|
1 |
LIU Rui-feng1,ZHANG Qing-he2,3,HU Xiang-dong2,3,TAN Li-hua2,3 (1.Shanghai Pudong Project Development Co.,Ltd.Shanghai 201210.China;Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China);Application of artificial horizontal ground freezing method to recovering collapse tunnel in Shanghai Metro[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2008-03 |
2 |
HUANG Hong-wei , BIAN Yi-hai (Department of Geotechnical Engineering, Tongji University, Shanghai 200092);Risk Management in the Construction of Deep Excavation Engineering[J];;2005-04 |
3 |
ZOU Jin-jie~1,YANG Qi-xin~2(College of Civil Engineering,Southwest Jiaotong University,Chengdu 610031 P.R.China);Discussion about Building and Developing of City Large Scale Subway Station Complex[J];Chinese Journal of Underground Space and Engineering;2005-05 |
4 |
LI Jun-wei,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai,200092 P.R.China);Application of Entropy Measurement in Underground Engineering Risk Assessment[J];Chinese Journal of Underground Space and Engineering;2005-06 |
5 |
CHEN Liang,HUANG Hong-wei,HU Qun-fang(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);A Database for Risk Management in Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2005-06 |
6 |
HUANG Hong-wei(Dept.of Geotechnical Engineering,Tongji University,Shanghai 200092,China);State-of-the-Art of the Research on Risk Management in Construction of Tunnel and Underground Works[J];Chinese Journal of Underground Space and Engineering;2006-01 |
7 |
CHEN Shen-long,CHEN Long-zhu,SONG Chun-yu(1.Institute of Engineering Safety & Disaster Prevention,Shanghai Jiao Tong Uni.,Shanghai 200030,China);Fuzzy Synthetic Evaluation on Risk of Subway Station Construction[J];Chinese Journal of Underground Space and Engineering;2006-01 |
8 |
HUANG Hong-Wei~1,ZENG Ming~2,CHEN Liang~1,HU Qun-fang~1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.General Office of Commanding Post of Shanghai Tunnel & Bridge Construction,Shanghai 200120,China);Risk Management Software (TRM1.0) Based on Risk Database for Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2006-01 |
9 |
CHEN Gui-xiang~1,HUANG Hong-wei~2,YOU Jian-xin~1(1 School of economics and management,Tongji University,Shanghai,200092,China;2 Department of Geotechnical Engineering,Tongji University,Shanghai,200092,China);Study on Life Cycle Risk Management of Metro[J];Chinese Journal of Underground Space and Engineering;2006-01 |
10 |
CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd.,Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);The Practice of Risk Management in Shangzhong Road Tunnel Engineering[J];Chinese Journal of Underground Space and Engineering;2006-01 |
|