Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Blasting》 2007-01
Add to Favorite Get Latest Update

Blasting Demolition of Xiaolongtan Mining Office Transfer Construction of Belt Conveying System

ZHANG Zhi-yu1,MIAO Yan-gang1,WANG Cheng-long2,YANG Qiu-kui1,LUAN Long-fa1,LI Yong-liang2,ZHU Ji-liang2(1.Kunming University of Science and Technology,Kunming 650093,China;2.Yunnan Xiaolongtan Mining Office,Kaiyuan 661601,China)  
The scheme of directional collapse of Xiaolongtan mining office transfer construction of belt conveying system was adopted in this paper.The reasonable blasting height,blasting parameters,and united initiation network of fuse and non-electric were designed in the demolition so as to reach an ideal blasting effect.
【CateGory Index】: TU746.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved