Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Beijing Jiaotong University》 2007-04
Add to Favorite Get Latest Update

Application of the First-Order Optimization Method in Adjustment of the Force of Cable

LIN Wen-quan1,ZHU Er-yu2,SUN Ling3 (1.The Fourth Survey and Design Institute of China Railways,Wuhan 430063,China;2.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China;3.Beijing Municipal Engineering Research Institute,Beijing 100037,China)  
It is feasible to construct the long-span-length arch bridge by the cantilever method of field pouring procedure.The arch ring is constructed by hang-basket,and the cables are pulled to control the line shape of the naked arch at the same time.In order to make full use of the cables' mechanical property and save materials,it is necessary to keep the value of cable force unchangeable during each construction stage.However,As the whole structure is hyperstatic, it is very difficult to calculate the results.The first-order optimization method in ANSYS is utilized to calculate the cable force.After a few calculations of iteration,the cable force is equal approximately.
【CateGory Index】: U445.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved