GU Lei-yu~(1,2) HUANG Hong-wei~1 HU Qun-fang~1 (1.Tongji University,Shanghai 200092,China; 2.The Third Engineering Institute of General Staff,Luoyang 471023,China);Risk Assessment on One Sub-sea Tunnel in Its Operational Period[J];Chinese Journal of Underground Space and Engineering;2007-S1 |
2 |
WANG Yan~1 HUANG Hong-wei~1 LI Shu-cai~2 (1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092 China; 2.Geotechnical & Structural Engineering Research Center,Shandong University,Jinan 250012 China);Risk Identification and Handling during Construction of Subsea Tunnel[J];Chinese Journal of Underground Space and Engineering;2007-S1 |
3 |
WANG Yan,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);A Risk-Based Life Cycle Design Approach for Tunnel Structure[J];Chinese Journal of Underground Space and Engineering;2009-01 |
4 |
ZHOU Jian-kun1,LI Gang2(1.China Academy of Railway Science,Beijing 100081,P.R.China;2.Department of Geotechnical Engineering,College of Civil Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Analysis of Rock Fall on Freeway[J];Chinese Journal of Underground Space and Engineering;2009-02 |
5 |
HOU Yanjuan,ZHANG Dingli,LI Pengfei(Tunnel and Underground Engineering Research Center of Education Ministry,Beijing Jiaotong University,Beijing 100044,China);Analysis and Control Measures of Safety Accidents in Beijing Subway Construction[J];Journal of Beijing Jiaotong University;2009-03 |
6 |
ZHANG Yun-fei ZHAO Yun-sheng(Faculty of Engineering,China University of Geosciences Wuhan 430074);Studies on Tunnel Construction Risk Management System[J];Industrial Safety and Environmental Protection;2009-02 |
7 |
SUN Wei-feng,CHEN Li-wen,LIU Guang-ping,LI Su-hong(School of Management,Hebei University of Technology,Tianjin 300130,China);Application Study on Analysis of Underground Work's Construction Risk[J];Journal of Hebei University of Technology;2008-03 |
8 |
HU Min,ZHANG Lian-xiang(Sydney Institute of Language and Commerce,Shanghai University,Shanghai 200072);Research of Case-based Reasoning for Tunnelling Risk Using Rough Set[J];Computer Engineering;2008-23 |
9 |
WU Jiang-bin;Construction safety risk management of the Keyi road station on the Beijing subway ninth line[J];Shanxi Architecture;2009-33 |
10 |
ZHOU Zhi-peng, LI Qi-ming, DENG Xiao-peng, WU Wei-wei1 (School of Civil Engineering, Southeast University, Nanjing 210096, China);Application of near-miss management system in safety management of metro construction[J];Journal of PLA University of Science and Technology(Natural Science Edition);2009-06 |
|