Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Anhui Technical College of Water Resources and Hydroelectric Power》 2007-01
Add to Favorite Get Latest Update

Application of grouting technique in the reservoir reinforcing project

YU Min-xiao (Management Office of Longhekou Reservoir,Shucheng 231360,China)  
Split grouting fills dams'cracks and caves and compress earth,and get the purpose of reinforcing dams and preventing seepage.The paper introduces the gouting construction course and technics combining subsidiary dams reinforcing project of Longhekou reservoir.
【CateGory Index】: TV543
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 HE Jun-shi et al (College of Water Conservancy,Shenyang Agricultural University,Shenyang,Liaoning 110161);Investigation of the Present Situation of Reservoir in Shenyang City and its Countermeasure[J];Journal of Anhui Agricultural Sciences;2006-19
2 LI Guo qi 1, ZHAO Jue rui 2 (1. Anhui Pishihang Irrigation District Administration Bureau, Lu'an 237005, China; 2. Tongcheng Water Conservancy Bureau; Tongcheng 231400, China);Application of spliting grouting method to the crack of earth dam[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2003-03
3 ZHANG Zheng-gen (Anhui Water Engineering Construction and Installation General Company, Hefei 230022, China);Enclosed-well test for anti-seepage wall in Hengpaitou project by swaying-jet-grouting[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2004-03
4 ZHANG Lai~1,XU Feng-yong~2(1.Chizhou Urban Flood Control Management Division, Chizhou 247100, China;2.Anhui Technical College of Water Resources and Hydroelectric Power, Hefei 230601, China);The application of the techniqiue of building the wallby jetting water to the levee reinforcement[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2004-04
5 WAN Neng-sheng~1,Xue Jie~2(1.Chaohu Conservancy Bureau,Chaohu 238000,China,2.Juchao District Water Conservancy Bureau,Chaohu 238000,China);A case of hermetic mortar-injection in rectifying a deviation in hydraulic engineering buildings[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2006-04
6 JIN Xiang-hong (Simashan Engineering Management Department of Anhui Province,Hexian County 238251,China);Quality control of the wall of cutting off seepage of multiple small-diameter deeply mixing pile[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2008-02
7 NI Zhu-bian(Fengyangshan water Reservoir Management Office,Fengyang 233132,China);Analyzing and dealing with problems on grouting the large dam of Fengyangshan water reservoir[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2009-01
8 ZHU Shou-qi(Anhui Technical College of Water Resources and Hydroelectric Power,Hefei 231603,China);The application of the clay-cementmortar in reinforcing the culvert of the small reservoir[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2009-01
9 LI Si shen (Construction Management Bureau of Hidden Engineering on Changjiang Major Levee, Changjiang Water Resources Commission,Wuhan 430010,China);Seepage prevention treatment in construction of hidden engineering for Changjiang's major levees[J];Journal of Yangtze River Scientific Research Institute;2000-S1
10 HUANG Yang-yi (No.9 Exploration Institute of Changjiang Water Resources Commission,Yueyang,Hunan 414000,China);Thoughts on Heightening and Widening of Dykes[J];Journal of Changjiang Vocational University;2001-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved