|
1 |
HUANG Cheng-zao1,YAN Zong-xue1,ZHANG Xiao-rong3(1.HuangPu Bridge of Pearl River Construction Ltd.in Guangzhou,Guangzhou 510735,P.R China;2.The First Highway Survey & Design Institute,Xi'an 710075,P.R.China);Cross Anchor and Its Application in the Fracture Zone in Highway Tunnel[J];Chinese Journal of Underground Space and Engineering;2007-05 |
2 |
LEI Jin-shan1,YANG Jun-sheng1,ZHOU Can-lang2,SU Wei1,YANG Xiu-zhu1(1.School of Civil and Architectural Engineering,Central South University,Changsha 410075,China;2.Guangzhou Metro Design Academe,Guangzhou 510010,China);Study on simulating material test of karst geological model of Guangzhou railway traffic[J];Journal of Railway Science and Engineering;2007-06 |
3 |
LEI Jin-shan1,SU Feng2,YANG Jun-sheng1,CHEN Fu-quan2,ZHOU Can-lang3(1.School of Civil and Architectural Engineering,Central South University,Changsha 410075,China;2.College of Civil Engineering,Fuzhou University,Fuzhou 350002,China;3.Guangzhou Metro Design Academe,Guangzhou 510010,China);Effect behaviors of caves on tunneling in karst area[J];Journal of Railway Science and Engineering;2008-02 |
4 |
Ye Ying (Beijing Municipal Engineering Research Institute,Beijing 100037,China);Research on Geological Prediction System of Underground Engineering Construction[J];Chinese Journal of Engineering Geophysics;2009-01 |
5 |
ZENG YuyingZHENG Xiaozhan(Guangzhou Geological Survey,Guangzhou510440);FUZZY EVALUATION METHOD FOR KARST COLLAPSE RISKS[J];Journal of Engineering Geology;2007-01 |
6 |
LUO Qiang~1,TAN Han-hua~2,LONG Wan-xue~2,CHEN Yong~2(1.Communication Department of Guizhou Province,Guizhou Guiyang 550003,China;2.Guizhou Communication Planning and Surveying Design Institute,Guizhou Guiyang 550001,China);Survey of Highway Bridge Foundation and Stability Evaluation of Cave in Carst Region[J];Journal of Highway and Transportation Research and Development;2006-02 |
7 |
YANG Xiu-zhu,LEI Jin-shan,YANG Jun-sheng,SU Wei (School of Civil and Architectural Engineering,Central South University,Changsha 410075,China);Model test on subway tunnel in karst regions[J];Journal of Railway Science and Engineering;2009-04 |
8 |
YE Ying(Beijing Municipal Engineering Research Institute,Beijing 100037,china);Tunnel Synthetical Parameter Method Geological Prediction Technique Research[J];Geology and Exploration;2009-04 |
9 |
ZHANG Bo1,TAO Lianjin1,MENG Yunwei2,SUN Guofu1(1.School of Civil and Architecture Engineering,Beijing University of Technology,Beijing 100022,China;2.Chongqing Communications Research & Design Institute,Chongqing 400067,China);Study of Failure Mechanism of Gabion Retaining Wall under Vibrating Compaction Using PFC[J];Journal of Highway and Transportation Research and Development;2009-10 |
10 |
YANG Xiang-liang XIAO Rong;The side slope construction process and stability analysis in tunnel portal eccentric loading section[J];Shanxi Architecture;2009-08 |
|