Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Beijing Surveying and Mapping》 2005-03
Add to Favorite Get Latest Update

Rationale、 calibration&Testing of ATR

XueYing Zhushun-ping ZhengZhou lnstitute of surveying and Mapping  
The total stations of the Leica TCA series are equipped with ATR(Automatic Target Recognition),the rationale,calibration and testing of which are outlined in this paper.Moreover, some analysis and evaluation for the testing method and result are given.
【CateGory Index】: P204
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 Tian Aijun~1 Yang Songlin~1 Lu Yanhong~2(1.School of Civil &Architecture Engineering,Beijing Jiaotong University2.Number Six Company of Beijing Construction Engineering Group);ATR of Total Station Used in Measurement for Surrounding Rock Convergence[J];Site Investigation Science and Technology;2006-06
2 Peng Jianguo Tian Aijun Zhang Xiqing;Surveying System for Tunnel Enclosing Rock Convergence Based on ATR of Total Station Machine[J];Railway Investigation and Surveying;2007-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 FAN Bai-xing (Information Engineering University,Henan Zhengzhou 450052,China);Processing Survey Data Automatically by Survey Robot[J];Beijing Surveying and Mapping;2003-02
2 Du Zhzxing; Jin Fengxiang; Wang Tongxiao(Shangdong Institute of Mining and Technology, Taian, Shangdong, 271019);The Management System of the Deformation Monitoring of Huge Building[J];ENGINEERING OF SURVEYING AND MAPPING;1998-02
3 LIU Xiao-sheng1, FAN Jun-zhi2on (1.Southern Institute of Metallurgy, Ganzhou 34 2.Tangshan Branch, CCMRI, Tangshan 06301;Effect of the Rising in Temperature in Gyrotheodolite on the Mean Value of Oscillation[J];Engineering of Surveying and Mapping;2001-01
4 BAO Huan;Application of Difference Method in Surveying[J];Bulletin of Surveying and Mapping;2003-05
5 CHEN Bao ping, ZHANG Xue zhuang;A Study of Timing Error of a PDA Applied in an Automatic Gyro-theodolite[J];Bulletin of Surveying and Mapping;2003-07
6 Zhou Jiangwen(Institute of Geodssy and Ceophysics, Chinese Academy of Science);CLASSICAL THEORY OF ERRORS AND ROBUSTESTIMATION[J];Acta Geodaetica Et Cartographic Sinica;1989-02
7 Zhang Haixiang(Jiaozuo Mining Institute)Sang Guangcan(China University of Mining and Technology);RESEARCH ON THE PROBLEM OF THE TORQUE ANDZERO CORRECTION OF HANGING TAPE IN THEORIENTATION OBSERVATION OF GYROTHEODOLITE[J];Acta Geodaetica Et Cartographic Sinica;1990-04
8 Cai Zongren Larng Dexian(Xi'an Research Institute ot Surveynig and Mapping);A RESEARCH ON SYSTEMATIC ERROR OF TAPE TDJ7PRECISE GYROTHEODOLITE[J];Acta Geodaetica Et Cartographic Sinica;1993-04
9 XIAO Genwang 1 GUO Hongxing XU Zhongyang (1 The First Engineering Co. Ltd., China Railway Engineering Group, 93 Nanyang Road, Zhengzhou 450053, China);APPLICATION OF AUTOMATIC TOTAL STATION SYSTEM TO THE ZHAOBAOSHAN BRIDGE DEFORMATION MONITORING[J];Wtusm Bulletin of Science and Technology;2002-04
10 ZHAO Luocheng1 XIONG Ying2 (1 School of Geodesy and Geomatics; 2 School of Remote Sensing and Information Engineering, Wuhan University,129 Luoyu Road,Wuhan 430079,China);APPLICATION OF NEW TECHNIQUES TO SURVEYING ASTRONOMIC AZIMUTH OF POLARIS[J];Wtusm Bulletin of Science and Technology;2003-03
【Secondary References】
Chinese Journal Full-text Database 6 Hits
1 HUANG Mao-hua,XIE Yi-ling (Shang hai Surveying and Mapping Institute, Shanghai, 200063, China);Research on Measurement of Tunnel Convergence[J];Beijing Surveying and Mapping;2009-04
2 LI Ming,WEI Jian-dong(Institute of Surveying and Mapping,Information Engineering University,Zhengzhou,Henan,450052);The Influence Factors and Solution of Gyrotheodolite Constant Stability[J];Hydrographic Surveying and Charting;2008-06
3 KANG Zhi-yuan(Shanxi Geological Engineering Investigation Institute,Taiyuan 030024,China);Application of R-type Total Station in Construction Survey of Taizhongyin Tunnel in Lvliang Mountain[J];Taiyuan Science & Technology;2009-09
4 LUO Jian wei1,CHEN Li wen2,WANG Yao hui3,XIONG Fei3(1.The 3rd Corp.,The 17th Engineering Group of China Railway,Wuhan 430000;2.Hongshan Station for Supervision and Test of Building Engineering,Wuhan 430074;3.Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan 430071,China);Measurement of Tunnel Convergence Monitoring Using Total Station[J];Soil Engineering and Foundation;2009-06
5 GUO Qing-shu,WEI Peng-tao,XIAN Yong (The second artillery engineering college,Xi' an 710025,China);Analysis on orientation errors of photoelectric integral gyrotheodolite used in launching position[J];Journal of Chinese Inertial Technology;2010-03
6 WANG Fei1,2 DENG Xiangrui3 LI Guangyun1 FAN Baixing1 (1 Institute of Surveying and Mapping,Information Engineering University,66 Middle Longhai Road,Zhengzhou 450052,China) (2 Unit 96165,Leping 333300,China) (3 National Institute of Metrology P.R.China,18 East Beisanhuan Road,Beijing 100013,China);Instrument Constant of Gyrotheodite Drifting with Temperature[J];Geomatics and Information Science of Wuhan University;2011-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved