Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Blasting》 2002-02
Add to Favorite Get Latest Update

Application of Millisecond Compression Blasting in Exeavation of Fault Trough

CAO Mao-xin 1,ZHANG Cheng-liang 2,TANG Hai 2 (1. Dong Meng Company, The second Engineering Burean of Chinese Comminication Ministry,Xi'an 710065,China.2.Wuhan University of Technology,Wuhan 430070, China)  
In the excavation stonework of road foundation of Jia-wang sector(Xuzhou city) in Jing-fu Expressway, a large-area multi-row deephole millisecond compression blasting was applied, and explosive eddectiveness is highly achieved. The program option, parameters, technological measures and analysis of the engineering blasting are introduced.
【CateGory Index】: U416
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 DONG Rui-feng 1,LU Cheng-gui 1,GUO Xiao-ping 2 ( 1.Tianjin Mine Engineering Company, Ji county 301900 ,China; 2.Shanxi Fuping Cement Ltd, Fuping 711711,China);Application of Cutting Compression Blasting and Pre-split Blasting in Excavating the Ditch of Dropping-level[J];Blasting;2005-02
2 Cao Yue1,Zhao Xiang1,Yu Deyun2,Cui Zhengrong1,Zhao Mingsheng1(1.School of Resource and Environment Engineering,Wuhan University of Technology,Wuhan 430070,China;2.Chuzhou Blasting Firm,Chuzhou 239011,China);Practice of Medium and Deep Hole Blasting Excavation in the Slope-cut of Zhengshi expressway[J];Transportation Science & Technology;2007-03
3 LIANG Kai-shui1,ZHAO Xiang1,CAO Yue1,YU De-yun2(1.School of Resources and Environmental Engineering,Wuhan University of Technology, Wuhan 430070,China;2.Chuzhou Blasting Firm,Chuzhou 239011,China);Design and Research of the Grid-type Priming Circuit in a Row(Floor)[J];Journal of Wuhan University of Technology;2007-06
【Citations】
Chinese Journal Full-text Database 4 Hits
1 Hu Qin 1 Chen Baoxin 2 ( 1.Xianyan Mines Construction Company of China Building Meterials and Construction General Co.,Wugon 712200, Shanxi 2.Research Institute of Blasting, Wuhan University of Technology, Wuhan 430070, Hubei );Design and Implementation of Explosive Excavating Foundation Protogeosyncline[J];BLASTING;2000-01
2 ZHAO Geng 1, WU Xin xia 1, ZHANG Zheng yu 1 HE Hua li 2, YUAN Qi xiang 2, JIANG Jin hong 2, LI Tao 2 ( 1.Yangtze River Scientific Acedemy, Wuhan 430010, 2. The First Company of Gezhouba Group, Yichang, Hubei);Controlled Deephole Blasting for Kaizhou Road Trough[J];BLASTING;2000-S1
3 CHEN Xin hong, LUO De pi, WEN Yuan fu (Guizhou Xin Lian Blast Engineering Limited Corp, Guiyang,550025);Blasted Rock Extrusion with Controlled Blasting Technique and Its Application —— Introduction of 27.6 Ten Thousand Cubic Meter Rock Blasting and Excavation in Basement of the People's Square of Guiyang[J];BLASTING;2000-S1
4 CHEN Yan-shan (Hubei Provincial Communication Programming and Design Institute, Wuhan Hubei, 430051,China);Subgrade Stoneworks Blast Design and Implementation in Dawu Southern Section of Jingzhu Expressway[J];Blasting;2001-01
【Co-citations】
Chinese Journal Full-text Database 8 Hits
1 QIU Xian de et al.;Application of Pre-splitting Blasting Technology in the Cutting Slope[J];Underground Space;2003-01
2 DING Bang?qin (Wuhan Safely and Environment Protection Research Institule, Wuhan,430081, China);Design and Implementation of Stone Deep-hole Controlled Blastingunder 500 kV Superhigh Voltage Line[J];Blasting;2002-01
3 XU Shun?xiang (Wuhan University of Science and Technology, Wuhan 430081, China);Controlled Blasting Techniques in Linxiang-Changshang Expressway's Cutting Excavation[J];Blasting;2002-01
4 ZHU Li?chen (The Fourth Division, The Fourteenth Burean of Chinese Bailway Ministry, Linyi 276003, China);Engineering Blasting for Fault Trough in Complicated Envivonment[J];Blasting;2002-01
5 WANG Gong-zhong,WANG Yu-jie,HUANG Ping-lu (Wuhan University of Technology,Wuhan 430070,China);Practice in Medium-deep Hole Blasting[J];Blasting;2005-02
6 DONG Rui-feng 1,LU Cheng-gui 1,GUO Xiao-ping 2 ( 1.Tianjin Mine Engineering Company, Ji county 301900 ,China; 2.Shanxi Fuping Cement Ltd, Fuping 711711,China);Application of Cutting Compression Blasting and Pre-split Blasting in Excavating the Ditch of Dropping-level[J];Blasting;2005-02
7 DU Yun-long(Henan Provincial Water Conservancy the Second Engineering Burean,Xinyang 464000,China);Application of Extra-deephole Controlled Blasting in Cut Excavation for Baoquan Power Station[J];Blasting;2006-03
8 Lin Qiwei The Construction Limit Company of Quanzhou Economic and Technological Development,Quanzhou Fujian,362000;General Technology of Deep-hole Vibration Reduction and Fly-rock Control Blasting and Its Applications[J];Coal Mine Blasting;2009-02
China Proceedings of conference Full-text Database 2 Hits
1 Wang dongguang Liu honggang (Sichuan Chuantou Engineering blasting Co. Ltd Chengdu 610031; China railway construction third group Co. Taiyuan 030031);Application of Delay Ignition Network for Chamber Blasting[A];[C];2001
2 Chen Baoxin,Fang Zefa (Research Institute of Blasting,Wuhan University of Technology,Wuhan 430070 China);SELECTION OF BEDROCK EXPLOSION CUTTING METHODS FOR BUILDING FOUNDATION[A];[C];2000
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 YANG Zhen hong (Institute of Occupational Safety & Health, Xi'an University of Architecture & Technology, Xi'an 710055, China);A STUDY ON THE DEMOLISHING SECURITY BEFORE BLASTING A TALL TOWER SHAPE STRUCTURES[J];Journal of Safety and Environment;2002-02
2 CHEN Yan-shan (Hubei Provincial Communication Programming and Design Institute, Wuhan Hubei, 430051,China);Subgrade Stoneworks Blast Design and Implementation in Dawu Southern Section of Jingzhu Expressway[J];Blasting;2001-01
3 LIU Kai wen,XU Dong ming (Shenzhen Dijian Engineering Company,Shenzhen 518049,China);The Reasonable Choice of Blasting Program in Express Highway Construction Engineering[J];Blasting;2001-03
4 WU Hai-jun , HUANG Feng-lei , LIANG Yun-ming ,YANG Jun (State Key Lab of Prevention and Control of Explosion Disasters, Beijing Institute of Technology ,Beijing 100081 ,China);Controlled Blasting of the Xiaoqinghe Bridge of the Jing-Zhou Road[J];Blasting;2001-04
5 ZHU Wen?hua, CHENG Kang (Wuhan University of Technology, Wuhan 430070, China);Application of Non-electric Millisecond Delay Detonation Circuit in the Engineering Blasting for Starting the Baise Key water Control Project[J];Blasting;2002-01
6 LIANG Kai?shui, WANG Bin,CAO Yue (Wuhan University of Technology, Wuhan 430070,Hubei,China);Demolition Blasting of Wuhan Hotel Buildings[J];Blasting;2002-01
7 CAO Yue 1 ,PANG Duan-gen 2 ,YANG Chang-sen 3 ,YU De-yun 1 (1.Wuhan University of Technology, Wuhan 430070, China; 2. Ji'an Municipal Blasting Engineering Co, Jian 343000, China; 3. Wuhan Municipal People's Air Defense Engineering Co, Wuhan 430071, China);Demolition of a Large Stone Arch Bridge by Collapse Blasting[J];Blasting;2005-02
8 ZHANG Jian-hua,WANG Xing-rong,ZHAO Quan (School of Resource and Environment Engineering,Wuhan University of Technology,Wuhan 430070,China );Analysis and Design of the Reliability of Non-electric Initiating System in Cutting Excavation Blasting of Anhui Highway[J];Blasting;2005-03
9 ZHENG De-ming~1,YU De-yun~(1,2),CAO Yue~2,TAN Hai~2(1.Chuzhou Blasting Co,Chuzhou 239011,China;2.Wuhan University of Techology,Wuhan 430070,China);Demolition of a 17-storeyed Building by In-site Blasting[J];Blasting;2006-01
10 YU De-yun~(1,2),ZHENG De-ming~(1),ZHAO Xiang~2,CAO Xin~2(1.Chuzhou Blasting Firm,Chuzhou 239011,China;2.School of Resource and Environment Engineering,Wuhan University of Technology,Wuhan 430070,China;);Design and Reliability Analysis of Blasting Firing Circuit for a 17-storeyed High Building in Hefei[J];Blasting;2006-01
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 Wu Ying1,Yang Qingyu2,Ke Changyang2(1.Faculty of Engineering,China University of Geosciences,Wuhan,Hubei 430074,China;2.Hubei Jilongshan Gold Ming Industry Co.Ltd,Huangshi,Hubei 435231,China);Research on Controlled Stope Blasting with Medium-long Hole in Jilongshan Gold Mine[J];Mining Research and Development;2010-01
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 Xu Ying Fang Jianghua(Huainan Institute of Mining,Anhui 232001);STUDY ON PROPER BURDENTOSPACING RATIO OF BLASTHOLES FOR SMOOTH BLASTING[J];ENGINEERING BLASTING;1998-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved