Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Beijing Surveying and Mapping》 2006-03
Add to Favorite Get Latest Update

A Study of Computation Theory of the Axis Azimuth of Shield Machine

BO Zhi-yi1,2, WANG Po3, ZHANG Nan3 (1.School of Resource and Safety Engineering,China University of Mining and Technology, Beijing, 100083, China; 2. Beijing Vocational & Technical Institute of Industry, Beijing 100042, China; 3. Beijing Uni-Construction group Municipal Engineering Co. Ltd TBM Branch,Beijing, 100042, China)  
The paper parses the principle of measuring shield machine azimuth and deduces shield machine attitude parameter formulas based on TMB guidance system SLS-T from VMT Gmbh in Germany. Because core theory of foreign guidance systems is secret, this paper studied production provides theory basics for tunnel engineering technicians understanding laser guidance system theory and developing internal automatic guidance system.
【CateGory Index】: U455.43
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 LI Hua-peng1,2 XI Jian-hui1(1.College of Automation,Shenyang Institute of Aeronautical Engineering,Liaoning Shenyang,110136;2.Northern Heavy Industries Group Co.,Ltd,Liaoning Shenyang 110000);Tunnel boring machine technology and investigation on its engineering problems[J];Journal of Shenyang Institute of Aeronautical Engineering;2010-02
【Citations】
Chinese Journal Full-text Database 5 Hits
1 QIN Chang-li;Main Contents and Methods for Improving Precision of TBM Construction Surveying[J];Beijing Surveying and Mapping;2003-03
2 DONG Wei-dong~1,REN Gan~1,MA Long~2(1.Beijing Urban Construction Exploration & Surveying Institute,Beijing 100101,China;2.Institute of Geographical Science and National Resources,Chinese Academy of Science,Beijing 100101,China);The principle of laser navigation system of the tunnel boring machine[J];Engineering of Surveying and Mapping;2005-04
3 Lü Guo-ling~1,Huang Wei-ran~2,Pang Hong-jun~1(1.Project Management Department of Line 6 of MRT System of China Railway Tunnel Stock Company,Shanghai 200125,China;2.Guangzhou Metro Design & Research Institute,Guangzhou,Guangdong 510010,China);Research on Application of Automatic Guidance System in Shield Tunnelling[J];Tunel Construction;2005-05
4 PAN Ming-hua, ZHU Guo-li(Huazhong University of Science and Technology, Wuhan, Hubei 430074, China);Study of Measure Methods of the Automatic Guiding System of Shield Machine[J];Construction Technology;2005-06
5 Yue Xiuping Zheng Jinmiao(Shanghai No 2 Municipal Construction Co Ltd, Shanghai 200065);Development and Application of Automatic Supervision System of Shielding Postures[J];China Municipal Engineering;2004-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 CHEN Jian feng(4);Comparison of Techniques for Geological Prediction of Tunnels[J];Underground Space;2003-01
2 SONG Ke-zhi~(1,2),WANG Meng-shu~1,SUN Mou~3(1.School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044,China;2.College of JiaoTong and, Yantai Normal University, Yantai 264025,China;3.China Railway Tunnel Group, Xinxiang 453000, China);Reliability Analysis of Ground Settlement with Shield Tunnel Construction Based on Peck Formula[J];Journal of Northern Jiaotong University;2004-04
3 ZHANG Yin-tao,TAO Lian-jin,BIAN Jin (College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100022, China);Analysis of the Numerical Simulation of Ground Movement Induced by Shield Tunneling[J];Journal of Beijing University of Technology;2006-04
4 ZHANG Hou-mei (Guangzhou Municipal DunJian Underground Construction Engineering Co.,Ltd.,Guangzhou 510030,China);Study on Numerical Simulations of Performance of Tunnel Boring Machines(TBM)[J];Tunnel Construction;2006-S2
5 ZHOU Xian-wei,HE Hai-ling(Dept.of Civil Engineering,Heilongjiang Institute of Technology,Harbin 150050,China);Research on ground deformation in shield tunneling based on analytical methods[J];Journal of Heilongjiang Institute of Technology;2007-04
6 Liu Qizhong1 Shi Yiping2 Bai Yingcai2~ 1(School of Electrical Engineering,Shanghai University of Engineering Science,Shanghai 200065)~ 2(Department of Computer,Shanghai Jiaotong University,Shanghai 200030);THE PREDICTION OF SHIELD CONSTRUCTION DEFORMATION BY USING BP NEURAL NETWORK[J];Computer Applications and Software;2005-04
7 LIU Yang DING Xiao-tang SUN Shu-lin;Application of manpower artificial neutral net works to predit the groundsurface deformation[J];Shanxi Architecture;2005-22
8 CUI Guohua et al.;Realization Measurement about the Multi-Field Modeling and Simulation for Tunnel Boring Machine(TBM) Based on the Virtual Prototype[J];Mining & Processing Equipment;2007-05
9 WANG Shi-fei~1,SUN Yong-hao~1,ZHU Yu-feng~2,GAO Guo-yong~3(1.Liaoning Water Conservancy and Civil Engineering Consultant Co.,Ltd.,Shenyang 110003,Liaoning,China;2.Liaoning Runzhong Water Supply Co.,Ltd.,Shengyang 110179,Liaoning,China;3.The 3rd Institute of Surveying and Mapping of Liaoning Province,Shenyang 110034,Liaoning,China);Application of PPS orientating system to tunneling with TBM[J];Water Resources and Hydropower Engineering;2006-03
10 Gong Qiuming, Zhao Jian, Zhang Xihu (Nanyang Technological University, Singapore 639798);PERFORMANCE PREDICTION OF HARD ROCK TBM TUNNELING[J];Chinese Journal of Rock Mechanics and Engineering;2004-S2
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 SONG Tao(Liaoning Shenwo Reservoir Administration,Liaoyang Liaoning 111000,China);TBM Construction Technique on Unfavorable Geological Land[J];Agricultural Science&Technology and Equipment;2010-08
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 HUANG Hongwei[;Development and Prospect of Urban Tunnel and Underground Construction[J];Underground Space;2001-04
2 QIN Chang-li;Main Contents and Methods for Improving Precision of TBM Construction Surveying[J];Beijing Surveying and Mapping;2003-03
3 XU Xi,LIU Qing-yuan,YU Jia-yong;The Calculation Based on Newton Method for Determining the Stakes on the Transition Curve[J];Bulletin of Surveying and Mapping;2004-04
4 Chen Honglin;Access Database Security Setup Based on VB[J];Computer Study;2004-06
5 ;The Method to Use MATLAB in VB Software[J];Computer Development & Applications;2004-05
6 ;Application of Herrenknecht Shield TBM in Nanjing Subway Construction[J];Construction Machinery and Equipment;2003-02
7 Feng Dongjian et al.;On the Orientation Survey of the Shield in Subway Construction[J];Geotechnical Investigation and Surveying;2003-05
8 ZHU Bao-xun~1,JIN Song-he~2,LI Ya-gang~3(1.School of Civil Eng.,Southwest Jiaotong University, Chengdu Sichuan 610031,China;2.Department of Computer Science & Engineering, ZZILI,ZhengZhou Henan 450002,China;3.Pingdingshan University,Pingdingshan Henan 467002,China);The methods of transferring MATLAB from VB and its application in survey data analysis[J];Journal of Pingdingshan Teachers' College;2004-05
9 OU Jin-cheng, LIN De-jie PENG Bei-zhan (Automation Institute, Guangdong University of Technology, Guangdong 510090, China);Calling matlab from VB to realize the union of graphic and interface[J];Computer Engineering and Design;2002-12
10 LI Hui-ping 1,XIA Ming-yao 2 (1.Institute of Urban Construction and Environmental Engineering,University of Shanghai for Science and Technology, Shanghai 200093,China; 2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);Fuzzy Algorithm for Control of Shield Machine[J];Journal of Tongji University;2003-07
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved