Collapse Treatment of Faulted Karst Cave Tunnel

WANG Zheng-zheng;SUN Tie-cheng;ZHANG Sheng-lin;LI Bin;School of Civil Eengineering,Dalian University of Technology;School of Civil Eengineering,Shijiazhuang Tiedao University;Guizhou Bridge Construction Group Co. ,Ltd.;China Railway 13th Bureau Group Co. ,Ltd.;  
To aim at analyzing collapse of a tunnel during construciton in faulted karst cave,unfavorable geological condition,continuous rainstorm and inaccurate geological survey were discussed and according to in-situ survey,the method of advanced pipe with ductile grouting was put up,and applied to collapse treatment.Furthermore,monitoring and measurement of groupting zone was conducted during tunnel construction.The in-situ monitoring data show that the method of advanced pipe with ductile grouting is effective for temporary support requirements in tunnel collapse treatment.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved