Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Anshan Teachers College》 2002-01
Add to Favorite Get Latest Update

The Status and Advances of Flexible Flow Shop Scheduling Problem

WANG Li ZHU Jing (Anshan Normal University,Anshan Liaoning 114005,China)  
The flexible flow shop environment is fairly co mmon in flow industries such as the steel, petroleum industries and chemical pro cessing. In this paper, an overview of status and development of flexible flow s hop scheduling problem are presented.
【Fund】: 辽宁省教委及鞍山师范学院科研基金资助项目
【CateGory Index】: TH165
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
China Proceedings of conference Full-text Database 2 Hits
1 Zhang hong-yuan, Xi yu-geng, Gu han-yu Institute of Automation. SJTU. Shanghai, 200030;A decomposition strategy for Flow-shop problem with multiple delivery time based on bottleneck[A];[C];2004
2 Zou Feng-xing,Zeng Ling-li,Gao Zheng,Liu Feng Department of Automatic Control,College of Mechatronics and Automation,National University of Defense Technology, 410073,Changsha,P.R.China;A Distributed Approach to Solving Hybrid Flow-shop Scheduling Problem[A];[C];2009
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Wang Li,Wang Mengguang;No Wait Hybrid Flow Shop Scheduling Problem Based on Just In Time[J];JOURNAL OF NORTHEASTERN UNIVERSITY;1998-04
2 LIU Jinkun WANG Shuqing (National Laboratory of Industrial Control Technology, Zhejiang Univ, Hangzhou 310027) XU Xinhe SU Shiquan (Northeastern University,Shenyang 110006) WU Shijie (Shenyang College of Technology 110015);FUZZY PREDICTION SYSTEM FOR BLAST FURNACE HEAT STATE[J];INFORMATION AND CONTROL;1997-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LI Mao jun 1; TONG Tiao sheng 2 (1.Dept. of Electr. Eng., Changsha Univ. of Electr. Power, Changsha 410077,China; 2.College of Electr. & Information Eng., Hunan Univ., Changsha 410082,China);Analysis of Partheno-genetic Algorithm's Encoding Methods[J];JOURNAL OF CHANGSHA UNIVERSITY OF ELECTRIC POWER(NATURAL SCIENCE);2000-03
2 Li Maojun (Dept. of Electr. Eng. Changsha Univ.of Electr.Power Changsha 410077) Qiu Lifang (Hunan Machinery Industry School Changsha 410007) Tong Tiaosheng (Dept. of Electr. Eng.Hunan Univerity Changsha 410082);Analysis on Searching Efficiency of ParthenoGenetic Algorithm[J];JOURNAL OF CHANGSHA UNIVERSITY OF ELECTRIC POWER(NATURAL SCIENCE);1999-01
3 MA Ke, WANG Jun, FENG Tao, XIAO Yuan (College of Mechanical and Electrial Eng.,XAUEST,Xi'an 710048,China);A mathematic model for Job-shop scheduling based on hybrid[J];Basic Sciences Journal of Textile Universities;2004-01
4 LIU Guang-hang, LI Tie-ke (School of Management, Beijing University of Science and Technology, Beijing 100083, China);A Steelmaking-Continuous Casting Production Scheduling Model and Its Heuristic Algorithm[J];Systems Engineering;2002-06
5 Sun Wu-sheng,Mao Ning,Chen Qing-xin(Faculty of Electromechanical Engineering,Guangdong University of Technology,Guangzhou 510090,China);A Heuristic Algorithm for Mould's Electrode Scheduling Combined with Process of CNC and EDM[J];Industrial Engineering Journal;2008-02
6 Yin Zhao-tao,Li Tie-ke(School of Economics and Management,University of Science and Technology Beijing,Beijing 100083,China);Hybrid Algorithms for Hybrid Flowshop Scheduling Considering Due Dates and Limited Wating Times[J];Industrial Engineering Journal;2009-01
7 LI Mao jun , TONG Tiao sheng (College of Electrical and Information Engineering,Hunan Univ,Changsha 410082,China);Application of Partheno-genetic Algorithm in Flow-shop with Multiple Processors[J];Journal of Hunan University(Naturnal Science);2001-05
8 Li Maojun Tong Tiaosheng Luo Longfu (Dept of Electrical Engineering,Hunan Univ,410082,Changsha,P R China);Partheno Genetic Algorithm and Its Application[J];JOURNAL OF HUNAN UNIVERSITY(NATURNAL SCIENCE);1998-06
9 Luo Richeng 1 Li Maojun 1 Tong Tiaosheng 21 (Dept.of Electr.Power Eng.,Changsha Univ.of Electr.Power.,Changsha410077) 2 (College of Electr.Information Eng.,Hunan Univ.,Changsha410082);Flow-Shop Problem Based on A Partheno-Genetic Algorithm Solving Method[J];Computer Engineering and Applications;2002-02
10 YIN Wen-jun,LIU Min,WU Cheng (Department of Automation, Tsinghua University,Beijing 100084,China);Currnet Staus and Prospect of Evolutionary Computation Applied to Production Scheduling[J];Computer Integrated Manufacturing Systems;2001-12
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Zhou Hong Cai Miaofeng\ Feng Yuncheng (Beijing University of Aeronautics and Astronautics,School of Management);KIND OF GENETIC ALGORITHM FOR SOLVING FlOW SHOP SEQUENCING PROBLEMS[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1997-04
2 Han Limin\ Huang Hongxuan\ Feng Yuncheng (Beijing University of Aeronautics and Astronautics,School of Management);Job Shop Scheduling by Simulated Annealing Algorithm Combined with Tabu Search[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1998-01
3 Shen Yingjun\ Huang Haijun (Beijing University of Aeronautics and Astronautics,Dept. of School of Management) Wu Sa (Beijing University of Aeronautics and Astronautics,Dept. of System Engineering of Engineering Technology) Wu Jing (Beijing University;New Scheduling Heuristic for the Permutation Flowshop Problem[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1998-01
4 ZHENG Dawei, GEN Mitsuo (Department of Industrial and Systems Engineering Ashikaga Institute of Technology, Ashikaga, 326 Japan);Hybrid Genetic Algorithms with Fuzzy Logic Controller[J];Journal of University of Science and Technology Beijing;2002-01
5 CUI Jianshuang, LI Tieke, ZHANG Wenxin Management School, University of Science and Technology Beijing, Beijing 100083, China;Hybrid flowshop scheduling model and its genetic algorithm[J];Journal of University of Science and Technology Beijing;2005-05
6 TU De sheng (Department of Mathematics,Physics and Mechanics, Changsha Railway University, Changsha 410075,China);The Mathematical Modeling of the Placing of the Workpieces in a Production Line[J];JOURNAL OF CHANGSHA RAILWAY UNIVERSITY;2000-02
7 GU Xin-jian,ZHU Wan-gui,QIU Jin-dong (Mechanical Dept. of Zhejiang University, Hangzhou 310027,China);Mass Customization: the Main Production Mode in Future[J];Group Technology & Production Modernization;2002-02
8 Wang Li,Wang Mengguang;No Wait Hybrid Flow Shop Scheduling Problem Based on Just In Time[J];JOURNAL OF NORTHEASTERN UNIVERSITY;1998-04
9 LU Fei, TIAN Guo-hui, JIA Lei (School of Control Science and Engineering, Shandong University, Jinan 250061, China);Solution to hybrid Flowshop scheduling problem using a multigroup parallel and adaptive genetic algorithm[J];Electric Machines and Control;2002-01
10 KE Jing1, QIAN Ji-xin2, QIAO Yi-zheng1 (1. School of Control Science and Engineering, Shandong University, Jinan 250061, China; (2. Institute of Systems Engineering, Zhejiang University, Hangzhou 310027, China );A Modified Particle Swarm Optimization Algorithm[J];Journal of Circuits and Systems;2003-05
【Secondary References】
Chinese Journal Full-text Database 4 Hits
1 WANG He-ping, SUN Wei-wei (School of Management Science and Engineering, Anhui University of Technology, Ma'anshan 243002, China);Application of the TOPSIS in Multi-objective Mix-assembly Line Sequencing[J];Logistics Sci-Tech;2009-09
2 ZHANG Yu, WANG Shao-mei (College of Logistic Engineering, Wuhan University of Technology, Wuhan 430063, China);Research of Dynamic Berth Allocation of Continuous Case Based on GA[J];Journal of System Simulation;2007-10
3 SONG Hua-ming~(1,2),MA Shi-hua~1 (1.College of Management,Huazhong University of Science and Technology,Wuhan 430074,China;2.Institution of Economy Management,Nanjing University of Science & Technology,Nanjing 210094,China);Co-optimization for Mixed-Model Assembly Flow Line to Minimize Makespan[J];Systems Engineering-Theory & Practice;2007-02
4 FENG Li-juan,YAN Hong-sen(Ministry of Edu.Key Lab.of Measurement and Control of CSE,Southeast Univ.,Nanjing 210096,China;School of Automation,Southeast University,Nanjing 210096,China);A New Algorithm about Products Sequencing Optimization for Mixed-Model Assembly Line with Consideration of Line Balancing[J];Computer Technology and Development;2010-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved