The Top-down Construction Technique for Super Foundation of Changfeng Building

DENG Wen-long (Shanghai NO.2 Construction Co.Ltd, Shanghai 200080, China)  
This paper presents the top-down construction technique for a deep foundation of Changfeng Building. The foundation of main building is constructed with ordinary excavation method and for the annex building. the top-down method is applied. During the construction, in order to keep the ordinary running of nearby subway, the following techniques are employed: one column to one pile, deep groundwater lowering, block excavation, large volume concrete casting, no transit of subway. Finally, this project with large top-down excavation is successfully completed under the specific condition.
【CateGory Index】: TU753
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 6 Hits
1 Li Shoubiao1,Li Shixiong1,Wei Zilong2(1.College of Environment and Resources,Southwest University of Science and Technology,Mianyang, Sichuan 266510,China;2.Key Lab of Rood and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 201804,China);Regularity of Supporting Axial Forces of Deep Foundation Pit with Semi-top-down Method in Soft Ground[J];Chinese Journal of Underground Space and Engineering;2012-04
2 SHEN Kai-peng1,WEI Xi-ling2,JIA Jian-hua2,XIANG Wei-ming1(1.School of Civil Engineering,Guangzhou University,Guangzhou 510006,China; 2.Guangzhou Air Defence Institute of Architectural Design Co.,Ltd.,Guangzhou 510500,China);Design and analysis of joint of slab-column of underground engineering by top-down method[J];Journal of Guangzhou University(Natural Science Edition);2012-06
3 ;Study on Key Technology of Positive Top-Down and Double-Way Synchronous Construction for Super Tall Commercial Building[J];Building Construction;2012-03
4 WANG Jian-hua,XU Zhong-hua(Department of Civil Engineering,Shanghai Jiao Tong University, Shanghai 200030,China);State of Deep Excavations Supported with Permanent Structure[J];Journal of Nanchang Institute of Technology;2007-01
5 Xiang Weiming;Shen Kaipeng;School of Civil Engineering,Guangzhou University;Xiaonan Engineering Quality Supervision and Management Center;;Study on Structural Deformation of Oversize Underground Spacein Coastal Area by the Top-down Method[J];Special Structures;2014-01
6 WAN Zhi-hui1,LU Zhong-wei1,DAI Bin 2(Shanghai Bao Steel Construction Group,Shanghai 201900,China);Application of reverse construction technology in Shanghai Cao’an Commercial and Trade City[J];Chinese Journal of Geotechnical Engineering;2006-S1
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Deng Wenlong Jang Shujie Xi Jinhu;Environment Control of Top-Down Construction Method for Deep Foundation Pit in Downtown Area[J];Building Construction;2003-06
2 Jiang Shu Jie;Application and Prospective Review on Reserved Construction Method for Urban Underground Space Development[J];Building Construction;2004-04
3 Wu Xian;Measurement and Analysis of Reserved Construction Method for Extra Large Basement in Shanghai Chang Feng Commercial Mart[J];Building Construction;2004-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Jian-hua~1 , XU Zhong-hua~1 , CHEN Jin-jian~1 , WANG Wei-dong~2 (1. Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200030, China; 2. East China Architectural Design & Research Institute Co.Ltd., Shanghai 200002, China);Deformation Properties of Diaphragm Wall Due to Deep Excavation in Shanghai Soft Soil[J];;2005-04
2 GAO Yan-bin1,ZHANG A-jin1,2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China);STUDY ON THE CHOICE OF SOIL PRESSURE IN THE TOP-DOWN CONSTRUCTION OF SOFT SOIL AREA[J];Low Temperature Architecture Technology;2010-03
3 SHEN Kai-peng1,WEI Xi-ling2,JIA Jian-hua2,XIANG Wei-ming1(1.School of Civil Engineering,Guangzhou University,Guangzhou 510006,China; 2.Guangzhou Air Defence Institute of Architectural Design Co.,Ltd.,Guangzhou 510500,China);Design and analysis of joint of slab-column of underground engineering by top-down method[J];Journal of Guangzhou University(Natural Science Edition);2012-06
4 Jing Shaodong;Shengli Oilfield Shengli Engineering & Consulting Co.Ltd;;Numerical Analysis of Pit Displacement in Strata of “Soil-rock” Dualistic Structure at Top-down Work[J];Chinese Journal of Underground Space and Engineering;2013-06
5 ;Practice on Structural Construction of Ultra Deep Foundation Pit with Top-Down Construction Method for You-You International Plaza Project[J];Building Construction;2006-07
6 Hu Yuyin;The Third Lecture:Construction Organization for Super Tall Building-Part Ⅲ[J];Building Construction;2007-07
7 ;Relying on Enterprise's Core Technology,Improving Project Management Ability of General Contract[J];Building Construction;2007-09
8 ;Construction Schedule and Progress Control for Super Tall Building[J];Building Construction;2008-08
9 ;Study on Key Technology of Positive Top-Down and Double-Way Synchronous Construction for Super Tall Commercial Building[J];Building Construction;2012-03
10 ZENG Shuang1 YANG Feng-liang2(1.Architecture Design & Research Institute Co.,Ltd of Tongji University,Shanghai 200000,China; 2.Shanghai Construction Group Co.,Ltd,Shanghai 200052,China);Study on the differential settlement control technology in bidirectional synchronization construction[J];Shanxi Architecture;2012-16
China Proceedings of conference Full-text Database 4 Hits
1 WANG Jian-hua, XU Zhong-hua, CHEN Jin-jian, WANG Wei-dong (Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200030, China; East China Architectural Design & Research Institute Co. Ltd., Shanghai 200002, China);Deformation Properties of Diaphragm Wall Due to Deep Excavation in Shanghai Soft Soil[A];[C];2005
2 DENG Wen-long (Shanghai NO.2 Construction Co. Ltd, Shanghai 200080, China);The Top-down Construction Technique for Super Foundation of Changfeng Building[A];[C];2005
3 WANG Jian-hua, XU Zhong-hua, CHEN Jin-jian, WANG Wei-dong ( Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai 200030, China; East China Architectural Design & Research Institute Co.Ltd., Shanghai 200002, China);Deformation Properties of Diaphragm Wall Due to Deep Excavation in Shanghai Soft Soil[A];[C];2005
4 DENG Wen-long (Shanghai NO.2 Construction Co.Ltd, Shanghai 200080, China);The Top-down Construction Technique for Super Foundation of Changfeng Building[A];[C];2005
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Hai-Jiao1,CAO Zi-jiang2,ZHANG Xi-zuo3(College of Water Conservancy and Civil Engineering,Hefei University of Technology,Hefei 230009,China);The application and finite element analysis of the pile-anchor system in deep foundation[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2011-01
2 Wu Hongbing et al.;Semi-Top-Down Construction Technology at the Jinanshi Station of Metro Line No.2 in Shanghai[J];Underground Space;1998-S1
3 GAO Wei et al.(81)[;Development of Research on Uncertain Back Analysis in Geotechnical Engineering[J];UNDERGROUND SPACE;2000-02
4 WANG ZHi liang et al.;Application of Genetic and Improved BP Algorithms in Geotechnical Engineering[J];Underground Space;2001-03
5 GAO Guang-yun et al.;Application of Genetic Algorithm-BP Neutral Networks in Monitoring of Deep Foundation Pit Excavation[J];Underground Space;2002-04
6 GUO Sheng-bing et al.;Dynamic Analysis of Underground Structures under the Vertical and Horizontal Seismic Load[J];Underground Space;2002-04
7 DING Chun lin;Analysis of Spatial Load on Metro Station with Structural Joints[J];Underground Space;2003-03
8 Li Jia1,2 , JIAO Cang1 , FAN Peng1 , XU Cheng-jia1(1. China Railway Tunnel Group Co. Ltd. Luoyang 471009, P. R. China;2. Tianjin University, Tianjin 300072, P. R. China);Analysis and Application of Prediction for Displacement of Support Construction in Metro Foundation Pit[J];;2005-03
9 WANG Wei-dong~1 , WU Jiang-bin~1 , HUANG Shao-ming~2 (1. East China Architecture Design Institute, Shanghai 200002; 2. Shanghai Modern Architectural Design (GROUP)Co.LTD, Shanghai 200041);Recent Progress and Characteristics of Pit Foundation in Shanghai[J];;2005-04
10 BAI Ting-hui (Shanghai Shentong Metro Co. Ltd, Shanghai 200031, P.R.China);New Technology and Practice Used in Shanghai Metro Deep Excavations[J];;2005-04
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 Li Wei,Liang Zhirong(Shanghai Shenyuan Geotechnical Engineering Co.,Ltd,Shanghai 200040,China);Research of Deep Excavation Design of Super High-Rise Steel Construction Using Top-down Method[J];Chinese Journal of Underground Space and Engineering;2011-05
2 SHEN Kai-peng1,WEI Xi-ling2,JIA Jian-hua2,XIANG Wei-ming1(1.School of Civil Engineering,Guangzhou University,Guangzhou 510006,China; 2.Guangzhou Air Defence Institute of Architectural Design Co.,Ltd.,Guangzhou 510500,China);Design and analysis of joint of slab-column of underground engineering by top-down method[J];Journal of Guangzhou University(Natural Science Edition);2012-06
3 MA Rong1,GU Liang1,HU Jianhua2(1.Infrastructure Division,China Northeast Architecture Design and Research Institute,Shenyang 110006,China;2.School of Resources and Safety Engineering,Central South University,Changsha 410083,China);Mechanical properties and deformation law monitoring of excavation retaining and protection structure on soft ground[J];Journal of Liaoning Technical University(Natural Science);2013-06
4 FANG Chuan-xin1 SONG Xian-kun2 HAO Zong-bao3(1.No.6 Engineering Co.,Ltd of China Railway No.17 Bureau Group,Fuzhou Fujian 350300 China; 2.Nanjing Metro Construction Branch,Nanjing Jiangsu 210008 China; 3.Huainan Production Safety Supervision and Administration Station,Huainan Anhui 232001 China);Measurement Study of Differential Settlement between Diaphragm Wall and Mid Column in Reserved Construction Method[J];Jiangsu Construction;2011-06
5 GU Guo-ming;Real-time monitoring system of super-long steel lattice column veritcality[J];Construction Mechanization;2009-08
6 TANG Xiao-qiang1,2 ZHANG Zhi-hao2 ZHANG Geng-cheng2(1.Environmental Science and Engineering College,Ocean University of China,Qingdao 266100,China; 2.China Petroleum East China Survey & Design Institute Geotechnical Engineering Company,Qingdao 266071,China);Retaining pile and columns difference settlement analysis of a top down method foundation pit[J];Shanxi Architecture;2012-31
7 ;Key Construction Technology for Intermediate Transfer Section in Jiashan Road Station of Shanghai Rail Transit Line No.9[J];Building Construction;2012-09
8 ;Construction Technology for Large Diameter Hole-Digging Pile Combined with Structural Column[J];Building Construction;2013-02
9 SU Yong-bo,ZHANG Xiao—bing,PEI Bing-tuan;Application on Construction Technologies with Reverse Method of Deep Foundation Pit in Soft Soil Area[J];China Concrete and Cement Products;2013-06
10 Lou Jiajun;Application of Upright Cantilever Top-Down Construction Method to Foundation Pit Excavation Support[J];Building Construction;2013-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved