Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Engineering of Surveying and Mapping》 1996-02
Add to Favorite Get Latest Update

The Application of the GPS Technigue in Setting up the Precise Control Network for Shanghai-Hangzhou Expressway

Shi Yim in (Tongji University, Shanghai, 200092)  
The experiences with disposing GPS network for Shanghai-Hangzhou expressway are presented in this paper. The way of transferring the GPS data from the rectangular 3-dimensional coordinate system to Shanghai coordinate system is put forward.
【CateGory Index】: P228.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 SHI Yimin, LUO Yan ( Dept. of Surveying and Ceo-informatics, Tongji University, Shanghai 200092, China; Key Laboratory of Modern Engineering Surveying, State Bureau of Surveying and Mapping, Shanghai 200092, China);Geodetic Coordinate System Suitable for Shanghai-Hangzhou Magnetic Suspension Project[J];Journal of Southwest Jiaotong University;2007-02
2 Wang Huanliang(College of Architectural Engineering of CSFU,Zhuzhou, 412006);Determination of Datum Surface of Horizontal Control Net and Analysis of Length Projection Deformation for High-grade Highway Surveying[J];JOURNAL OF CENTRAL SOUTH FORESTRY UNIVERSITH;1998-02
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Li Weicheng; Li Li; Xu Weidong (Benxi College of Metallurgy and Profession Benxi Liaoning 117022);The Quality Control Methods for GPS RTK Measurement[J];JOURNAL OF BENXI COLLEGE OF METALLURGY;1999-01
2 Bao Jiankuan(Harbin Institute of Engineering, Harbin, 150001);Method of Converting Gauss Plane Coordinate into Mean Elevation Plane in Survey Area[J];Engineering of Surveying and Mapping;1997-03
3 WU Xue-xiang;A Study on the Application of Real-time GPSSurveying to Highway Location[J];BULLETIN OF SURVEYING AND MAPPING;1999-12
4 ZHANG Yu dong,LI Xue fang;Application of GPS RTK in Highway Surveying[J];Bulletin of Surveying and Mapping;2002-12
5 LI Xiao huan;Optimal Selection of Fitting Model for GPS Leveling[J];Bulletin of Surveying and Mapping;2003-07
6 OUYANG Ping, ZHANG Yu;The Application Study of Curve Fitting Elevation in the Highway Survey[J];Bulletin of Surveying and Mapping;2004-08
7 YANG Yuan-xi;Main Progress of Geodetic Coordinate System in China[J];Bulletin of Surveying and Mapping;2005-01
8 XIA Dong-jun 1 ,JI Yu-hua 1 ,CAI Feng 2 (1.Haerbin University of Technology,Harbin150090,China;2.Dalian Economic and Technological Development Area,Dalian116600,China);The Use of GPS-RTK Technology in the Highway Construction[J];Northeast Surveying and Mapping;2003-01
9 PAN Baoyu, ZHANG Xien, LI Hongwei(Shandong Institute of Surveying and Mapping of Geology, Jinan Shandong 250011, China);Technical Key to Heighten RTK Measuring Achievement Precision[J];Surveying and Mapping of Geology and Mineral Resources;2003-03
10 HAO Baocheng (North China Power Engineering(Beijing)Co.,Ltd,Beijing100011,China);The Parameter Research of Localization for RTK[J];Electric Power Survey;2003-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved