Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Engineering of Surveying and Mapping》 2008-03
Add to Favorite Get Latest Update

The fixing construction survey and control technique of glass curtain wall

WANG Wei1,GAO Jun-qiang1,TAO Jian-yue2(1.College of Civil Engineering,Nanjing University of Technology,Nanjing 210009,China;2.Nanjing Metro Headquarters,Nanjing 210007,China)  
This paper introduces the main point of fixing construction survey of the curtain wall,and expounds some key points of techniques,for example,establishing external control network,control point on the wall,and axis control point in the building;building horizontal and vertical collimation line and laying-out of curtain keel at special position.For the present,the conclusion that the axis point must be associated with the control point in higher floor,so that can be convenience to check and adjust.
【CateGory Index】: TU198.2;TU758.7
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved