Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Commercial Research》 2003-11
Add to Favorite Get Latest Update

The Risk Decision of Real Estate Inverstment Based on Dynamic-fuzzy-overall Evaluation

DU De-quan, YUAN Zan-liang  
With an increasingly fierce market competition, real estate has become a large-scaled industry. It is very urgent for investors to make risk decisions in real estate in order to avoid investing failure and reduce enterprises' risks. Therefore, the paper introduces some means of investment risk decision such as designing dynanmic-fuzzy-overall evaluation model of risk decision of real estate investment, formulating a scientific evaluation index system, and dyriamic-fuzzy-overall evalution of all kinds of investment risks, etc.
【CateGory Index】: F224.0
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 6 Hits
1 DU Ting-song,JIAN Ji-gui(Institute of Nonlinear and Complex Systems,China Three Gorges University;Yichang 443002,China);The Application of the Comprehensive Decision-making Model of Portfolio Investment Scheme[J];Commercial Research;2008-05
2 ZHONG Shi-lin ZHANG Peng;The index system of oil gas pipe investment risk and fuzzy synthetic evaluation model[J];Shanxi Architecture;2008-36
3 Zhang Jingjing(School of Economics & Management,Changsha University of Science and Technology,Hunan Changsha 410114);Application of Fuzzy Comprehensive Evaluation Method in Risk Assessment for Real Estate Investment[J];Science Mosaic;2011-10
4 LIU Shu-ni,YANG Mao-sheng(School of Management,Xi′an Univ.of Arch.& Tech.,Xi′an 710055,China);Research of real estate investment risk based on the fuzzy comprehensive evaluation[J];Journal of Xi'an Polytechnic University;2009-03
5 YIN Zhong-xiao ①, HAN Yan-feng ②(① School of Management, Xi’an Univ. of Arch. & Tech. , Xi’an 710055, China;② Finance Office, Xi’an Univ. of Arch. & Tech. , Xi’an 710055, China );Risk Index System and Ambiguous Comprehensive Evaluation Mode Research on the Real Estate[J];Journal of Xi'an University of Architecture & Technology;2004-04
6 HE Fang,WANG Xiao-chuan,XIAO Sen-yu,LI Xiao-li(School of Economics and Management,Tongji University,Shanghai 200092,China);Research on Risk Recognition of Real Estate Projects Based on MIV-BP Neural Network Test[J];Operations Research and Management Science;2013-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Lu Jiajun;Mu Daoming;Pan Baozhu Department of Electrical Engineering;APPLICATION OF DOUBLE MODEL FUZZY CONTROLLER AND SIMULATION RESEARCH[J];;1993-01
2 Chen Jun (Huai'an Construction Engineering Consultation Co., Ltd., Huai'an 223002, China);The Application of Risk Management in Deep Foundation Pit Engineering[J];Anhui Architecture;2008-06
3 ZHENG Lei et al (Chongqing Survey Institute,Chongqing 400047);Preliminary Study on Early-warning System of Ecological Security in Water-Level-Fluctuating Zone (WLFZ) of Three Gorges Reservoir[J];Journal of Anhui Agricultural Sciences;2010-23
4 Li Xingjun Patent Office Of Defence,Beijing 100036 Yi JianZheng Cao Yingjun Dept.of engineering of Ammunition,Ordnance Engineering College,Shijiazhuang 050003;METHOD RESEARCH OF FUZZY SAFETY EVALUATION ON VOLATILE MAN-TRAP[J];;2000-03
5 ZHANG Guo_ji(School of Mechanical Engineering,Anshan Institute of I.& S.Technology,Anshan 114002,China);Evaluation of a Examination Question Store System by Using Fuzzy Comprehensive Evaluation Way[J];Journal of Anshan Institute of Iron and Steel Technology;2001-06
6 ZHANG Lian_ge(Dept. of Scientific Research,Anshan Institute of I.& S.Technology,Anshan 114002,China);Fuzzy Integration Judging of University Scientific Research Levels[J];Journal of Anshan Institute of Iron and Steel Technology;2002-02
7 SHAN Xiu-li1,SUN Qiu-bai2 (1.School of Higher Vocational Technology,University of Science and Technology Liaoning,Anshan 114051,China;2.President Office,University of Science and Technology Liaoning,Anshan 114051,China);Risk analysis and evaluation on investment in high-new-tech project[J];Journal of University of Science and Technology Liaoning;2008-05
8 HUANG Hong-wei , BIAN Yi-hai (Department of Geotechnical Engineering, Tongji University, Shanghai 200092);Risk Management in the Construction of Deep Excavation Engineering[J];;2005-04
9 LI Jun-wei,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai,200092 P.R.China);Application of Entropy Measurement in Underground Engineering Risk Assessment[J];Chinese Journal of Underground Space and Engineering;2005-06
10 BAI Yun~1,TANG Jing~2(1.Shanghai Urban Construction Group,Shanghai 200023,P.R.China;2.Department of Underground Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Management for Underground Project in Soft Soils[J];Chinese Journal of Underground Space and Engineering;2006-01
China Proceedings of conference Full-text Database 8 Hits
1 Yang Xinguang Zou Kaiqi Basic Sciences Department,Dalian Maritime University,Dalian,Liaoning,116026;Fuzzy Decision-making Based on Neural Networks[A];[C];1999
2 ;Discussion on the Role of all Parts involved in the Risk Management of Underground Construction[A];[C];2007
3 HUANG Hong-wei , BIAN Yi-hai (Department of Geotechnical Engineering, Tongji University, Shanghai 200092);Risk Management in the Construction of Deep Excavation Engineering[A];[C];2005
4 Zhao Fuzhuang,Wang Yanchang;Risk Analysis and Control Measures of Air Channel Excavation of Subway Station[A];[C];2009
5 Ma Yingxia, Li Xueliang;Fuzzy cluster analysis of comprehensive academic influences for scientific journals[A];[C];2006
6 Liu Bin-yun (College of Architecture and Civil Engineering, Beijing University of Technology,Beijing 100124,China);Discuss on Philosophical Consider of Hydroelectricity Works Construction[A];[C];2010
7 ;Designing and Implementing of Fuzzy Comprehensive Evaluation Exploiting Tool[A];[C];2002
8 CHENG Hua~1,RONG Chuan - xin~2,CAO Guang - yong~3,YAO Zhi - shu~2 (1.School of Resources and Environmental Engineering,Anhui University,Hefei Anhui 230039,China;2.School of Civil Engineering and Architecture,Anhui University of Science and Technology,Huainan Anhui 232001,China;3.The Civil Engineering School of,Anhui University of Architecture,Hefei Anhui 230022,China);The Problem and Think of Key Technology on TBM Construction in Long Distance Mine Inclined Shaft[A];[C];2012
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHU Mingqiang(The Department of Civil Engineering,Wuhan Industrial College,Wuhan 430023,China);The application of BP neutral network in real estate investment risk analysis[J];Sichuan Building Science;2006-06
2 Wei Bing1 , Zhang Chenyu2, Yao yijia2(1. Beijing Technology and Business University, Beijing 100037 ;2. Beijing Institute of Technology, Beijing 100081);The Application of Real Option Method in Risk Investment[J];Journal of Beijing Technology and Business University(Social Science);2007-02
3 ZHANG Li, YANG Chun-peng, YU Ling(School of International Finance, Qingdao University, Qingdao 266071, China);Real Option and Its Application in Venture Capital[J];Commercial Research;2003-03
4 QU Zhen-tao , LIN Ji-shuang , WANG Fu-you (Harbin University of Commerce Heilongjiang Harbin 150076);On the Structure of Economic Quality Target System[J];Commercial Research;2003-16
5 ZHOU Fang~1, ZHENG Li-zhen~2(1.The Center Of Real Estate Research, Zhejiang University, Hangzhou, Zhejiang Province 310027, China; 2.The Water Resources Bureau Of Qingtian County, Qingtian, Zhejiang Province 323900, China);The Sustainable Development Of Chinese Real Estate In Knowledge-based Economy[J];Commercial Research;2004-06
6 YANG Ling (Institute of City, Chongging Academy of Sodai Sdences, Chongqing 400020, China );Research on the Reform and Development of State-owned Real Estate Enterprises in Chongqing[J];Journal of Chongqing University(Social Sciences Edition);2003-05
7 ZHANG Yun (Economic Management College, Southwest Jaotong University, Chengdu, Sichan 610031, China);Study on Risk Evaluation Methods for Risk Investment Project with Gray Theory[J];Journal of Chongqing Institute of Technology Management;2002-04
8 YU YIFAN;The Community Organization Administration and Service in the Transformation Process[J];Journal of Shanghai Polytechnic College of Urban Management;2003-06
9 GAO Fang-min,QIAN Shui-tu,SHENG Jian-ping (Hangzhou Institute of Commerce,Hangzhou 310035,China);Research on the Use of Real Options in Venture Capital Decision[J];Collected Essays on Finance and Economics;2001-01
10 SUN Fengjun (Finance School, Shanghai University of Finance and Economics, Shanghai 200433,China);The Consideration of Our Country's Asset Securitization and the Path Selection[J];The Study of Finance and Economics;2001-09
【Secondary References】
Chinese Journal Full-text Database 9 Hits
1 WANG Ming-he1,LIU Pei-de2,OU Guo-li1(1.School of Economics and Management,Beijing Jiaotong University,Beijing 100044,China;2.School of Information Management,Shandong Economic University,Jinan Shandong 250014,China);A Risk Evaluation Method for Real Estate Investment Based on Uncertain Linguistic Variables[J];Journal of Beijing Jiaotong University(Social Sciences Edition);2011-04
2 SHANG Hao-fa 1, LI Dan 2 ( 1. Shandong Gangtong Engineering Consultant Co., Ltd., Yantai 264000, China; 2. Dalian University of Technology, Dalian 116024, China );Study on Application of Grey System Theory in Risk Evaluation of Real Estate Project[J];Construction Management Modernization;2008-01
3 WANG Zhong-xiu 1,HUANG Li-ying 2,ZOU Hao 3(1.School of Management,Shenyang Jianzhu University,Shenyang 110168,China 2.Department of Policy and Regulations,Liaoning Housing and Urban-Rural Construction,Shenyang 110001,China; 3.Shenyang Government Procurement Center,Shenyang 110003,China);Investment Risk Evaluation for Real Estate Enterprises Based on Improved Fuzzy AHP[J];Journal of Engineering Management;2011-04
4 GUO Qing-jun~1,SAI Yun-xiu~1,TIAN Juan~2(1.Department of Civil Engineering,Xi'an Technological University,Xi'an 710032;2.School of Economic and Management,Xi'an Technological University,Xi'an 710032);Application of Comprehension Fuzzy Evaluation Model in the Real Estate Appraisal[J];Optimization of Capital Construction;2006-05
5 YIN A-Dong,HE Hai-ning;Research on Risk Assessment System of Financing Projects in Real Estate Trust[J];Financial Theory & Practice;2012-04
6 ZHANG Teng 1,2,MA Rong-guo1(1.School of Highway,Chang'an University,Xi'an 710064,Shaanxi,China;2.CCCC Second Highway Engineering Co.,Ltd.,Xi'an 710065,Shaanxi,China);Multi-level fuzzy comprehensive evaluation method of lead performance for high-speed railway[J];Journal of Traffic and Transportation Engineering;2011-02
7 LI Dan , YUAN Yongbo;Study on Risk Evaluation of Engineering Project Based on Grey System Theory[J];Construction Economy;2007-S2
8 LIAN Zhen-xi,CHEN Jian-ming(School of Business,Hohai University,Nanjing 211100,China);Creation and Application of Management Maturity Model for Real Estate Project Based on Multi-level Grey Theory[J];Journal of Engineering Management;2013-02
9 WANG Biying;CHEN Jianguo;;Risk Analysis of Investment Decision-making in Real Estate Based on Stress Test Method[J];Construction Economy;2013-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved