Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Anhui Architecture》 2011-06
Add to Favorite Get Latest Update

Construction Technology of Bracket Method of Long-Span Continuous Box Girder

【CateGory Index】: U445.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Shan-hong~1,JIANG Zi-qiang~2 (1.Department of Bridge and Structure,Chongqing Jiaotong University,Chongqing,400074,China;2.Highway Planning Survey,Design and Research Institute,Sichuan Province Communications Department,Chengdu 610041,China);The study on construction control of Maxiaoxi bridge across the Jialingjiang river[J];Sichuan Building Science;2006-01
2 Han Fuqing(School of Civil Engineering,Hefei University of Technology,Hefei,230009) Hu Ke(The institute of design & survey of Anhui Province,Hefei,230041) Kou Mingguo(School of Civil Engineering,Hefei University of Technology,Hefei,230009);COMPUTING EMULATION OF CONTROL OVER CONSTRUCTION OF LARGESIZED HIGHWAY BRIDGE OVER YANGTZ RIVER IN ANQING[J];Journal of Anhui Institute of Architecture;2002-03
3 LIU San-qi1,HU Cheng2,JIANG Tian-xiao3(School Of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Experiment research on prestress tube frictional resistance of PC beam bridge[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2010-02
4 Li Yunqi (The First Engineering Co., Ltd of CCCC. Second Highway Engineering Bureau, Wuhan 430000, China);On the Construction Technology of Post-tensioned Prestressing[J];Anhui Architecture;2008-02
5 Peng Shenkai(Anhui Provincial Road & Bridge Engineering Company,Hefei 230001,China);Construction Process of Occlusive Pile in "Smooth Yihuan Road Traffic Project"[J];Anhui Architecture;2008-05
6 ZHANG Guang-xian(China Railway 14th Bureau Group Co.,Ltd,Jinan 250061,China);Bored Pile Foundation Reinforcement Technology in Tunnel Silt-filled Caverns[J];Chinese Journal of Underground Space and Engineering;2009-04
7 LIN Wen-quan1,ZHU Er-yu2,SUN Ling3 (1.The Fourth Survey and Design Institute of China Railways,Wuhan 430063,China;2.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China;3.Beijing Municipal Engineering Research Institute,Beijing 100037,China);Application of the First-Order Optimization Method in Adjustment of the Force of Cable[J];Journal of Beijing Jiaotong University;2007-04
8 ZHU Jin-yong (College of Civil Engineering,Lanzhou Jiaotong University,Lanzhou 730070,China);Analysis of affecting construction during closing of prestressed concrete continuous girder bridge[J];Journal of Henan University of Urban Construction;2009-03
9 LIU Shan-hong~1,QIAN Yong-jiu~2(1.Post-Doctoral Research Station of Traffic and Transp. Eng., Southwest Jiaotong University, Chengdu 610031, China;2.School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China);Research on web cracking control of long span PC box girder bridge[J];Journal of Chongqing Jiaotong University;2005-04
10 HUANG Hai-dong~1,XIANG Zhong-fu~1,LIU Zhi-hui~1,SHUN Jun-ling~2,QANG Lu~11.School of Civil Engineering & Architecture, Chongqing Jiaotong University, Chongqing 400074,China; 2.T.Y.lin International of Chongqing, Chongqing 400010, China;Study on construction control project for Chongqing Shibanpo bridge[J];Journal of Chongqing Jiaotong University;2005-06
China Proceedings of conference Full-text Database 8 Hits
1 WANG Xu’an (Zhengzhou Zhongyuan Railway Engineering co.ltd,Zhengzhou Henan 450052, CHINA);Study on the Causes and Counter Measures for Differential Settlement at Railway Bridgehead[A];[C];2008
2 An Guoyong Zhang Guoqiang Zou Chao Wang Yangshe (China zhongtie Engineering Company Limited, a fourth of the first Bureau, the 8# of Yuquan Road West zhongtie Building of Xianyang City, Shanxi Province Zip 712000);Cable Crane with the overall 100-meter-high pier of platform in the "V"-type bridge of Apply[A];[C];2008
3 ;扇形箱格之圆沉箱浮游稳定的计算方法[A];[C];2009
4 Liu Weijun,Huang Chao,Zhao Lei Shanghai No.1 Municipal Engineering Co.,Ltd.,200083,Shanghai,China;Lift of U-shaped Beam Crossing Zhoupu Pond in Contract V of Pujiang Town Public Transport Supporting Project[A];[C];2010
5 WANG Hang (Beijing General Municipal Engineering Design and Research Institute,Beijing 100045, China);Simulation and Management of A Steel-Concrete Composite Beam Constructed By the Measure of No-Temporary-Support[A];[C];2006
6 GUO Yan-lin,LIU Xue-wu,ZHANG Qing-lin,LIU Lu-yu,DOU Chao (Tsinghua University,Beijing 100084,China);Study and Application of Mechanical Problems During Construction Process of Complex Steel Structures[A];[C];2006
7 Gao Zhenfeng~1,Wu XiaoPing~1,Wang Yunfei~2 (1.Shanghai Construction Group General Co.,Shanghai 200120,China; 2.Shanghai Mechanized Construction Co.,Ltd.,Shanghai 200072,China);Study and Application of Construction Control Technique of Super-large Steel Structure[A];[C];2008
8 You Qingzhong~1 He Ping~1 Dong Xuewu~1 Zhang Xigang~2 Wu Shouchang~1 (1.Jiangsu Provincial Su-Tong Bridge Construction Headquarter,Nantong Jiangsu 226010; 2.CCCC Highway Planning and Design Institute,Beijing 100010);Key Techniques for Construction of Su-Tong Bridge with a Main Span of 1088m[A];[C];2009
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved