Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Chinese Journal of Underground Space and Engineering》 2011-01
Add to Favorite Get Latest Update

Study on the Comprehensive Physical Exploration for the Tunnel in High-Risk Karst Areas

Wu Ke1,Ma Mingyue2,Li Shucai3(1.Geotechnical and Structural Engineering Research Institute,Shandong University,Jinan 250061,China;2.Shandong University of Science and Technology,Qingdao,Shandong 266510,China)  
During the tunnel construction in high-risk Karst areas,choosing the suitable technology with high activity and money-saving benefits for comprehensive physical exploration was the effective way to expand the applicable range of the technology for comprehensive physical exploration,which had guiding significance to the tunnel construction.According to the construction of Zijingshan tunnel along Daqing-Guangzhou expressway in Hubei province,the in-site study on the comprehensive physical exploration was investigated.Based on the different geologies,the suitable comprehensive physical exploration was used and the unfavorable geological body in tunnel was clearly revealed,the precision of geological survey was improved much and the accident hidden peril was lowered greatly.This can be as the reference to the similar works.
【Fund】: 山东大学自主创新基金自然科学类专项(2010TS080);; 中国博士后科学基金项目(200904501211);; 中国矿业大学深部岩土力学与地下工程国家重点实验室开放基金项目(SKLGDUEK0910);; 河海大学岩土力学与堤坝工程教育部实验室开放基金项目(GH200803)
【CateGory Index】: U452.11
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 ZHAO Yonggui1,LIU Hao2,SUN Yu2,XIAO Kuanhuai3 (1. Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100029, China; 2. New Aerial Technology Company, Kunming 650217, China; 3. No.1 Prospecting and Designing Institute, the Ministry of Railway, Lanzhou 730000, China);Research progress in tunnel geological prediction[J];Progress In Geophysics;2003-03
2 Wang Mengshu;Hydrologic and Geological Forecast of Tunnel Construction in the Karst District[J];;2004-01
3 WANG Hongyong1 , ZHANG Jikui1 , LI Zhihui2(1. The railway tunnel company of China, Luoyang, Henan471009, China;2. Southwest Jiaotong University, Chengdu, Sichuan610031, China);THE THEORY AND CASE ANALYSIS FOR PREDICTION OF WATER-BEARING BODIES IN OVER-LENGTH AND OVER-SIZE TUNNEL USING INFRARED RAY METHOD[J];Computing Techniques for Geophysical and Geochemical Exploration;2003-01
4 LI Shucai1,LI Shuchen1,ZHANG Qingsong1,XUE Yiguo1,DING Wantao1,ZHONG Shihang1,HE Faliang2,LIN Yushan3(1.Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,Shandong 250012,China;2.Southwest Research Institute,China Railway Engineering Group Co.,Ltd.,Chengdu,Sichuan 610031,China;3.Institute of Karst Geology,Chinese Academy of Geological Sciences,Guilin,Guangxi 541004,China);FORECAST OF KARST-FRACTURED GROUNDWATER AND DEFECTIVE GEOLOGICAL CONDITIONS[J];Chinese Journal of Rock Mechanics and Engineering;2007-02
5 LI Shucai1,XUE Yiguo1,ZHANG Qingsong1,LI Shuchen1,LI Liping1,SUN Keguo1,GE Yanhui1,SU Maoxin1,ZHONG Shihang1,LI Xiu2(1.Research Center of Geotechnical and Structural Engineering,Shandong University,Jinan,Shandong 250061,China;2.College of Geology Engineering and Geomatics,Chang'an University,Xi'an,Shaanxi 710054,China);KEY TECHNOLOGY STUDY ON COMPREHENSIVE PREDICTION AND EARLY-WARNING OF GEOLOGICAL HAZARDS DURING TUNNEL CONSTRUCTION IN HIGH-RISK KARST AREAS[J];Chinese Journal of Rock Mechanics and Engineering;2008-07
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 GAO Xin-qiang , WANG Hai-bin , QIU Wen-ge(School of Civil Eng., Southwest Jiaotong University, Chengdu 610031, Sichuan P.R.China);Study on Influencing Factors and Protection Method of Collapse in the Arch of Hydraulic Tunnel[J];;2005-01
2 XUE Yi-guo LI Shu-cai ZHANG Qing-song LI Shu-chen LIU Bin (Geotechnical & Structural Engineering Research Center,Shandong University,Jinan 250012,P.R.China);Application of TSP203 Advanced Prediction to Tunnel in Karst Areas[J];Chinese Journal of Underground Space and Engineering;2007-S1
3 XU Zhen-hao1,LI Shu-cai1,ZHANG Qing-song1,LIU Bin1,ZHANG Xiao1,GE Yan-hui1,2(1.Geotechnical and Structural Engineering Research Center of Shandong University,Jinan 250012 P.R.China;2.Department of Civil Engineering,Shandong Jiaotong University,Jinan 250023 P.R.China);Reflection Characteristic of Seismic Wave in TSP Advance Geological Prediction[J];Chinese Journal of Underground Space and Engineering;2008-04
4 ZHANG Qing-song,LI Shu-cai,SUN Ke-guo,XU Zhen-hao(The Research Center of Geotechnical & Structural Engineering,Shandong University,Jinan,250061,China);Analysis and Present State of Advanced Geological Forecast Technology of Highway Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-04
5 LIN Chuan-nian1,2,3(1.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,P.R.China;2.Construction Headquarters of West Section of Hu-Rong Expressway,Enshi,Hubei 445000,P.R.China;3.China Railway 12 Bureau Group Co.,Ltd.Taiyuan 030024,P.R.China);Study on Prediction and Treatment Technology of Karst Fissure Water of Qiyue Mountain Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-04
6 LIN Chuan-nian1,2 (1.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,P.R.China;2.Construction Headquarters of West Section of Hu-Rong Expressway,Enshi,Hubei 445000,P.R.China);Research on Application of Comprehensive Advanced Prediction for Karst Tunnels[J];Chinese Journal of Underground Space and Engineering;2008-06
7 WANG Peiyue, PEI DianfeiCivil and Environmental Engineering School, University of Science and Technology Beijing, Beijing 100083, ChinaLinglong Gold Mine, Zhaoyuan 265419, China;Research on Ground Penetrating Radar Surveys of Mined-out Area around 255 Roadway in Complex Geological Environment[J];Journal of University of Science and Technology Beijing;2004-06
8 ZHOU Li-ming1,2,LIU Jiang-ping1,LIU Tian-you1,XIAO Guo-qiang2;LI Yun-dong3(1.Institute of Geophysics & Geomatics,China University of Geosciences,Wuhan 430074,China;2.Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources,Yangtze Scientific Research Institute,Wuhan 430010,China;3.Changjiang Institule of Survey,Planning,Design and Research,Wuhan 430010,China);Application of Integrated Geophysical Method of Advanced Detection for Complex Tunnel Geological Defect[J];Journal of Yangtze River Scientific Research Institute;2008-05
9 FU Chen1,FAN Wei2(1,Faculty of Engineering,China university of Geosciences,Wuhan 430074,China;2,Wuhan Low-layer Engineering Technology Ltd.Company,Wuhan 430074,China);Application of GIS in Tunnel Project abroad and its Trend[J];Journal of Changjiang Engineering Vocational College;2006-04
10 ZHAOYong gui (Institute of Geologyand Geophysics ,Chinese Academy of Sciences,Beijing 10 0 0 2 9,China);Research progress in the testing of difficulty questions on engineering geophysics of China[J];Progress In Geophysics;2003-03
China Proceedings of conference Full-text Database 10 Hits
1 LIU Sheng-dong GUO Li-quan (School of Earth and Environment,Anhui University of Science and Technology,Anhui Huainan 232001,China);MSP Technology and the Application of Detecting Small Geologic Structure in Coal mine Laneway[A];[C];2007
2 DENG Hong-liang~1 XIE Xiang-wen~2 GUO Yu-song~2 ZHANG Zhi-qing~1 1.Beijing University of Technology,the Civil Engineering College,Beijing 100022,China; 2.Institute of Geophysical Prospecting,YREC,Zhengzhou 450000,China;The overcast layer explore example analysis of erdos tunnel[A];[C];2007
3 ZHAO Yong-gui(Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100029,China);Analysis and recommendation of tunnel prediction techniques at home and abroad[A];[C];2007
4 RUAN Baiyao~1 QIANG Jianke~(2,3) Shen Ping~3 1 Department of Resources & Environmental Engineering,Guilin University of Technology,Guilin,China 2 Key Laboratory of Geological Engineering Centre of Guangxi Province,Guilin,China 3 School of Info-Physics and Geomatics Engineering,Central South University,Changsha,China;The research on electrode systems of 3D tunnel DC focused method[A];[C];2008
5 LIU Sheng-dong GUO Li-quan (School of Earth and Environment,Anhui University of Science and Technology,Anhui Huainan 232001,China);MSP Technology and the Application of Detecting Small Geologic Structure in Coal mine Laneway[A];[C];2007
6 XUE Yi-guo~1 LI Shu-cai~1 LI Shu-chen~1 ZHANG Qing-song~1 SU Mao-xin~1 ZHONG Shi-hang~1 LI Xiu~2 (1.Geotechnical & Structural Engineering Research Center of Shandong University,Jinan,250012,China;2.Chang'an University,Xi'an,710054,China);Study on prediction methods of water damage in high risk tunnel construction[A];[C];2008
7 Wei Hui;Construction Technology of Lead Heavy Curtain Grouting for Metamorphic Rock Channel Tunnel[A];[C];2007
8 Tian Rong;Lead Geological Prediction Methods for Tunnels and Construction Measures under Unhealthy Geological Conditions[A];[C];2007
9 DENG Hong-liang~1 XIE Xiang-wen~(1,2) GUO Yu-song~(1,2) (1.The Civil Eng.College,Beijing Univ.of Technol.,Beijing 100022,China; 2.Eng.Physics Academe,Yellow River Commissary Design Company,Zhengzhou 450000,China);Detect Technology and Advance Geological Prediction System Research Used in Deeply Buried Tunnel Fault[A];[C];2007
10 WANG Shu-gang~1,LI Shu-cai~1,WANG Gang~1,SUN Yuan-yuan~1,WANG Pei-guang~2 (1.School of Civil Engineering,Shandong University,Jinan 250061,China; 2.Road Bridge Construction Group Co Ltd,Jinan 250021,China);Application of Infrared Detection Technique in Super Long Tunnel[A];[C];2007
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Ya-jun, HUANG Ping, LI Sheng-cai(State Key Laboratory of Explosion Science and Technology, Beijing Institute of Technology, Beijing 100081, China);Statistics of industrial accidents in China during the period from January to February in 2006[J];Journal of Safety and Environment;2006-02
2 WANG Han-peng1,GAO Yan-fa2,LI Shu-cai1(1.Geotechnical and Structure Research Center,Shandong University,Jinan 250061,P.R.China;2.School of Mechanics and Civil Engineering,China University of Mining and Technology(Beijing),Beijing 100083,P.R.China);Uniaxial Experiment Study on Mechanical Properties of Reinforced Broken Rocks Pre-and-post Grouting[J];Chinese Journal of Underground Space and Engineering;2007-01
3 ZHAO Yong gui (Institute of geology and geophysics, Chinese Academy of Sciences, Beijing 100101, China);The Present Situation and Future of Engineering Geophysics in China[J];Progress In Geophysics;2002-02
4 ZHAO Yonggui1,LIU Hao2,SUN Yu2,XIAO Kuanhuai3 (1. Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100029, China; 2. New Aerial Technology Company, Kunming 650217, China; 3. No.1 Prospecting and Designing Institute, the Ministry of Railway, Lanzhou 730000, China);Research progress in tunnel geological prediction[J];Progress In Geophysics;2003-03
5 ZENG ZHAO-HUANG (The First Surveying and Designing Institute of the Ministry of Railways, Lanzhou 730000);PREDICTION AHEAD OF THE TUNNEL FACE BY THE SEISMIC REFLECTION METHODS[J];Chinese Journal of Geophysics;1994-02
6 LI Zhong (Shijiazhuang Railway Institute, Shijiazhuang 050043);THE STUDY ON THE PROBLEM OF TSP-202 SEISMIC PREDICTION SYSTEM IN XINLUONA TUNNEL[J];Geology and Prospecting;2002-01
7 XIAO Shu an, WU Shi lin (Amberg Measuring Technique Ltd., CH 8105 Regensdorf, Switzerland);GEOLOGICAL PREDICTION TECHNIQUE FOR TUNNEL CONSTRUCTION UNDER COMPLEX GEOLOGICAL CONDITIONS[J];Chinese Journal of Engineering Geophysics;2004-02
8 LIU Chuan-xiao(School of Resources and Environment Engineering, Shandong University of Science and Technology, Tai’an 271019, China);Research and application of geological radar to predict key strata and to analyze fault parameters[J];Coal Science and Technology;2005-02
9 ZHANG Ji-xun~1,REN Xu-hua~2,JIANG Hong-dao~1,CHEN Xiang-rong~3,SHU Jia-qing~2(1.College of Civil Engineering,Hohai University,Nanjing 210098,China;2.College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China;3.East China Investigation & Design Institute,Chinese Electric Power Co.,Hangzhou 310014,China);Main geological problems in diversion tunnel construction at Jinping Second Class Waterpower Station[J];Advances in Science and Technology of Water Resources;2006-06
10 LI Cang-song~1,HE Fa-liang~2,DING Jian-fang~2(1. Southwest Jiaotong University, Chengdu610031,China; 2. Southwest China Institue of Railway Science, Chengdu610031, China);Synthesis prediction technology of karst geology in Wulong tunnel[J];Hydrogeology and Engineering Geology;2005-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved