Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Beijing Institute of Machinery》 2004-04
Add to Favorite Get Latest Update

Pricing of sending hydroelectricity to grid in China

GU Wei-zhong~1, LIU Lan~2(1.School of Business,Beijing Institute of Machinery,Beijing 100085,China;2.South Bank University,London SE1 4YB,England)  
Electric power industry in China is now performing an innovation of separating the powerplant from grid and bidding for grid. It is a very critical step in the process of market-orientation of electric power industry. But the innovation on price of sending electricity to grid will involve some complicated and difficult problems in the innovation of electricity price.lt will also play an important role in realizing market-orientotion in the electricity power industry. A model to forecast the price of sending hydroelectricity to grid is set up according to the financial condition and binary electricity price in order to provide some helpful ideas for innovation of electricity in China.
【CateGory Index】: F426.61
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 WANG Jian-ping,et al(Dept.of Enterprise Management of Xinhua Water Resources and Hydroelectric Investment Corporation,Beijing 100053,China);Economic comparison among different electrovalence levels of Ningxia Shapotou Water Control Project Co.,Ltd.[J];Journal of Economics of Water Resources;2007-01
2 LIU Qian1,CAI Yi-ming2(1.Investment Institute in School of Business Hohai University,Nianjing 210098,China;2.Jiangxi Vocational and Technical Colleges of Industry and Engineering,Pingxiang 337055,Jiangxi,China);The Repayment Design Based on Maximizing the Interest of the Shareholders[J];Water Conservancy Science and Technology and Economy;2007-10
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Shen Yu⑿ Xia Qing⑿ Jiang Jianjian⑿ Kang Chongqing⒉ Tsinghua University⒙100084⒙ Beijing⒙ China⒕ Xu Hongqiang⑿ Cao Zhidong⑿ Zhang Yuanpeng⒉ Shandong Electric Pow er Group Corp⒙250002⒙ Ji'nan⒙ China⒕;A NOVEL MODEL OF SHORT-TERM TRADE PLANNING IN A DEREGULATED POWER SYSTEM[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-18
2 WANG Zhi yi (Shanxi Electric Power Company,Taiyuan,Shanxi 030001,China);Study of the Price of Electricity Market[J];Shanxi Electric Power;2001-05
3 ;Analysis of Price Theory in Electric Power Market[J];Qinghai Electric Power;2001-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LI Jia-long WANG Bing-yan (Guangdong Electric Power Dispatching Center,Guangzhou Guangdong 510600);Comparison on Pricing Methods for Onto-Grid Electricity Tariff[J];Electric Power Technologic Economics;2006-03
2 Shen Yu. Xia Qing. Kang Chongqing (Tsinghua University, Beijing 100084, China);A NOVEL MODEL FOR RESTRUCTURING OF ELECTRIC POWER INDUSTRY IN CHINA[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-04
3 Huang Rixing,K ang Chongqing,Xia Qing Tsinghua University,Beijing 1 0 0 0 84,China;SYSTEM MARGINAL PRICE FORECASTING IN ELECTRICITY MARKET[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-22
4 Jiang Jianjian,K ang Chongqing,X ia Qing,Shen Yu,Ding Junwei,Zhao Jing Tsinghua University,Beijing10 0 0 84,China;NEW PRINCIPLE FOR DETERMINING SYSTEM MARGINAL PRICE[J];Automation of Electric Power Systems;2001-22
5 Ding Junwei1 ,H u Yang1 ,X ia Qing1 ,K ang Chongqing1 ,Shen Yu1 ,Chen Zhi2 1. Tsinghua U niversity,Beijing 10 0 0 84,China 2 .Fujian Electric Power Co,Fuzhou35 0 0 0 3,China;HYDRO POWER OPTIMIZATION IN COMPETITION WITH THERMAL GENERATION[J];Automation of Electric Power Systems;2002-03
6 Yang Yan1 ,K ang Chongqing1 ,Shen Yu1 ,Ding Junwei1 Zhao Jing1 ,Peng Tao1 ,Xia Qing1 ,H uang Yonghao2 ,Shang Jincheng2 1. Tsinghua U niversity,Beijing 10 0 0 84 ,China;2 . Henan Electric Power Company,Zhengzhou 4 5 0 0 5 2 ,China;ELEMENTARY STUDIESON ANALYSISAND ASSESSMENT OF ELECTRICITY MARKET[J];Automation of Electric Power Systems;2002-09
7 Shen Yu, Xia Qing, Kang Chongqing (Tsinghua University, Beijing 100084, China);GENERATION JOINTLY SHIFT DISTRIBUTION FACTOR (GJSDF) AND FAST SECURITY ANALYSIS ALGORITHM IN ECONOMIC DISPATCH[J];Automation of Electric Power Systems;2003-18
8 Ma Rui L iu Jianhua Mu Daqing ( Department of Electrical Engineering,Changsha Institute of Electric Power,Changsha,41 0 0 77);A NOVEL MODEL OF DOUBL E- OBJECTIVE FUZZY OPTIMIZATION SHORT TERM TRADE PL ANNING FOR ELECTRITY MARKET[J];Proceedings of The Csu-epsa;2003-01
9 ZHANG Yong-jun1,LIAO Min-chuan1,YUAN Wen-gen1,LI Bang-feng2(1.South China University of Technology,Guangzhou 510640,China; 2.Hainan Power Dispatch Centre,Haikou 570203,China);Power Purchase Planning of Power Network Company Considering Energy Saving[J];Proceedings of the Chinese Society of Universities for Electric Power System and its Automation;2008-06
10 HU Yang 1,XIA Qing 1,KANG Chong qing 1, DING Jun wei 1, XU Hong qiang 2,CAO Zhi dong 2, ZHANG Yuan peng 2 (1. Tsinghua University, Beijing 100084, China; 2. ShanDong Electric Power Corporation,Jinan 250001, China);Research on Competition Ability Index System of Generator Unit in Short Term Electricity Trade[J];Electric Power Automation Equipment;2001-03
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 XIE Xian-zheng,MA Zhong,LI Jin-hua(Anhui Research Academy of Environmental Science,Hefei,Anhui,230061;School of Environment and Natural Resources,The People's University of China,Beijing,100872;The School of Life Science,Anhui University,Hefei,Anhui,230031);Consideration on Evaluating the Environmental and Natural Resources with Contingent Valuation Method[J];;2006-05
2 CAI Yan-peng, YANG Zhi-feng, XU Lin-yu(State Key Laboratory of Environmental Simulation and Pollution Control, Institute of Environmental Sciences, Beijing Normal University, Beijing 100875, China);VALUING HEALTH IMPAIRMENT RESULTING FROM AIR POLLUTION IN TIANJIN'S TOWNSHIP-VILLAGE INDUSTRIAL ENTERPRISES[J];Journal of Safety and Environment;2003-01
3 WANG Jian~(1), QI Yuan~(1), CHEN Zheng-hua~(2), MA Ming-guo~(1), LI Jing~(1), HUANG Chun-lin~(1)(1.Cold and Arid Regions Environmental and Engineering Research Institute,Chinese Academy of Scienses,Lanzhou Gansu 730000,China;2.Lanzhou University,Lanzhou Gansu 730000,China);Modeling Dynamic Assessment on Ecosystem Services Based on Remote Sensing Technology ——A Case Study on Gansu Grassland Ecosystem[J];Journal of Glaciology and Geocryology;2006-05
4 DUAN Xiaofeng XU Xuegong(College of Environmental Sciences,Peking University & Laboratory for Earth Surface Processes,Ministry of Education,Beijing,100871);Regional Forest Ecosystem Services Assessment: A Case Study of Shandong Province[J];Acta Scientiarum Naturalium Universitatis Pekinensis;2006-06
5 WU Ling-ling 1 ,LU Jian-jian 1 ,TONG Chun-fu 1 ,LIU Cun-qi 1,2 (1.State Key Lab.of Estuarine and Coastal Research,East China Normal University,Shanghai200062,China;2.College of Life Science,Hebei University,Baoding071002,China);VALUATION OF WETLAND ECOSYSTEM SERVICES IN THE YANGTZE RIVER ESTUARY[J];Resources and Environment in the Yangtze Basin;2003-05
6 HUANG Shi-hua1,WU Gao-lin2,3,CAO Jian-jun2,3,CAO Su-zhen3(1.Institute of Mathematics and Information Engineering,Gansu United University,Lanzhou 730000,China;2.Key Laboratory of Arid and Grassland Ecology at Lanzhou University,Ministry of Education,Lanzhou 730000,China;3.College of Pastoral of Agriculture Science and Technology,Lanzhou University,Lanzhou 730020,China);The application of contingent valuation method(CVM-WTP) to Maqu grassland ecosystem restoration[J];Pratacultural Science;2007-05
7 PENG Hao1,2,LI Zhen-qing1(1.Laboratory of Quantitative Vegetation Ecology,Institute of Botany,the Chinese Academy of Science,Beijing 100093,China;2.Graduate School of Chinese Academy of Sciences,Beijing 100093,China);Evaluation of grassland ecosystem services in Xilin River basin[J];Acta Prataculturae Sinica;2007-04
8 RUAN Da-wei 1,TAN Zhong-fu 2 (1.Xi'an Jiaotong University,Xi'an 710049;2.North China Electric Power University,Baoding 071003);On Theory of Electric Price Design Based Separating Plants from Networks[J];JOURNAL OF NORTHEAST CHINA INSTITUTE OF ELECTRIC POWER ENGINEERING;1999-03
9 WANG Qing-li,WANG Dan,JING Yuan-wei,ZHANG Si-ying(School of Information Science & Engineering,Oortheastern University,Shenyang 110004,China.);Power Pricing Algorithm Based on Incentive Stackelberg Strategy[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2006-01
10 Pei Zheyi,H an Fang National Electric Power Dispatching & Com munication Center,Beijing10 0 0 31,China;HYDROPOWER AND ELECTRICITY MARKET[J];Dam Observation and Geotechnical Tests;2002-01
【Secondary References】
Chinese Journal Full-text Database 3 Hits
1 GONG Yan-ping (Huizhou Power Supply Bureau, Guangdong Power Grid Company, Huizhou 516001, China);An improved method for reactive power pricing[J];Power Demand Side Management;2010-01
2 ;Research Summarization of Reactive Power Pricing Method[J];Sichuan Electric Power Technology;2007-01
3 KOU Wei1 GUO Zhaohui1 ZHANG Jingrui2 (1.Huaneng Langcang River Hydropower Coporation Limited,Kunming 650214,China;2.Institute of Systems Engineering,Huazhong University of Science and Technology,Wuhan 430074,China);Optimal Scheduling for Cascaded Reservoirs with Different Power Pricing Policies[J];Water Resources and Power;2010-07
【Secondary Citations】
Chinese Journal Full-text Database 3 Hits
1 Xie Kai;Yu Erkeng; Han Fang; Cao Fang; Yang Yihan(EPRI,Ministry of Electric Power Beijing,100085 China)(Graduate School of North Institue of Electric Power Beijing,100085 China);POWER SYSTEM DISPATCHING UNDER POWER MARKET[J];POWER SYSTEM TECHNOLOGY;1995-12
2 Yuan Tangci;Li Junqi(Inner Mongolia Electric Power Central Dispatching InstituteHuhhot,010020 China);ON SEVERAL PROBLEMS IN POWER NETWORK DISPATCHOF ELECTRIC POWER MARKET[J];POWER SYSTEM TECHNOLOGY;1996-02
3 CHEN Yi-qiang,YANG Hong-ming (Huazhong Science and Technology University,Wuhan 430074,China);Discussion on the Issues of Peak Valley Price[J];Hubei Electric Power;2002-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved