Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Standardization for Surveying and Mapping》 2006-02
Add to Favorite Get Latest Update

Optimum Designing a Construction Control Network for Re regulating Reservoirs in an Engineering

XU Jiadong PENG Guanglin  
Construction control network serves for staking out in construction works, and therefore, its precision will have a direct impact on that of staking out. This paper introduces the characteristics and laying out principles of the mentioned network with a specific engineering as an example, and it describes the method of optimum designing the network for a hydro project. It brings forward some items to which we should pay much attention.
【CateGory Index】: TV62
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 CHEN Xiaorong,LEI Jinsong,LU Xuesong,LUO Wenxia(College of Civil Engineering and Architecture,Southwest Univ.of Science and Technology,Mianyang 621010,China);A new method for processing and analysis of the dada in the settlement survey[J];Sichuan Building Science;2009-03
2 Wang Lin(Hefei Institute of Surveying and Mapping,Hefei 230061,China);Approach to Sunshine Analytical Measurement[J];Anhui Architecture;2008-03
3 Zhang Xingde(Chuzhou Urban & Rural Planning and Design Institute,Chuzhou 239000,China);Settlement Observation of High-rise Building and Data Processing[J];Anhui Architecture;2008-05
4 YAN Wei (Land Requisiton Routine Station Qianshan District Anshan City,Anshan 114041,China);Application of polar coordinating method by random setting station in railway curve mould[J];Journal of Anshan University of Science and Technology;2004-06
5 JIN Lixin1,2,WANG Lianjun1,YANG Songlin1(1.School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China;2.The First Survey and Design Institute of China Railways,Xi'an 710043,China);Select and Research of the Coordinates System in Nigeria[J];Journal of Beijing Jiaotong University;2009-01
6 Qin Chang-li, Dong Wei-dong;The Adjustment Principle and Program of the Metro Track Laying Control Points[J];Beijing Surveying and Mapping;2004-03
7 Luo-Deren1, Zou-Zili1,2, Zou-zhengzhou3, Tang-Jianglong2(1.Central South University, changsha, Hunan, 410083; 2.East china institute of technology,Fuzhou,Jiangxi,344000;3.The Fourth Project Corporation of China Four Sea-Route Bureau, Guangzhou, Guangdong, 510290);RTK Application and Obtaining Methods of Engineering Coordinate Transform Parameters in Dredging Work with Real Time Difference GPS[J];Beijing Surveying and Mapping;2005-02
8 zhao baofeng jiao minglian (Environment and surveying college of china mining university xuzhou 221008; Department of spatial information science,Huaihai Institute of Technology Lianyungang 222001);choice of reference frame on cadastration to city of lianyungang[J];Beijing Surveying and Mapping;2005-04
9 DAI Zhong-dong, LIANG Meng-hua (Airforce Engineering & Design Research Institution, Beijing 100068, China);The Application of the AutoCAD VBA in the Airport's Clearance Survey[J];Beijing Surveying and Mapping;2006-02
10 ZHANG Feng-lu (Bejing Institute of Surveying and Mapping,Bejing 100038,China);The Analysis Study of the Coordinate System Convert in Urban Control Network[J];Beijing Surveying and Mapping;2007-01
China Proceedings of conference Full-text Database 6 Hits
1 FU He-Kuan,LIANG Qiang-Sheng,QI Bing,CHENG Sheng-Yi,GUO Chun-Sheng Wipro(Shanghai) Technologies,201203;Transformation Methods of Reference Frame between AutoCAD and MapInfo[A];[C];2007
2 ;激光法盾构自动导向系统测量数学模型分析[A];[C];2005
3 We Yanqiang~(1,2,3)) Jiang Zaisen~(1)) Yang Gnohua~(2)) 1)Institute of Earthquake Prediction,CEA,Beijing 100036,China, 2)First Crustal Monitoring and Application Center,CEA,Tianjin 300180,China 3)Graduate School,CAS,Beijing 100049,China;The Application of Least Square Collocation in Obtaining Information from GPS Time Series[A];[C];2007
4 Yang Wenfu Liu Haiping Yang Shuangan Zhang Yangfang Cui Yuzhu (Shanxi Coal Geological Comprehensive Reconnaissance Surveying Team,Jinzhong,Shanxi 030600);Probe into Surveying Technical Method in Coalfield 3D Seismic Prospecting[A];[C];2005
5 YAN Chun (Mineral Company Shandong Branch of CHALO,Shandong Zibo 255081 );Establishment of Relative Polar Coordinate Method of Lofting Mineral Company Shandong Branch of CHALCO[A];[C];2009
6 Wang Tie Shanghai First Municial Engineering Co.,Ltd.,200083,Shanghai,China;Urban Rail Transit Shield Penetrating Construction Technique[A];[C];2010
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved