An optimum analysis of the construction process for double-arch tunnels under an unsymmetrical pressures and complex geological conditions

HUANG Run-qiu,XIAO Hua-boNational Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Technology,Chengdu 610059,China  
Different construction processes of a double-arch tunnel under an unsymmetrical pressure have completely different influences on the stress characteristics and stability of lining and rock mass,especially more obvious under poor geological conditions.By referring to the similar project of the Fuxi tunnel and using the software of FLAC3D,the authors simulate the excavating sequence of a double-arch tunnel during its construction under an unsymmetrical pressure and complex geological conditions by the 3-heading excavation method,and research the stress-strain state of lining and rock mass under different excavating sequences of the guide tunnel and main tunnel.A comprehensive analysis shows that a reasonable excavating sequence of a guide tunnel is to excavate the left guide tunnel firstly,and that of a main tunnel is to excavate the right main tunnel firstly.
【Fund】: 国家自然科学基金重点资助项目(50539050)
【CateGory Index】: U455.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Jiang Shuping~1,Liu Yuanxue~(1,2),Zhao Shangyi~2,Nie Chengkai~3,Tie Zhiwu~3,Zhao Husheng~3,Huang Yangshou~3;Finite Element Numerical Simulation of Shallow Buried Biasing Loess Multiple Arch Tunnel Construction Plan[J];Technology of Highway and Transport;2006-01
【Co-references】
Chinese Journal Full-text Database 2 Hits
1 Wang Bing Xie Jinchang (Lanzhou Railway Institute, Langzhou 730030);MODEL TEST AND RELIABILITY ANALYSIS FOR AN UNSYMMETRICALLY LOADED TUNNEL[J];ENGINEERING MECHANICS;1998-01
2 Sun Weiliang(China Railway 14~(th) Bureau Group Co.Ltd.,Jinan 250014,China);Mechanical Behaviour Analysis of Tunneling in Bed-parallel Bias Strata[J];Railway Construction Technology;2008-05
【Secondary Citations】
Chinese Journal Full-text Database 5 Hits
1 LEI Sheng xiang et al.;Numerical Analysis of the Construction Scheme for Large-span Exit Section of the Pengshui Tunnel in Chongqing-Huaihua Railway[J];Underground Space;2002-03
2 ZAN Cheng zhong 1, XIONG Si hua 2, LI Guo li 3 (1 Yunnan Dabao Highway Construction Headquarters,Yunnan Dali 671000, China; 2 Chongqing Yucai Engineering Consultation and Supervision Limited Company, Chongqing Jiaotong University, Chongqin;Discussions on the construction plan of Shuimofang No.2 connected-arch tunnel[J];Journal of Chongqing Jiaotong Institute;2002-04
3 LIU Gui ying 1,WANG Yu xing 2,CHENG Jian ping 1 LI Peng 1,LI Xue dong 1 (1.China University of Geosciences,Wuhan Hubei 430074,China; 2.No.3 Company of No.12 Bureau,Chinese Railway Ministry,Taiyuan Shanxi 030024,China);STRUCTURE ANALYSIS AND WORKING OPTIMIZATION OF THE DOUBLE-ARCH TUNNEL OF THE EXPRESSWAY[J];Geological Science and Technology Information;2003-01
4 ZHAO Yu guang 1 , ZHANG Huan xin 2 , LIN Zhi yuan 2 , LI Xiao hong 1 , YANG Zheng 1 (1 School of Civil Engineering, Southwest Jiaotong University, Chengdu Sichuan 610031,China; 2 Limit Company of Express Highway of Guanghui,Guangzhou Guangdong 510630,China);Numerical Dynamic Simulation of the Construction Mechanics and Comparison and Choice of the Construction Method in the Bi-arch Tunnel of Express Highway[J];Guangxi Communication Science and Technology;2003-04
5 HAO Jingwen (Shanxi Xinyuan Expressway Co.Ltd,Daixian,Shanxi034200,China);The Key Link of Muti-Arch Tunnel Construction at Shallow Depth[J];Shanxi Science & Technology of Communications;2003-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved