Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Chinese Journal of Underground Space and Engineering》 2006-02
Add to Favorite Get Latest Update

Application of Back Analysis to Pre-Loading Method in Deep Slob Foundation

ZHOU Jian~1,ZENG Yuan~1,SU Yan~2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.College of Civil Engineering and Architectures,Fuzhou University,Fuzhou 350002,China)  
This article introduces the construction method with the large area pre-loading in the deep slob harbor,according to the real observation during construction,the parameters of soil which can reflect the condition of foundation are determined.It offers an upgraded proposal and a reasonable arrangement of the project,that is adopting "biot consolidation non-liner finite element method" to back analysis of the geological parameters of the foundation and forecast of the ending settlement of the ground.It offers reasonable data for optimizing construction scheme and arranging the schedule of the project.At last,this informational construction is proved to be available through the real cases in the project.
【CateGory Index】: TU472.33
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved