Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Science & Technology of Baotou Steel(Group) Corporation》 2002-02
Add to Favorite Get Latest Update

Setting out measures for high building

WANG Yan-xin, LI Yun-hua, ZHA Hai-jiang (China Secondary Metallurgical Construction Company, Baotou 014010, China)  
The laser plumb instrument is used to set locating point of each story. And the measuring instruments such as J6 transit and steel rule are used in controlling of axial line for each story and some ways for measuring and setting out are put forward.
【CateGory Index】: TU974
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Cha Ning (Xuancheng Surveying Gang, Xuancheng 242000 , China);Practice and Discussion of Settlement Observation of High-Rise Buildings in Medium and Small-Sized City[J];Anhui Architecture;2006-02
2 NING Dian-min (School of Civil and Transportion Engineering,Anshan University of Science and Technology, Anshan 114044,China);Horizontal control network's optimizing and correcting around[J];Journal of Anshan University of Science and Technology;2003-03
3 TIAN Lin-ya,HUA Xi-sheng(College of Civil Engineering,Hohai University,Nanjing 210098,Jiangsu,China);The Foundation and Application of the Check Baseline in a Radar Research Base[J];Acta Armamentarii;2006-06
4 JIANG Chen-guang 1,LU Guo-dong 2,YU Shao-feng 2,SUN Ling-li 4,HUANG Jia-xing 5(1.Laiyang Agricultural College, Shandong 265200, China; 2.Construction Engineering Quality Supervision Office of Laixi City, Shandong 266600, China; 3.Urban Unified Develo;Observation and Initial Analysis for Sunshine Deformation of Towering Reinforced Concrete Structure[J];Beijing Surveying and Mapping;2002-02
5 L■ Zhonggang (Dept. of Geology and Topography Engineering, Changchun Institute of Technology);Building and accuracy analysis of construction plane control network for certain major project[J];Journal of Changchun Institute of Technology;2000-01
6 LU Zhong gang, et al. (Dept. of Land and Resources,Changchun Institute of Technology,Changchun 130021,China);Discussion on several issues of establishing regional construction plane control[J];Journal of Changchun Institute of Technology;2002-02
7 LV Zhong-gang (Dept.of Land Resources,Changchun Institute of Technology,Changchun 130021,China);Study on the measurement of settlement of buildings[J];Journal of Changchun Institute of Technology;2004-01
8 Niu Zhuoli (Xian Investigation Institute of China National Nonferrous Metals Industry, Xian, 710054);The Precision Measured Method for GPS Engineering Control Network[J];Engineering of Surveying and Mapping;1996-04
9 LI Xiu-hai 1 ,SHANG Guo-xue 2 ,DU Guo-ming 3 (1.Dep.of Surveying and Mapping,Heilongjiang Institute of Technology,Harbin150008China;2.Shenyang Corporation of Agricultural Reclamation Construction,Shenyang110041China;3.Anshan Dagushan Iron Mine,Anshan114046China);Choice a system of coordinates of engineering control networks and analyzing the precision of a short distance GPS altitude[J];Engineering of Surveying and Mapping;2003-02
10 FANG Shu-tian(Civil Engineering Department, Heilongjiang Institute of Technology, Harbin 150050, China);A study of subsidence measurement of a newly-built district in Chinese towns[J];Engineering of Surveying and Mapping;2004-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved