criterion (DRRC) and Its Verification in Maoshan Tunnel Excavation[J];Engineering Science;2002-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved