Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Chinese Journal of Underground Space and Engineering》 2005-06
Add to Favorite Get Latest Update

Risk Analysis of Tunnelling Work Period

ZHANG shao-xia,HUANG Hong-wei(Department of Geotechnical Engineering Tongji University,Shanghai 200092 P.R.China)  
In this paper the important factors influencing the work period of tunnel construction are enumerated and the fault tree is setup.Through the analysis of the fault tree,the major causes of the delay of the tunnel work period are found.The results of the analysis will be very useful for the decision making in the future.
【CateGory Index】: U455.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 YAN Wei,LIN Xian,ZHOU Chao-zhang(College of Civil Engineering,Chongqing University,Chongqing 400045,P.R.China);Application of Entropy Measurement to Stability of Rock in Underground Engineering[J];Journal of Chongqing Jianzhu University;2007-01
【Citations】
Chinese Journal Full-text Database 1 Hits
1 XU Shang jin (The First Engineering Company of The 12th Engineering Group of China Railway, Linfen 041000, China);The application of risk management method in tunnel construction[J];Shanxi Architecture;2003-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LI Jun-wei,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai,200092 P.R.China);Application of Entropy Measurement in Underground Engineering Risk Assessment[J];Chinese Journal of Underground Space and Engineering;2005-06
2 CHEN Liang,HUANG Hong-wei,HU Qun-fang(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);A Database for Risk Management in Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2005-06
3 BAI Yun~1,TANG Jing~2(1.Shanghai Urban Construction Group,Shanghai 200023,P.R.China;2.Department of Underground Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Management for Underground Project in Soft Soils[J];Chinese Journal of Underground Space and Engineering;2006-01
4 HUANG Hong-Wei~1,ZENG Ming~2,CHEN Liang~1,HU Qun-fang~1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.General Office of Commanding Post of Shanghai Tunnel & Bridge Construction,Shanghai 200120,China);Risk Management Software (TRM1.0) Based on Risk Database for Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2006-01
5 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd.,Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);The Practice of Risk Management in Shangzhong Road Tunnel Engineering[J];Chinese Journal of Underground Space and Engineering;2006-01
6 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd., Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);Risk Loss Analysis During Construction of Soft Soil Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2006-01
7 LAN Shou-qi1,2,ZHANG Qing-he3,HUA Han-xing2,YE Shan2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092, China;2.Construction Engineering Administration Office of Shanghai Nanhui District, Shanghai 201300,China);RISK MANAGEMENT AND SUPERVISION OF SHIELD TUNNELING[J];Low Temperature Architecture Technology;2007-04
8 YANG Zhen yu(The Supervision Degachmemg of Environmental of Huaibei City,235000,Huaibei,Anhui,China);On Evaluating the Degree of Environmental Pollution of the Projects of the Chemical Industry[J];Journal of Huaibei Coal Industry Teachers College(Natural Science Edition);2009-02
9 LU Meili~① LIU Weining~① LUO Furong~② LI Xinggao~①(①Institute of Tunnel & Geotechnical Engineering,Beijing Jiaotong University,Beijing100044)(② Beijing Metro Construction Management Co.Ltd.,Beijing100037);REVIEW ON RISK ASSESSMENT METHODS FOR TUNNELLING AND UNDERGROUND PROJECTS[J];Journal of Engineering Geology;2006-04
10 ;Application of Hierarchical Analysis Procedure to the Design of Risk Evaluation Model for Special Equipment[J];Construction Machinery and Equipment;2009-01
【Co-references】
Chinese Journal Full-text Database 3 Hits
1 LI Jun-wei,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai,200092 P.R.China);Application of Entropy Measurement in Underground Engineering Risk Assessment[J];Chinese Journal of Underground Space and Engineering;2005-06
2 HUANG Hong-wei(Dept.of Geotechnical Engineering,Tongji University,Shanghai 200092,China);State-of-the-Art of the Research on Risk Management in Construction of Tunnel and Underground Works[J];Chinese Journal of Underground Space and Engineering;2006-01
3 Zhong Denghua Zhang Jianshe (College of Construction Engineering,Tianjin University300072);Fault tree analysis of ventilating system in tunnel construction[J];Industrial Safety and Dust Control;2002-06
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 SHI Xiu-zhi,ZHOU Jian(School of Resources and Safety Engineering,Central South University,Changsha 410083,P.R.China);Application of Uncertainty Average Clustering Measurement Model to Classification of Tunnel Surrounding Rock[J];Journal of Civil,Architectural & Environmental Engineering;2009-02
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 ;Disaster Reduction and Risk Management[J];Science & Technology Review;1993-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved