Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《The Theory and Practice of Finance and Economics》 2005-03
Add to Favorite Get Latest Update

Risk Identification and Decision-making Tools Selection for Small and Medium Enterprises' Investment Projects

WANG Xu-hong (Department of Manegement,Hunan College of Economic and Finance,Changsha,Hunan 410079,China)  
Confronted with the increasingly changeable investment environment,small and m edium enterprises (SMEs) is facing more unstabilities and risks of different types. The knowledge, judgement, evaluation and decision-making of ris ks for investment projects are involved in their own existence and lasting devel opment. For those SMEs, emphasis should be put on the risks management of projec ts, but not the scale of them. Setup of risks management association, applicatio n of new decision-making tools such as SWOT and Bieth's Risk Management Model wi ll be helpful for the risks management and risks control of SMEs.
【Fund】: 湖南省哲学社会科学课题 (0 10 70 40 6)
【CateGory Index】: F224
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Yin Zhijun, Chen Liwen, Wang Shuangzheng, Su Chunsheng (School of Management, Hebei University of Technology, Tianjin 300130,China);Study on The Advance of Project Risk Management in China[J];Optimization of Capital Construction;2002-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WU Jing,JIA Hong-yan (School of Economics and Management,Harbin Engineering University,Harbin 150001,China);The Research on Item Risk of Combined Heat and Power Generation[J];Commercial Research;2009-05
2 DENG Xiu-quan1,ZHANG Di1,CHEN Jun-jie2(1.School of Economics and Management,Beijing University of Aeronautics and Astronautics,Beijing 100191,P.R.China; 2.The Eighteenth Institute of China Academy of Launch Vehicle Technology,Beijing 100076,P.R.China);A Research on the Methodology in Project Risk Management[J];Journal of Guangdong University of Technology(Social Sciences Edition);2012-01
3 ZHANG Xi-rong(Wuhan Univeristy of Science and Technology,Wuhan 430070,China);International Contract Power Construction Project Risk Analysis[J];Electric Power Construction;2009-06
4 XI Yong-qiang,LI Tian-wen,CHENG Chen-jian(Urban and Resource Department,Northwest University,Xi'an 710127,Shannxi);GIS-based Dam Safety Evaluation System Design and Implementation[J];Ground Water;2011-03
5 XU ZhiFen YU ShengWei XU Cheng;Studying of the Whole Process Risk Management Mode of Engineering Project[J];Journal of Industrial Engineering and Engineering Management;2005-S1
6 ;A brief analysis on the application and control of project management in paper enterprises[J];China Pulp & Paper Industry;2012-21
7 ;The research summary of architectural engineering project risk management[J];Popular Science & Technology;2013-10
8 Wang Xiurong1,Zheng Yingshuo21.Zhangjiakou Qiaoxi Housing Administration Bureau;2.Xuanhua Iron and Steel Group Co.,Ltd.;Security Risk Management in the Process of Construction[J];Journal of Hebei Institute of Architecture and Civil Engineering;2009-01
9 JI Liang-xin,QIN Zhi-yu(Rizhao Polytechnic,Rizhao 276826,Shandong,China);Risk Assessment and Case Study of Tourism Exploitation of Nature Reserves[J];Hubei Agricultural Sciences;2009-07
10 YAO Huili,LIAN Chunguang,BAI Jingxian(School of Economics and Management,Jiangsu University of Science and Technology,Zhenjiang Jiangsu 212003,China);Frame Construction of Investment Risk Analysis of Shipbuilding Project Based on Monte Carlo Simulation[J];Journal of Jiangsu University of Science and Technology(Social Science Edition);2010-04
China Proceedings of conference Full-text Database 2 Hits
1 JIANG Bo~1,LIU Chang-bin~2,FENG Yan-ping~1 (1.School of Economics and Management,Beijing Jiaotong University,Beijing:100044 2.School of Economics and Management,Beijing University of Civil Engineering and Architecture,Beijing:100044);The study of the risk management model of construction project[A];[C];2009
2 Liu Ying (Beijing Institute of Aeronautical Materials of Aviation Industry Corporation);Research on Quality Risks Identification &Management of New Product Development Project[A];CHINA ASSOCIATION FOR QUALITY[C];2010
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 SHAN Xiu-li1,SUN Qiu-bai2 (1.School of Higher Vocational Technology,University of Science and Technology Liaoning,Anshan 114051,China;2.President Office,University of Science and Technology Liaoning,Anshan 114051,China);Risk analysis and evaluation on investment in high-new-tech project[J];Journal of University of Science and Technology Liaoning;2008-05
2 WANG Yu-ling,XIA Guo-ping (School of Economics and Management, Beijing University of Aeronautics and Astronautics,Beijing 100083,China);Analysis of the Mechanism of Technological Selection in Industrial Structure Readjustment[J];Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition);2005-01
3 CUI Wei(Jinan Social Academy of Science,Jinan 250012,China);Sublate of System Economy School,Theory Reforge and System Building[J];Journal of Beihua University(Social Sciences);2006-04
4 JI Jun-cai(College of Humanities and Social Science,Nanjing Forestry University,210037,P.R.China);The Basic Approaches to Realize Harmony between Human and Nature[J];Journal of Beijing Forestry University(Social Sciences);2006-03
5 HAN Bo-tang,WANG Ying(School of Economics and Management,Beijing Institute of Technology,Beijing 100081);A Research on Designing an Evaluation Index System for Chinese Technology Human Resource[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2006-06
6 PAN Shu-qing(Depantment of Industrial Economics,Economics School ofShanghai University of Finance & Economics,Shanghai 200083,China);A Game Analysis on Oligopoly Corporations Cooperative Innovation Efficiency[J];Commercial Research;2005-09
7 MA Lin(Business School,Ningbo University,Ningbo 315211,China);A Study of Supply Chain Integration Risk Management Based on SCOR Model[J];Commercial Research;2008-06
8 Ouyang Shu (Chengdu Electronic & Mechanical College,Chengdu,China);Implement the Scientific Outlook on Development of Economic Growth Modes[J];Journal of Chengdu University(Social Sciences);2008-01
9 LIN Yi-fu,DONG Xian-an,YIN Wei (China Center for Economic Research,Peking University,Beijing 100000,China);Technique Choice,Technological Diffusion and Economic Convergence[J];Research On Financial and Economic Issues;2004-06
10 LIU Guo-jing~1, ZHANG Lei~2(1.Management School,Xi'an Jiaotong University, Xi'an 710049,China;2.School of Economics and Finance, Xi'an Jiaotong University, Xi'an 710061, China);On the Loaning Program Risk Assessment Methods Based on Risk-matrix[J];The Study of Finance and Economics;2004-02
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 MA Long-hai,DENG Yu-kun,DONG Sheng-liang(China Power Construction Engineering Consulting Corporation,Beijing 100120,China);Research on Current Situation of Biomass Power Plants in China[J];Electric Power Survey & Design;2012-03
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Haichao,Yang Guangxi (The Department of Civil Engineering and Mechanics, Yanshan University, Qinhuangdao 066004). (Bohai Aluminium Industary Ltd., Qinhuangdao 066004).;Applicability - Studies of The Secondary Critical Path Planing in The Construction Optimum Management[J];JOURNAL OF YANSHAN UNIVERSITY;2000-01
2 GAO Jie (Hunan Institute of Engineering,Xiangtan 411101,China);A Method of Drawing an AOA Network Diagram according to the Schedule of Ordinary Successor Activities[J];Systems Engineering;2001-02
3 WU Huan qun,TANG Li,SUN Xiang jun,MO Lian guang (Changsha Communications University,Changsha 410076,China);A Study on Time Optimization of Alternate Construction Network[J];Systems Engineering;2001-04
4 LI Lin,LI Shu cheng,WANG Dao ping (School of Business Management,Hunan University,Changsha 410082,China);Based on Risk-Analysis' Estimating Method of Project's Duration[J];Systems Engineering;2001-05
5 An Zhong Zhu Shuo Li Zhuowei (Tianjin Institute of Technology, Tianjin 300191);Risk Analysis and Management of Engineering Projects[J];CHINA HARBOUR ENGINEERING;1999-01
6 By Hu Jingsong, Da Qingli (Institute of System Engineering, Southeast University, Nanjing 210096), Jin Yi(College of Information, Zhejiang University of Technology, Hangzhou 310032);Critical Path Analysis in Fuzzy Network(50)[J];JOURNAL OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT;1999-01
7 HUANG Dong_mei 1,HA Ming_hu 2,WANG Xi_zhao 2(1.Department of Basic Science, Hebei Agricultural University, Baoding 071001,China;2.Department of Mathematics,Hebei University,Baoding 071002,China);Comparision between Decision Tree and Fuzzy Decision Tree[J];JOURNAL OF HEBEI UNIVERSITY(NATURAL SCIENCE EDITION);2000-03
8 CHEN Li-wen; SUN Jing (School of Management, Hebei University of Technology, Tianjin 300130, China);The Construction and Optimazation of the Project's Investment Risk Return Theory Model Based on x Distrucbution[J];JOURNAL OF HEBEI UNIVERSITY OF TECHNOLOGY;2000-01
9 Yang Hui(School of Management, Shanghai Jiaotong University, Shanghai 200030);Study on decision tree optimization[J];JOURNAL OF UNIVERSITY OF SHANGHAI FOR SCIENCE AND TECHNOLOGY;1999-01
10 CHANG Yun tao , LI Jia (College of Civil Engineering,Hunan Univ,Changsha 410082,China);Duration and CP Analysis of Fuzzy Network[J];JOURNAL OF HUNAN UNIVERSITY(NATURNAL SCIENCE);1999-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved