《Chinese Journal of Underground Space and Engineering》 2011-S2
Add to Favorite Get Latest Update

Numerical Analysis of Bolt Pullout Based on Elastic-Perfectly Plastic Model

Xu De,Shao Longtan(Department of Engineering Mechanics,Dalain University of Technology,Dalain Liaoning 116024,China)  
In order to further reveal the working mechanism of full grouting bolt and its influencing factors,the existing researches on the pullout behavior of single anchor are briefly reviewed firstly.This paper presents a numerical model on concrete specimen during anchor uplifting with elastic-perfectly plastic model and Mohr–Coulomb yield criterion using FLAC,acquiring the curve of force vs.displacement.Through parametric studies,the anchor can be designed to achieve a high pullout capacity by increasing the embedment depth,bolt diameter and confining pressure in reasonable range.The model geometry did not affect the ultimate pull force except for computing time and process accuracy.The loading mechanism and failure modes of full grouting bolt are also discussed.
【CateGory Index】: TD353.6
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 SU Xia,*LI Zhong-kui(Department of Hydraulic Engineering,Tsinghua University,Beijing 100084,China);NUMERICAL STUDY OF THE INFLUENCE FACTORS OF ANCHORAGE UNDER TENSION[J];Engineering Mechanics;2006-02
2 You Chun′an (Shandong Mining Institute, Tai′an 271019 China);MECHANICAL ANALYSIS ON WHOLLY GROUTED ANCHOR[J];CHINESE JOURNAL OF ROCK MECHANICS AND ENGINEERING;2000-03
3 Rong Guan,Zhu Huanchun,Zhou Chuangbing (School of Water Resources and Hydropower, Wuhan University, Wuhan 430072 China);TESTING STUDY ON WORKING MECHANISM OF FULLY GROUTED BOLTS OF THREAD STEEL AND SMOOTH STEEL[J];Chinese Journal of Rock Mechanics and Engineering;2004-03
4 Qi Taiyue1,Lu Shiliang2,Gao Bo1 (1 College of Civil Engineering,SWJTU, Chengdou 610031 China) (2 College of Mineral and Energy Resources,CUMT, Xuzhou 221008 China);AMENDED MODEL OF BOLT ELEMENT IN FLAC AND ITS APPLICATION[J];Chinese Journal of Rock Mechanics and Engineering;2004-13
5 QIAN Qihu,RONG Xiaoli (Engineering Institute of Engineering Corps,PLA University of Science and Technology,Nanjing,Jiangsu 210007,China);STATE,ISSUES AND RELEVANT RECOMMENDATIONS FOR SECURITY RISK MANAGEMENT OF CHINA′S UNDERGROUND ENGINEERING[J];Chinese Journal of Rock Mechanics and Engineering;2008-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 FANG Cong-yan(Wuhu Vocational Institute of Technology,Wuhu 241000,China);Analysis of the uplift Mechanism of bolt-grouting body based on finite difference[J];Journal of Anhui University of Technology and Science(Natural Science);2007-03
2 CAO Guojin et al.;Supporting Mechanism and Experimental Analysis for Anchoring Technology[J];Underground Space;2002-01
3 FAN Yu-jie~1,WAN Sheng-wu~2(1.College of Architecture and Civil Engineering,Huazhong University of Science and Technology,Wuhan 430074,P.R..China;2.College of Urban Construction,Wuhan University of Science and Technology,Wuhan 430070,P.R..China);Calculation Method of Effective Length of Bolt Support and Ultimate Pullout Force of Prestressed Cable[J];Chinese Journal of Underground Space and Engineering;2006-04
4 CHEN Guo-zhou,JIA Jin-qing(State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,P.R.China);Nonlinear Analysis of Stress Distribution of Tension Anchor[J];Chinese Journal of Underground Space and Engineering;2008-01
5 WEN Jing-zhou,WANG Cheng,LIU Li-biao(Department of Tunnel and Geotechnical Engineering,Chongqing Jiaotong University,Chongqing 400074,China);Research on Back Calculation of Plastic and Loose Areas by Axial Force of Rock Bolt[J];Chinese Journal of Underground Space and Engineering;2008-06
6 HU Zeng-hui1,2,LI Xiao-zhao1,ZHAO Xiao-bao1,XIAO Lin1,WU Wei1(1.Department of Earth Sciences,Nanjing University,Nanjing 210093,China;2.Ningbo Urban Rail Transit Project Construction Headquarters,Ningbo 315010,China);Analysis and Prediction of the Temperature Distribution Around Tunnels[J];Chinese Journal of Underground Space and Engineering;2009-05
7 Wang Fei1,2,Hu Qunfang3,Huang Hongwei1,2 (1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China;3.Institute of Disaster Prevention & Relief,Shanghai 200092,China);Dynamic Risk Management for Simultaneous Construction of Stations in Rail Transit Systems[J];Chinese Journal of Underground Space and Engineering;2010-05
8 Luo Weihua1,Hu Yifu2,Zhang Aiming3(1.Hunan Expressway Administration Bureau,Changsha,410001,China;2.School of Resources and Safety Engineering, Central South University,Changsha 410083;3.China Engineering Cor.,Beijing,100038,China);Analysis on Anchored Characteristics and Parameters Effect of Interior Anchored Section in Prestressed Anchor[J];Chinese Journal of Underground Space and Engineering;2011-02
9 XU Xi-bin,LIU Tao,CHU Guang-hui (School of River & Ocean Engineering,Chongqing Jiaotong University,Chongqing 400074,China);Analysis on Load Deformation of Anchorage Section Based on Load Transfer Method[J];Journal of Chongqing Jiaotong University(Natural Science);2010-02
10 Liu Tao-tao~1,Zhang Jie~1,LOU Guo-Chang~2(1.Civil Engineering Department,Zhejiang University,Hangzhou 310027,China;2.Academy of Engineering Surveying,Zhejiang Ningbo 315012,China);CRITICAL PILE LENGTH COMPUTATION BASED ON MINDLIN DISPLACMENT SOLUTION[J];Low Temperature Architecture Technology;2005-01
China Proceedings of conference Full-text Database 10 Hits
1 ZHU Xun-guo~(1,2),YANG Qing~(1,2),LUAN Mao-tian~(1,2) (1.Institute of Geotechnical Engineering,School of Civil and Hydraulic Engineering,Dalian University of Technology,Dalian 116024,China; 2.State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,China);Study of reinforcement mechanics for fully grouting rock bolt in tunneling wall rock[A];[C];2007
2 CHEN Guo-zhou,JIA Jin-qing (Structure Engineering Institute of State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,China);Analytical solution for progressive failure of interface between anchor and soil[A];[C];2007
3 ZENO Huaming~1 LI Qi~2 YUE Xianghong~2 (1.Road and Bridge Construction Investment Corporation of Xiamen,Fujian,Xiamen 361009,China;2.Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Hubei,Wtthan 430071,China);ANALYSIS OF MECHANICS BEHAVIOR OF FULLY GROUTED ROCK BOLT UNDER TENSILE LOAD[A];[C];2007
4 He Ruolan, Zhang Ping, Li Ning, Liu Baochen (School of Civil Engineering and Architecture, Central South University, Changsha 410075; School of Bridge and Structure Engineering, Changsha University of Science and Technology, Changsha 410076; College of Civil Engineering, Hunan University, Changsha 410082 China; Institution of Geotechnical Engineering, Xi' an University of Technology, Xi' an 710048);Numerical Analysis for Bolt Pull-out Test[A];[C];2005
5 ZHU Zi-qiang, HE Xian-qi ( Central South University, Changsha Hunan 410083, China);Study on Full-size Grouted Bolt Pullout Test[A];[C];2005
6 LI Sheng-jun.ZHU Fang-qing, YAN Da ( Bureau of Water Resource of Tianjin Municipality ,Tianjin 300074 ,China);Bearing capacity analysis on the reinforcement of pre-stress anchorage cable of banks of Haihe River[A];[C];2005
7 HAN Shang-yu~(1,2) ZHU Lei~(1,2) HONG Bao-ning~(1,2) WEI Hao~(1,2) (1. Key Laboratory for Geomechanics and Embankment Engineering Education Ministry, Hohai University, Nanjing 210098, China; 2. Research Institute of Geotechnical Engineering, Hohai University, Nanjing 21098, China);New anti-pullout test system of bolt-grouting body and its application[A];[C];2008
8 Sun Xueyi;Zhong Ruihui;Liu Xuan;Chen Biao Liuzhou OVM Engineering Company,Guangxi 545005;THE ANALYSIS OF PRESTRESSING ANCHORING CABLE STRUCTURE UNDER LOADING[A];[C];2004
9 ZENG Xian-ming, DUYun-he, FANJun-qi, LIANG Shi-fa, XIAO Ling, LI Shi-min (The 3rd Scientific Research Institute of the Engineering Corps, Headquarters of the General Staff of PLA, Luoyang 471023, China; East China Jiaotong University, Nanchang 330013, China; Engineering Scientific Research and Design Institute of Chengdu Army, Chengdu 650031, China);DISCUSSION ON EVOLUTIONARY LAW,ATTENUATING CHARACTERISTIC AND CALCULATING METHOD FOR THE SHEARING STRESS OF THE SECOND INTERFACE OF ANCHORAGE TYPE STRUCTURES[A];[C];2005
10 Sun Kai Sun Yue ( Hainan Haikai Geotechnical Engineering CO. LTD, 570216; The Third Construction Engineering of Hainan Province, 571100);MECHANICAL ANALYSIS AND ENGINEERING APPLICATION ON PULLING AND COMPRESSING PRESTRESSED ANCHORING CABLE[A];[C];2006
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 HUANG Hong-wei(Dept.of Geotechnical Engineering,Tongji University,Shanghai 200092,China);State-of-the-Art of the Research on Risk Management in Construction of Tunnel and Underground Works[J];Chinese Journal of Underground Space and Engineering;2006-01
2 HUANG Hong-Wei~1,ZENG Ming~2,CHEN Liang~1,HU Qun-fang~1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.General Office of Commanding Post of Shanghai Tunnel & Bridge Construction,Shanghai 200120,China);Risk Management Software (TRM1.0) Based on Risk Database for Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2006-01
3 CHEN Gui-xiang~1,HUANG Hong-wei~2,YOU Jian-xin~1(1 School of economics and management,Tongji University,Shanghai,200092,China;2 Department of Geotechnical Engineering,Tongji University,Shanghai,200092,China);Study on Life Cycle Risk Management of Metro[J];Chinese Journal of Underground Space and Engineering;2006-01
4 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd.,Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);The Practice of Risk Management in Shangzhong Road Tunnel Engineering[J];Chinese Journal of Underground Space and Engineering;2006-01
5 Hao Haijing etc.;Application of pre-stressed long bloting[J];GROUND PRESSURE AND STRATA CONTROL;1999-Z1
6 FAN Yiqun, ZHONG Wanxie, LIU Jianhang  (State Key Laboratory for Structure Analysis of Industrial Equipment, Dalian University of Technology, Dalian 116023, China; The Research Room of Liu Jianhang Academician in ShangHai Tunnel Engnie;Theory of time-space effect and modern design concepts in soft soil pit engineering[J];JOURNAL OF TSINGHUA UNIVERSITY(SCIENCE AND TECHNOLOGY);2000-S1
7 ZhuWancheng, TangChun'an, Yang Tianhong, Liang Zhengzhao (CRISR, Northeastern University, Shenyang 110006 China);CONSTITUTIVE RELATIONSHIP OF MESOSCOPIC ELEMENTS USED IN RFPA~(2D) AND ITS VALIDATIONS[J];Chinese Journal of Rock Mechanics and Engineering;2003-01
8 CHEN Long,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);RISK ANALYSIS OF ROCK TUNNEL ENGINEERING[J];Chinese Journal of Rock Mechanics and Engineering;2005-01
9 Zhu Huanchun (Wuhan University of Hydraulic and Electric Engineering,Wuhan,430072) Wu Haibin (China Three Gorges Project Development Corporating,Yichang,443133) Zhao Haibin (Middle South China Institute of Survey and Design and Research,Changsha,4100;Experimental study on bolting mechanism under cyclic tensile load[J];CHINESE JOUNAL OF GEOTECHNICAL ENGINEERING;1999-06
10 Liu Daan Yang Zhifa (Engineering Geomechanics Lab, Institute of Geology Chinese Academy of Sciences,Beijing,100029) Ke Tianhe Wang Jing (Middle South Hydropower Design & Research Institute,State Power Corporation of China, Changsha,410014) Liu Ying;Synthetic geology information system and its application in the shiplock slope engineering of a hydropower station[J];CHINESE JOUNAL OF GEOTECHNICAL ENGINEERING;2000-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved