Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Geomatics》 2012-01
Add to Favorite Get Latest Update

Application of GPS RTK Combined with Robot to High-speed Railway CPⅢ Network Construction

PAN Yuanjin1 HE Meilin1 SUN Changyu1 LUO Manjian2 WEN Hongyan1 (1 Department of Civil Engineering,Guilin University of Technology,12 Jiangan Road,Guilin 541004,China; 2 Guangxi Provincial Bureau of Surveying and Mapping,5 Jianzheng Road,Nanning 530004,China)  
To improve the operation measuring efficiency of the robot for the purpose at night,we put forward a kind of RTK technology based on high iron CPIII nets to harmony in the construction of new technology,the technical combination characteristics of GPS RTK with advantage of TCA2003 measuring robot technology.Through the experiment,and to meet the accuracy of measurement premise,we analyze the technical superiority and maneuverability,and improve the measurement robot the working efficiency of the measurement effectively at night.
【Fund】: 国家自然科学基金资助项目(41071294);; 广西科学基金资助项目(0991023)
【CateGory Index】: P228.4;U212.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 SUN Jing-ling1,HUANG Teng2,DENG Biao2(1.School of Remote Sensing,Nanjing University of Information Science & Technology,Nanjing 210044,China;2.College of Civil Engineering,Hehai University,Nanjing 210098,China);A study of the precision of TCA2003 total station automatic target recognition system in actual three-dimensional survey[J];Engineering of Surveying and Mapping;2007-03
2 WANG Jiexian,GAO Xiaobing,HOU Dongya,XU Wanpeng;Overall Rigorous Three-dimentional Adjustment of High-speed Railway CPⅢ Point[J];Bulletin of Surveying and Mapping;2011-01
3 MEI Wensheng1 ZHENG Yongbo1,2 ZHOU Mingduan1(1 School of Geodesy and Geomatics,Wuhan University,129 Luoyu Road,Wuhan 430079,China;2 Shanghai Urban Construction Design and Research Institute,3447 Dongfang Road,Shanghai 200125,China);SOFTWARE FOR GEOROBOT NETWORK AUTO-OBSERVATION BASED ON PDA[J];Journal of Geomatics;2008-05
4 HE Ai-kuan(The Third Survey and Design Institute of China Railway,Tianjin 300251,China);Research on the Main Technical Standards of Horizontal Control for Ballastless Track Construction[J];Journal of Railway Engineering Society;2006-09
5 CHENG Ang1,LIU Cheng-long2,XU Xiao-zuo2(1. China Railway Eryuan Engineering Group Co.Ltd,Chengdu, Sichuan 610031, China; 2. Southwest Jiaotong University,Chengdu, Sichuan 610031, China);Research on the Positional Accuracy Required for CPⅢ Network[J];Journal of Railway Engineering Society;2009-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Xia Guangling (Beijing Polytechnic College,Beijing 100042,China);Transition of LGO Coordinate Reference in GPS Data Processing System[J];Journal of Beijing Polytechnic College;2009-01
2 TIAN Lin-ya,HUA Xi-sheng(College of Civil Engineering,Hohai University,Nanjing 210098,Jiangsu,China);The Foundation and Application of the Check Baseline in a Radar Research Base[J];Acta Armamentarii;2006-06
3 HU Te-yu1,Yang Song-lin1,Tian Ai-jun2 1.School of Civil &Architecture Engineering,Beijing Jiao-tong University,Beijing 100044;2.Beijing General Research Institute of Mining &Metallurgy,Beijing 100044;Method of Measuring Angles along the Horizontal Plane as the Vertical Axis Tilt[J];Beijing Surveying and Mapping;2008-02
4 SHAO Guo-fang1,HE Lei2,LI Zhao-yang1 (1 Building in Zhengzhou City Water Survey and Design Institute,Zhengzhou Henan 450006; 2 PLA Information Engineering University of Surveying and Mapping Institute, Zhengzhou Henan 450052);Error Analysis of Total Station in Digital Mapping[J];Beijing Surveying and Mapping;2009-04
5 CHEN Rui(Geological Exploration Center Qinghai Branch of China Building Material Industry,Xining Qinghai 810008,China);Application of GPS-RTK Technology in Geology Surveying Work[J];Beijing Surveying and Mapping;2010-03
6 DENG Rong-rong1 ZHANG Mei-wei1 SONG Xuan-bin1,2(1.Anhui University of Science and Technology,Huainan Anhui 232001,China;2.Huainan JINGYI Surveying and Mapping Services Co.,Ltd,Huainan Anhui 232001,China);Establishment and Accuracy Analusis of GPS Coordinates System Transformation Model[J];Beijing Surveying and Mapping;2011-01
7 JANG Shi-yang(Fuoshan Urban Institute of Plan and Survey,Fuoshan,Guangdong,528000,China);A Optimal Design of the Second Grade Level Net in Fuo shan[J];Journal of Liaoning Institute of Science and Technology;2006-04
8 TAO Yuan-zhou, WANG Feng-yan, PANG He-min, WANG Ming-chang (College of Geo-Exploration Science and Technology, Jilin University, Changchun130026,China);Study on replacing the second, third and fourth order leveling by vertical distance measurement with total station instrument[J];Journal of Jiling University (Earth Science Edition);2004-02
9 JIN Li-hua,JIN Sheng-ye,CHEN Sheng-bo,CUI Teng-feiCollege of GeoExploration Science and Technology,Jilin University,Changchun 130026,China;Characteristics of Lunar Craters on the First Image of Chang'e-1 Satellite[J];Journal of Jilin University(Earth Science Edition);2009-05
10 YANG Li-hua,et al.(Surveying and Mapping Institute ofCity,Changchun 130011,China);Method for determine double-difference correction coefficient C in triangle leveling[J];Journal of Changchun Institute of Technology(Natural Sciences Edition);2009-03
China Proceedings of conference Full-text Database 4 Hits
1 ;Ranging Accuracy Analysis of Three Alidading Prism Models with Surveying Robot[A];[C];2009
2 ;Research of Gyrotheodolite Eccentricity Calibration Technology[A];[C];2009
3 Zhu Hongjun Liu Chengquan (JCHX Mining Construction Group Co.,Ltd);Application of Total Station in Large Transfixion Survey Project[A];[C];2009
4 MENG Linghe,LI Jinfu,WU Peng,SONG Guohui (Bluocean Technology Inspection Co.,Ltd.,Tianjin 300452,China);Method of Calculating Coplanarity of Stilt Plate on FPSO[A];[C];2010
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Xin-zhou1, WU Ji-zhong1, HUA Xiang-hong2, ZOU Jin-gui2 (1. Hazard Monitoring and Prevention Research Center, Wuhan University, Wuhan 430079, China; 2. School of Geodesy and Geomatic, Wuhan University, Wuhan 430079, China);Design and implementation of an aided system for high precision curve laying out supported by PDA[J];Engineering of Surveying and Mapping;2005-03
2 SONG Li-jie,SONG Wei-dong(College of Surveying and Mapping,Liaoning Technical University,Fuxin 123000,China);Using EVC3.0 to realize the operation control of total station by PDA[J];Engineering of Surveying and Mapping;2006-06
3 Zhao Jingzhan (Chengdu Guangda Hydropower Engineering Development Company, Chengdu 610061, China);APPLICATION OF TCA2003 TOTAL STATION TO SURFACE DEFORMATION OBSERVATION FOR ERTAN DAM[J];Dam Observation and Geotechnical Tests;2002-02
4 Huang Teng;Chen Guangbao;Zhang Shufeng Hohai University, Nanjing 210098, China Huang Teng;Chen Guangbao;Zhang Shufeng Hohai University, Nanjing 210098, China;THE PRECISION OF ANGLE MEASUREMENT OF AUTOMATIC TARGET RECOGNITION SYSTEM[J];Dam Observation and Geotechnical Tests;2004-03
5 LIAO Zhong-ping1,SHEN Yun-zhong1,2(1.Department of Surveying and Geo-informatics,Tongji University,Shanghai 200092,China;2.Key Laboratory of Modern Engineering Surveying,State Bureau of Surveying and Mapping,Shanghai 200092,China);Design and realization of wireless communication between measurement robot and Pocket PC[J];Journal of Liaoning Technical University;2007-04
6 WANG Guo-chang1,XU Xiao-zuo2,LIU Cheng-long2(1.Surveying and Mapping Branch,China Railway Eryuan Engineering Group Co.Ltd,Chengdu 610031,China;2.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Research and Application of Closure for High Speed Railway CPⅢ Plane Network[J];Journal of the China Railway Society;2009-05
7 Chen Xinhuan;Precision of Control Survey in High Speed Railway[J];;2004-01
8 Pan Zhengfeng Xu Li Xiao Jinli;Exploration for the Horizontal Control Survey in High Speed Railway[J];;2005-05
9 Li Jin Hang Fen Chen Minyi;Discussion on Survey Technique with Precisely Surveying Approach on High Speed Railway Based on Side-Angle Resection[J];Railway Investigation and Surveying;2009-05
10 LIU Chenglong,YANG Youtao,XU Xiaozuo(School of Civil Eng.,Southwest Jiaotong University,Chengdu 610031,China);Simulated Determination of Accuracy Requirement for Control Points Ⅲ Intersection Networks in High-Speed Railway[J];Journal of Southwest Jiaotong University;2008-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved