Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Chinese Journal of Underground Space and Engineering》 2010-03
Add to Favorite Get Latest Update

Research on New Method for Geological Prediction in Tunnel Construction

Ye Ying(Beijing Municipal Engineering Research Institute,Beijing 100037,China)  
This text introduces a new geological prediction system-USP(Underground Seismic Electromagnetic Prediction) for tunnel engineering.It uses seismic wave angle offset technology to process spatial multi-component and multi-wave for geological prediction.By using three-dimensional arrangement in space,256 channels of data collection,through a series of dispose and analysis of three-dimensional data structure,various graphs and images of seismic wave in three-dimensional space have been gained.Finally,it can detect the position and shape of catastrophic geological body to realize judging and prediction of geological condition in tunnel or underground project.This thesis compared many overlapping geological prediction results in Nancun tunnel of No.108 national highway and follows digging inspection to show effectiveness and reliability of USP.
【Fund】: 北京市科技计划课题(Z07090601470701);; 国家863科技计划课题(2007AA11Z132)
【CateGory Index】: U452.11
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 Ye Ying (Beijing Municipal Engineering Research Institute,Beijing 100037,China);Research on Geological Prediction System of Underground Engineering Construction[J];Chinese Journal of Engineering Geophysics;2009-01
2 YE Ying(Beijing Municipal Engineering Research Institute,Beijing 100037,china);Tunnel Synthetical Parameter Method Geological Prediction Technique Research[J];Geology and Exploration;2009-04
3 Wang Mengshu;Hydrologic and Geological Forecast of Tunnel Construction in the Karst District[J];;2004-01
4 He Faliang Li Cangsong (Southwest Research Institute of CREC, Chengdu 610031);The Development of Geological Forecast in Tunnel Construction[J];Modern Tunnelling Technology;2001-03
5 Wang Hongyong (Institute of Tunnel Design of China Railway Engineering, Luoyang 471009);Comprehensive advance geology prediction adopted in Yuanliangshan tunnel[J];Modern Tunnelling Technology;2004-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 YANG Guo-lin,YANG Li-wei(College of Civil Architectural Engineering,Central South University,Changsha 410075,China);Detection Techniques and Methods of Geological Advanced Prediction in Tunnel Construction[J];Chinese Journal of Underground Space and Engineering;2006-04
2 XUE Yi-guo LI Shu-cai ZHANG Qing-song LI Shu-chen LIU Bin (Geotechnical & Structural Engineering Research Center,Shandong University,Jinan 250012,P.R.China);Application of TSP203 Advanced Prediction to Tunnel in Karst Areas[J];Chinese Journal of Underground Space and Engineering;2007-S1
3 XU Zhen-hao1,LI Shu-cai1,ZHANG Qing-song1,LIU Bin1,ZHANG Xiao1,GE Yan-hui1,2(1.Geotechnical and Structural Engineering Research Center of Shandong University,Jinan 250012 P.R.China;2.Department of Civil Engineering,Shandong Jiaotong University,Jinan 250023 P.R.China);Reflection Characteristic of Seismic Wave in TSP Advance Geological Prediction[J];Chinese Journal of Underground Space and Engineering;2008-04
4 JIANG Wen-quan1,LIU Ya-ling1,WANG Lin-ping2(1.Huangqu'nan Highway Co.Ltd,Quzhou 324000,China;2.Traffic Bureau of Longyou County,Quzhou 324000,China);Application of Geological Radar in Advance Geological Forecast in Huangqunan Highway Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-04
5 ZHANG Qing-song,LI Shu-cai,SUN Ke-guo,XU Zhen-hao(The Research Center of Geotechnical & Structural Engineering,Shandong University,Jinan,250061,China);Analysis and Present State of Advanced Geological Forecast Technology of Highway Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-04
6 LIN Chuan-nian1,2,3(1.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,P.R.China;2.Construction Headquarters of West Section of Hu-Rong Expressway,Enshi,Hubei 445000,P.R.China;3.China Railway 12 Bureau Group Co.,Ltd.Taiyuan 030024,P.R.China);Study on Prediction and Treatment Technology of Karst Fissure Water of Qiyue Mountain Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-04
7 LIN Chuan-nian1,2 (1.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,P.R.China;2.Construction Headquarters of West Section of Hu-Rong Expressway,Enshi,Hubei 445000,P.R.China);Research on Application of Comprehensive Advanced Prediction for Karst Tunnels[J];Chinese Journal of Underground Space and Engineering;2008-06
8 LI Xiao-hong~1,WANG Ping~1,LI Cang-song~2 (1.College of Mathematics and Computer Science, Chongqing Normal University, Chongqing 400047; 2.Southwest Institute of China Rail, Chengdu 610031, China );On the Development of Dynamic Designing Geologic Information System Software[J];Journal of Chongqing Teachers College(Natural Science Edition);2004-04
9 YUAN Yi-jun1,2,WU Zi-quan3(1.Key Laboratory of Geo-detection,(China University of Geosciences) Ministry of Education,Beijing 100083,China;2.School of Geophysics and Information Technology,China University of Geosciences,Beijing 100083,China,3.Earthquake Engineering Institute of Shandong Province,Shandong Jinan 250014,China);The data processing method to plotting in the longitudinal direction for three-dimension post-stack seismic data[J];Progress in Geophysics;2008-05
10 ZHOU Chun-hong(Zhejiang Eastern China Construction Engineering Ltd.,Hangzhou 310030,China);THE LEADING PREDICTION TECHNOLOGY OF GEOLOGICAL DISASTERS FOR DEEP-BURIED TUNNELS[J];Journal of Geological Hazards and Environment Preservation;2005-04
China Proceedings of conference Full-text Database 10 Hits
1 Ding Jianfang Liu Wei Yu Weigang Li Cangsong (Southwest Research Institute of China Railway Engineering,Cheng Du,610031);GEOLOGY PREDICITION OF XU JIA LIANG ZI TUNNEL BY HORIZONTAL SOUND PROBING[A];[C];2006
2 Li Cangsong He Faliang (Southwest Research Institute of China Railway Engineering,Cheng Du,610031);GEOLOGY PREDICTION OF WU LONG TUNNEL IN KARST BY HORIZONTAL SOUND PROBING(HSP)[A];[C];2006
3 YU Weigang CHEN Jundong (Southwest Scientific Research Institute of CREC, Chengdu 610031);THE APPLICATION OF A COMPREHENSIVE GEOLOGICAL EXPLORATION FORECASTING TECHNIQUES TO SWAN TUNNEL,WUHAN-GUANGZHOU PASSENGER LINE[A];[C];2008
4 Liang Weimin, Yang Xiaolin, Zhan Jun (Henan University of science and technology, civil engineering department, Jiaozuo, Henan 454000);Numerical Modeling about the Blasting Excavation of the Tunnel in the Karst Horizon[A];[C];2006
5 XUE Yi-guo~1 LI Shu-cai~1 LI Shu-chen~1 ZHANG Qing-song~1 SU Mao-xin~1 ZHONG Shi-hang~1 LI Xiu~2 (1.Geotechnical & Structural Engineering Research Center of Shandong University,Jinan,250012,China;2.Chang'an University,Xi'an,710054,China);Study on prediction methods of water damage in high risk tunnel construction[A];[C];2008
6 Tian Rong;Lead Geological Prediction Methods for Tunnels and Construction Measures under Unhealthy Geological Conditions[A];[C];2007
7 He Faliang Southwest Research Institute of China Railway Engineering,Chengdu,610031;THE INQUIRY OF SEVERAL PROBLEMS IN GEOLOGY PREDICTION DURING CONSTRUCTION OF TUNNELS[A];[C];2004
8 Li Cangsong;He Faliang Southwest Research Institute of China Railway Engineering,Cheng Du,610031;GEOLOGY PREDICTION OF WU LONG TUNNEL IN KARST AREA BY HORIZONTAL SOUND PROBING(HSP)[A];[C];2004
9 DAI Gao-fei;XIA Cai-chu;YAN Cheng Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China The Key Laboratory of the Exploitation of Southwest Resources & the Environmental Hazards Control Engineering,Ministry of Education,Chongqing University,Chongqing 400044,Chian;STUDY ON THE MONITOR MEASURING OF SHALLOW AND LARGE SPAN CITY TUNNEL ENGINEERING[A];[C];2004
10 WANG Shu-gang~1,LI Shu-cai~1,WANG Gang~1,SUN Yuan-yuan~1,WANG Pei-guang~2 (1.School of Civil Engineering,Shandong University,Jinan 250061,China; 2.Road Bridge Construction Group Co Ltd,Jinan 250021,China);Application of Infrared Detection Technique in Super Long Tunnel[A];[C];2007
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WU Men jun et al;Study on Effect of Karst to Surrounding Rock Stability of Highway Tunnel[J];Underground Space;2003-01
2 ;Application of TSP Advance Geologic Prediction in Highway Tunnel[J];Northeastern Highway;2001-02
3 ZHAO Yonggui1,LIU Hao2,SUN Yu2,XIAO Kuanhuai3 (1. Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100029, China; 2. New Aerial Technology Company, Kunming 650217, China; 3. No.1 Prospecting and Designing Institute, the Ministry of Railway, Lanzhou 730000, China);Research progress in tunnel geological prediction[J];Progress In Geophysics;2003-03
4 Zhang Bin (Highway Planning and Design and Survey Institute, Sichuan Province Communications Department, Chengdu 610041) Fu Wenxi Ren Gungming Nie Dexin (Institute of Engineering Geology, Chengdu University of Technology, Chengdu 610059);DISCUSSION ON THE PREDICTION AND CONTROL OF ROCK BURST IN DEEP LYING LONG TUNNEL[J];JOURNAL OF GEOLOGICAL HAZARDS AND ENVIRONMENT PRESERVATION;1999-01
5 Yu Zhongming);THE APPLICATION OF SOUNDING RADAR TO TUNNELING FORECAST[J];GEOLOGY AND PROSPECTING;1999-03
6 Duan Jiasong);COMBINATION OF SHALLOW REFRACTION SEISMIC SURVEY WITH ELECTRICAL SOUNDING METHOD USED FOR WATER RESEARCH IN THE GRANITE-COVERED AREA[J];GEOLOGY AND PROSPECTING;1999-03
7 LI Zhong (Shijiazhuang Railway Institute, Shijiazhuang 050043);THE STUDY ON THE PROBLEM OF TSP-202 SEISMIC PREDICTION SYSTEM IN XINLUONA TUNNEL[J];Geology and Prospecting;2002-01
8 JING Rong-zhong,LIN Jian,XIAO Zhi-qiang (Central South University, Changsha 410083);APPLICATION OF K SECTION METHOD TO KARST EXPLORATION[J];Geology and Prospecting;2002-02
9 LUO Hong-fa( Liaoning Bureau of Nucleus Industry Geology, Shenyang110032);APPLYING OF PASSIVE SOURCE HIGH FREQUENCY ELECTROMAGNETIC METHOD[J];Geology and Prospecting;2002-06
10 HUANG Kan~1,2,Peng Jian-guo~1,DING Guo-hua~2,CHEN Shao-guang~2,GONG Dao-ping~2(1.Colleage of civel Engineering,Central South University,Changsha 410000;2.Hunan Provincial Communications Planning,Survey & Design Institute;ChangSha 410008);APPLICATION OF TSP20 FOR GEOLOGICAL ADVANCED PREDICTION IN XUE FENG SHAN TUNNEL[J];Geology and Prospecting;2006-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved