Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Anhui Architecture》 2011-05
Add to Favorite Get Latest Update

Construction Control of Part of the Cable- Stayed Bridge with Prestressed Concrete

【CateGory Index】: U448.27
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 LIN Yu-sen~(1,2),ZHANG Yun-bo~2,QIANG Shi-zhong~1(1. School of Civil Engineer, Southwest Jiaotong University, Chengdu 610031, China;2. School of Civil Engineering, Shijiazhuang Railway Institute, Shijiazhuang 050043, China);A Study on Construction Monitor Control of Extrados Bridges[J];Highway;2005-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Shan-hong~1,JIANG Zi-qiang~2 (1.Department of Bridge and Structure,Chongqing Jiaotong University,Chongqing,400074,China;2.Highway Planning Survey,Design and Research Institute,Sichuan Province Communications Department,Chengdu 610041,China);The study on construction control of Maxiaoxi bridge across the Jialingjiang river[J];Sichuan Building Science;2006-01
2 Han Fuqing(School of Civil Engineering,Hefei University of Technology,Hefei,230009) Hu Ke(The institute of design & survey of Anhui Province,Hefei,230041) Kou Mingguo(School of Civil Engineering,Hefei University of Technology,Hefei,230009);COMPUTING EMULATION OF CONTROL OVER CONSTRUCTION OF LARGESIZED HIGHWAY BRIDGE OVER YANGTZ RIVER IN ANQING[J];Journal of Anhui Institute of Architecture;2002-03
3 LIU San-qi1,HU Cheng2,JIANG Tian-xiao3(School Of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Experiment research on prestress tube frictional resistance of PC beam bridge[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2010-02
4 LIN Wen-quan1,ZHU Er-yu2,SUN Ling3 (1.The Fourth Survey and Design Institute of China Railways,Wuhan 430063,China;2.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China;3.Beijing Municipal Engineering Research Institute,Beijing 100037,China);Application of the First-Order Optimization Method in Adjustment of the Force of Cable[J];Journal of Beijing Jiaotong University;2007-04
5 WANG Jian-hua,YANG Ying-hao,KANG Jian-qiang,CHEN Feng-xiang(Key Laboratory of Bridge and Tunnel Engineering of Shanxi Province,Chang'an university,Xi′an 710064,China);Development of tension measurement sensor for stranded wire[J];Transducer and Microsystem Technologies;2010-05
6 ZHU Jin-yong (College of Civil Engineering,Lanzhou Jiaotong University,Lanzhou 730070,China);Analysis of affecting construction during closing of prestressed concrete continuous girder bridge[J];Journal of Henan University of Urban Construction;2009-03
7 LIU Shan-hong~1,QIAN Yong-jiu~2(1.Post-Doctoral Research Station of Traffic and Transp. Eng., Southwest Jiaotong University, Chengdu 610031, China;2.School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China);Research on web cracking control of long span PC box girder bridge[J];Journal of Chongqing Jiaotong University;2005-04
8 HUANG Hai-dong~1,XIANG Zhong-fu~1,LIU Zhi-hui~1,SHUN Jun-ling~2,QANG Lu~11.School of Civil Engineering & Architecture, Chongqing Jiaotong University, Chongqing 400074,China; 2.T.Y.lin International of Chongqing, Chongqing 400010, China;Study on construction control project for Chongqing Shibanpo bridge[J];Journal of Chongqing Jiaotong University;2005-06
9 SUN Ji-biao XIANG Zhong-fu QIU Lin LIU Yong-ke (School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Heavy Pressure Program Design in Construction Control of Chongqing Chao Tianmen Yangtze River Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2008-04
10 QIN Xu-yong1,LIU Ding-bo1,XIONG Qian2(1.Chengdu Fangzhou Construction Project Management Co.Ltd,Sichuan Chengdu 610031,China;2.Third Design & Research Institute of Chongqing Mechanic Industry,Chongqing 400039,China);Research on the Strengthening Technology of Replacing Concrete in Mid-span of the Continuous Rigid Frame Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2008-06
China Proceedings of conference Full-text Database 4 Hits
1 Li Peixun China Jingye Engineering Co.Ltd.Beijing 100088;The retard-bonded prestressed technique Development and Prospects[A];[C];2008
2 WANG Hang (Beijing General Municipal Engineering Design and Research Institute,Beijing 100045, China);Simulation and Management of A Steel-Concrete Composite Beam Constructed By the Measure of No-Temporary-Support[A];[C];2006
3 GUO Yan-lin,LIU Xue-wu,ZHANG Qing-lin,LIU Lu-yu,DOU Chao (Tsinghua University,Beijing 100084,China);Study and Application of Mechanical Problems During Construction Process of Complex Steel Structures[A];[C];2006
4 Gao Zhenfeng~1,Wu XiaoPing~1,Wang Yunfei~2 (1.Shanghai Construction Group General Co.,Shanghai 200120,China; 2.Shanghai Mechanized Construction Co.,Ltd.,Shanghai 200072,China);Study and Application of Construction Control Technique of Super-large Steel Structure[A];[C];2008
【Secondary Citations】
Chinese Journal Full-text Database 6 Hits
1 LIN Yu-sen~(1,2),ZHANG Yun-bo~2,QIANG Shi-zhong~1(1. School of Civil Engineer, Southwest Jiaotong University, Chengdu 610031, China;2. School of Civil Engineering, Shijiazhuang Railway Institute, Shijiazhuang 050043, China);A Study on Construction Monitor Control of Extrados Bridges[J];Highway;2005-05
2 Liu Jian,Li Chuanxi,Liu Yang,Xia Guiyun,Zhang Jianren;On Site Control of Construction Process of Multi-Tower Cable Stayed Bridges[J];Technology of Highway and Transport;2006-01
3 Wang Junxi, Qie Caifu, Zhang Ziran(1. Civil Engineering and Architecture College, Lanzhou Railway University, Lanzhou 730070,China; 2. Xiamen Municipal Administrative Constructive Headquarters, Xiamen 361012, China);Construction Controlling of Single Tower and Single Cable Prestressed Concrete Partition Cable Bridge[J];Journal of Lanzhou Railway Institute;2002-06
4 SUN Jian yuan, SHI Xue fei (Department of Bridge Engineering, Tongji University, Shanghai 200092, China);Construction Engineering Control of Zhangzhou War Preparation Bridge[J];Bridge Construction;2002-01
5 OUYANG Yong jin, WU Li qing (Xiamen Municipal Administration Construction Headquarters, Xiamen 361012, China;Construction Control of Single Pylon Single Cable Plane Single Row Prestressed Concrete Extradosed Cable-stayed Bridge[J];Bridge Construction;2002-06
6 LIU Chenglong1, CHEN Qiang1, LI Zhenwei2(1. Southwest Jiaotong University, Chengdu 610031, China; 2. Guangdong Changda Highway Engineering Co., Ltd., Guangzhou 510075, China);Influence of Temperature on Elevation of Long Cantilever Box Girder Cast with Balanced Cantilever Method and Countermeasures Against Temperature Influence[J];Bridge Construction;2003-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved