|
1 |
HUANG Hong-wei , BIAN Yi-hai (Department of Geotechnical Engineering, Tongji University, Shanghai 200092);Risk Management in the Construction of Deep Excavation Engineering[J];;2005-04 |
2 |
LI Jun-wei,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai,200092 P.R.China);Application of Entropy Measurement in Underground Engineering Risk Assessment[J];Chinese Journal of Underground Space and Engineering;2005-06 |
3 |
BAI Yun~1,TANG Jing~2(1.Shanghai Urban Construction Group,Shanghai 200023,P.R.China;2.Department of Underground Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Management for Underground Project in Soft Soils[J];Chinese Journal of Underground Space and Engineering;2006-01 |
4 |
BIAN Yi-hai~1,HUANG Hong-wei~1,LI Jian~2(1.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092,P.R.China;2.Shanghai Civic Engineering construction and Development Co.Ltd.,Shanghai 200025,P.R.China);Risk Analysis in the Construction stage of Deep Excavation Engineering Based on Dependability Method[J];Chinese Journal of Underground Space and Engineering;2006-01 |
5 |
ZHOU Hong-bo~1,HE Xi-xing~1,JIANG Jian-jun~2,CAI Lai-bing~1 (1.Shanghai Jianke Project Management Co.Ltd.,Shanghai 200032,China;2.Sichuan Province C.D.Highway Planning,Survey,Design and Research Institute,Chengdu 610041,China);Risk Identification and Handling in Construction of Metro Shield Tunnel Project[J];Chinese Journal of Underground Space and Engineering;2006-03 |
6 |
LI Jian(School of Economics and Management,Shanghai Construction Engineering Administration Co.,Ltd,Shanghai 200031,China);Fuzzy Synthetic Evaluation on Risk of Submerged Floating Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-02 |
7 |
WANG Jing1,WANG Peng-fei2,TAN Yue-hu1(1.Engineering Institute of Engineering Corps,PLA University of Science and Technology,Nanjing 210007,China;2.95949 Unit of PLA,Hebei 061022,China);Study on Risk Management of Subway Tunnel Engineering during Construction Process[J];Chinese Journal of Underground Space and Engineering;2009-02 |
8 |
WU Jian1,2,HUANG Jun3,LI Lian-sheng3,XUE Ya-dong1,2(1.Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China;2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China; 3.Southwest Communication Construction Group Ltd.,Kunming 650032,China);Portal Instability Risk Analysis of Highway Tunnel Based on Specialists Method[J];Chinese Journal of Underground Space and Engineering;2009-S1 |
9 |
DU De-quan, YUAN Zan-liang;The Risk Decision of Real Estate Inverstment Based on Dynamic-fuzzy-overall Evaluation[J];Commercial Research;2003-11 |
10 |
Jiao xiuwen; Zhou xiaode;Techno-economic Comparison and Risk Analysis of Two Different Approahes for a Barge Line Service[J];Ship Engineering;1995-04 |
|