Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Chinese Journal of Underground Space and Engineering》 2010-04
Add to Favorite Get Latest Update

The Effects of Groundwater on the Raft Foundation of a Project and Its Disaster Mechanism

Yao Aijun,Su Ning,Zhao Qiang,Du Ping (College of Architecture and Civil Engineering,Beijing University of Technology,Beijing 100124,China)  
There are plenty of geotechnical problems caused by groundwater which occurred during underground space excavation;especially due to that groundwater has floating effect on raft foundation of underground building(structure),and such effect will lead to uneven subsidence and cracks.This article focuses on a typical engineering accident in which the raft foundation of a basement had inhomogeneous floating,via using ground penetrating radar,measurement and monitoring means,hydrological geology and engineering geology combining analysis,the effect of groundwater and its disaster formation of building raft foundation has been discussed.The investigation result shows,that the main reason of raft foundation floating is existence of two layers of complicated perched water in the foundation,and there were no effective groundwater control and reasonable construction measures,then,groundwater disaster occurred.The project took measure of precipitation,which gave good effect.
【Fund】: 国家自然科学基金项目(50678003);; 北京市教育委员会科技计划面上项目(KM200910005012)
【CateGory Index】: TU46
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 4 Hits
1 YUAN Zheng-ru(Engineering Institute of Engineering Corps,PLA Univ.of Sci.& Tech.Nanjing 210007,China);Problems in Design of Anti-uplift in Underground Engineering[J];Chinese Journal of Underground Space and Engineering;2007-03
2 Liu Yunfei Zhou Shuling(4th Engineering Design & Research Academy General Staff Beijing 100850);DISCUSSION ON PROBLEMS OF UPLIFT DESIGN AND CONSTRUCTION FOR UNDERGROUND PROJECTS[J];Industrial Construction;2005-S1
3 LI Guang-xin , WU Jian-min (Hydraulic & Electric Eng. Dept., Qinghua Univ., Beijing 100084, China);Some Problems About the Calculation of Uplift Force on Underground Structures[J];Soil Engineering and Foundation;2003-03
4 Zhang Bin~(1,2) Li Guangxin~1 Yang Junfeng~2(1.Department of Hydraulic Engineering,Tsinghua University,Beijing 100084;2.AVIC Institute of Geotechnical Engineering,Beijing 100098 China);The Design and Actualization for the Model Experiment on Underground Water Uplift Action Mechanism[J];Geotechnical Engineering Technique;2006-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 XU Guang-miao (Design and Research Institute of Guangzhou Metro Co.Ltd.,Guangzhou 510010,China);Three-dimensional Finite Element Analysis for the Interaction of Uplift Pile and the Metro Station Structures[J];Chinese Journal of Underground Space and Engineering;2009-03
2 LI Sen1,TANG Meng-xiong2(1.College of Engineering,Sun Yat-sen University,Guangzhou 510275,P.R.China;2.Guangzhou Institute of Building Science,Guangzhou 510440,P.R.China);Contrast Analysis on Prediction Models for Load-displacement Curve of Uplift Pile[J];Chinese Journal of Underground Space and Engineering;2009-04
3 Gao Wensheng (Institute of Foundation Engineering,China Academy of Building Research,Beijing 100013,China);Discussion on the Key Problems about Structure Design and Construction in Urban Underground Space[J];Chinese Journal of Underground Space and Engineering;2010-S1
4 Liu Faqian;Discussion on Anti-floatation Design of Underground Structure[J];Urban Roads Bridges & Flood Control;2010-06
5 ZHANG Li1,YANG Hua2,YU Xing-fu3(1.Zhangjiang Unversity of Technology,Hangzhou 310014;2.Zhejiang Academy of Building Research & Design Co.,Ltd.,Hangzhou 310012;3.Zhejiang Dacheng Construction Group Co.,Ltd.,Hangzhou 310012);INVESTIGATION AND REMEDY ON A BUOYED UNDERGROUND-GARAGE OF RAFT FOUNDATION BASEMENT[J];Geology and Prospecting;2008-04
6 Liu Wenjing Yang Jianzhong Wang Ni Zhang Guohui(Shenzhen Branch of China Academy of Building Research,Shenzhen 518057,China);TEST APPRAISAL AND REINFORCEMENT OF A FLOATED BASEMENT[J];Industrial Construction;2010-06
7 Wang Jiansheng Sun Mingchuan Jia Jinqing et al.;Design and Application on Anti-floating Anchor of Large Substructure[J];Building Structure;2004-09
8 LI Jingpei SUN Wenjie(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);Study on Design of Uplift Piles and Calculation of Float in Underground Structures[J];Structural Engineers;2007-02
9 JIAN Bin,LU Tie-ying,LI Shao-wei,YIN Ke(College of Civil Engineering,Chongqing University,Chongqing 400045,P.R.China);Effect of Underground Water on Safety of Underground Structure[J];Journal of Civil,Architectural & Environmental Engineering;2010-01
10 SONG Jian XING Zhi-bin WANG Wei;Anti-floating design of building and common treatment measures for its accidents[J];Shanxi Architecture;2007-24
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 YUAN Zhen-ru;Anti-floating Design in Underground Engineering[J];Underground Space;2004-01
2 ZENG Guo-ji et al;Analysis on Present Situation of Anti-floating Technology Application[J];Underground Space;2004-01
3 WANG Xian neng YE Rong ZHOU Feng jun (Shenzhen Geotechnical Engineering Co.Ltd., Shenzhen 518026,China);PROPOSALS FOR THE SELECTION OF FAILURE CRITERIA IN SOIL FLOAT-RESISTING ANCHOR ROD TEST[J];Journal of Geological Hazards and Environment Preservation;2001-03
4 Zhao Ruo- hui;Application of Ground Anchors in Floating Resistance of Underground Pond[J];Fujian Construction Science & Technology;2003-03
5 Ying Gaofei(Building Design Institute of Fuzhou Economy & Technology Development District 350001);The Anti-buoyancy Problem of Ground Floor Sees from Some Engineering Accidents[J];Fujian Architecture & Construction;2007-11
6 Yang Ruiqing et al.;Study on the Option of Defence Water Level for Structure Design and Construction of Underground Buildings and Anti-floating Computation[J];Geotichnical Investigation and Surveying;2001-01
7 LIU Xiaole, ZHANG Ya (Zhengzhou Architecture Design Institute, Zhengzhou 450052, China);Application of float resisting anchor in design[J];Henan Science;2003-05
8 HUA Jinyao ZHENG Dingfang;SELECTION PRINCIPLE OF FLOATING RESISTANT MEASURE FOR UNDERSTRUCTURE[J];Architecture Technology;2003-03
9 KUAI Yugen;DESIGN OF RESISTING FLOATATION FOR UNDERGROUND POOL[J];Architecture Technology;2004-02
10 Zhou Zongdao (Shenzhen Peninsula Construction Supervition Co, Ltd Shenzhen, 518052);The Application of anti-floating anchor rod in soil and its analysis[J];Soie Engineering and Foundation;2002-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved