Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Chongqing Jiaotong University(Natural Science)》 2008-01
Add to Favorite Get Latest Update

Analysis of Cracks in Reinforced Concrete Block of Curved Girders

WU Xuan-tao1,ZHOU Zhi-xiang1,ZENG Fan-jiang2(1.Chongqing Jiaotong University,Chongqing 400074,China; 2.Department of Transportation of Youyang District,Chongqing 409800,China)  
The reasons for the cracks in the reinforced concrete block of curved girders were analyzed,and the formula for calculating the stress of reinforced concrete block under the effect of centrifugal force of cars was provided through the finite element software ANSYS.The measures to avoid the reinforced concrete block from cracking were discussed,which could provide the baseline for the design and construction of the reinforced concrete block.
【CateGory Index】: U445.71
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 Zhao Jun,Xiang Zhongfu,Jiang Yu (School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Internal Force of Double-Column Pier Coping and Prestress Tendon[J];Journal of Chongqing Jiaotong University(Natural Science);2012-01
2 Deng Na1,2,Jiang Changsen3,Jiang Lingqiao4 (1.College of Geophysics,Chengdu University of Technology,Chengdu 610059,Sichuan,China; 2.Electronic Laboratory,Chengdu University of Information Technology,Chengdu 610225,Sichuan,China; 3.Sichuan Hydropower Engineering Investigation Co.,Ltd.,Chengdu 610072,Sichuan,China; 4.Sichuan Highway and Bridge Engineering Co.,Ltd.,Qionglai 611530,Sichuan,China);Deviation Reinforcement Analysis of Curved Steel Box Girder Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2012-04
3 He Xiaoyang,Xiang Yiqiang,Xing Cheng(Department of Civil Engineering,Zhejiang University,Hangzhou 310058,Zhejiang,China);Disease Analysis and Reinforcement of Concrete Bridge Substructure[J];Journal of Chongqing Jiaotong University(Natural Science);2013-S1
【Citations】
Chinese Journal Full-text Database 1 Hits
1 NIE Li-ying~(1,2),FAN Li-chu~2(1.School of Civil Engineering,Hohai University,Nanjing 210098,Jiangsu,China;2.Department of Bridge Engineering,Tongji University,Shanghai 200092,China);Analysis of Crashworthy Measure of Reinforced Concrete Block on Anti-seismin Urban Interchange Bridge Under Earthquake[J];China Journal of Highway and Transport;2006-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Yu-zhi~1,LI Qiao~1,TANG Liang~1,LUO Gang-lin~2(1.School of Civil Engineering,Southwest Jiaotong University ,Chengdu 610031,China;2.Sichuan Province Communication Department Highway Planning,Survey,Design and Research Institute,Chengdu 610041,(China));Study on the shear lag effect of cable-stayed bridge with double cable planes[J];Sichuan Building Science;2006-04
2 CUI Yingbo1,GONG Dehua2,JIA Shan2,ZHAO Renda2,YANG Yongqing2,XIANG Tianyu2(1.Guizhou Highway Development Company,Guiyang 550002,China;2.Department of Bridge Engineering,Southwest Jiaotong University,Chengdu 610031,China);Structural behavior analysis of curved prestressed concrete frame bridge[J];Sichuan Building Science;2007-02
3 GU Song (School of Civil Engineering and Architecture,South West University of Science and Technology,Mianyang 621002,China);Exploration and practice of teching methods on bending failure of RC beam[J];Sichuan Building Science;2008-05
4 ZENG Li 1,LEI Lin 2,ZOU Zhiquan 2 (1.Institute of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China; 2.Chengdu Highway Bridge Management and Operation Company,Chengdu 610031,China);Model experimental study on crack and reinforcement of RC continuous bridge's bracket[J];Sichuan Building Science;2009-06
5 WU Zhenwang,ZHENG Kaifeng,GOU Chao,LIU Peng(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Calculation and study on deck's local stress in orthotropic steel box girder of highway bridge under standard loads at home and abroad[J];Sichuan Building Science;2011-01
6 GUO Yi1,WEN Huabin1,ZHAN Yulin2(1.School of Mechanical Engineering,Sichuan University of Science & Engineering,Zigong 643000,China; 2.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Dynamic characteristics of the high pier-long span continuous rigid-framed bridge with concrete filled steel tube columns[J];Sichuan Building Science;2012-02
7 PENG Yu-ming;On the Calculation of Arch Bridges with Stiff Steel-pipe Concrete Framwork[J];Journal of Anhui Vocational & Technical College;2008-03
8 CAI Shi hong 1,WU Yun chuan 2,FANG Gao ni 2(1.NingBo Yinzhou Institute of Achitectural Design,Ningbo,315040,China;Anhui Institute of Architecture and Industry,Hefei,230022,China);ELEMENT STIFFNESS MATRIX AND NODAL LOAD MATRIX OF CIRCULAR BEAM[J];Journal of Anhui Institute of Architecture;2003-04
9 PENG Zeng-gang(Countryside Highway Administration Bureau of Mingguang,Mingguang 239400,China);Discussing on banish disengage of bridge prefabricate plate[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2006-06
10 ZHANG Yun-tao(1.Civil Engineering School of Anhui Institute of Architecture & Industry,Hefei 230022,China;2.Civil Engineering School of Southeast University,Nanjing 21096,China);The cause and prevention of deformation of prestressed T-shaped beam[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2007-02
China Proceedings of conference Full-text Database 10 Hits
1 Zheng Yu~2,Zhong Yonggang~3 (1.Dept.of Civil Engineering,Dongguan University of Technology,Dongguan 523808,China; 2.Dongguan Transportation Division,Dongguan,Guangdong,523000,China);Investigation of Compressive Membrane Action in the Concrete Bridge Deck Slabs Reinforced with GFRP Bars[A];[C];2011
2 YIE Qian~1,LIU Zhen~2 (1.Bureau of Public Works of Shenzhen Municipality,Shenzhen Guangdong 510275,China; 2.School of Engineering,Sunyat-sen University,Guangzhou Guangdong 510275,China);Numerical simulation on excavation and earth.filling of foundation fundation fundation pitunder complicated engineering geology conditions[A];[C];2007
3 YANG Xiong,ZHAO Wanqiang,CAO Yu,PANG Tao (China Railway Eryuan Engineering Group Co.Ltd, Chengdu 610031, China );Study on The Additional Load of Tunnel of Railway Underpass Airport Runway[A];[C];2009
4 WU Gang (Anhui Communications Consulting & Design Institute,Hefei 230031,Anhui China);Modeling Design of the Monument Shaped Pier[A];[C];2009
5 LiLiangfeng (Fujian Provincial Institute ofArchitectural Science Research 350025 Fuzhou);Strengthening Design and Construction for Reinforced Concrete Rigid Frame Arch Bridge After Earthquakes[A];[C];2009
6 Chen Ce Zhong Jianchi (Jiangsu Province Yangtze Highway Bridge Construction Commanding Department,Jiangsu Nanjing 210004);Study of Hydrodynamic Forces on Open Caisson During Its Construction[A];[C];2009
7 Ji Zenghui (Yangzhou Highway Administration Office,Jiangsu Yangzhou 225002);Primary Investigation on Repair Technology for Damage of Reinforced Concrete Truss Bridge[A];[C];2009
8 Li Xinkui Fan Yun Yang Gang (Highway and Bridge Engineering Graduate School of DaLian Maritime University,Dallan,Liaoning 116026);The Optimization Analysis of Highway Through Steel Truss Bridge Based on ANSYS[A];[C];2007
9 Wang Rongxia~(1,2) Zheng Gang~1 Li Jianjun~3 (1.Tianjin University,Tianjin 300072,China;2.Hebei University of Technology,Tianjin,300132,China;3.Traffic Department of Langfang,Langfang,065000,China);Design and experimental analysis of inverted T-section composite box girder partially pre-stressed with un-bonded tendons[A];[C];2007
10 LU Xin-zheng,ZHANG Yan-sheng,HE Shui-tao,LU Xiao (Department of Civil Engineering,Key Laboratory of Structural Engineering and Vibration of China Education Ministry,Tsinghua University,Beijing,100084);COLLISION BETWEEN OVER-HIGH TRUCKS AND BRIDGE SUPERSTRUCTURES:DAMAGE MECHANISM AND IMPACT LOADS[A];[C];2009
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 HU Dong,HU Mian-yi(Chongqing Jiaotong University,Chongqing 400074,China);A probe into the calculation method on coping's internal force of pillar pier[J];Journal of Chongqing Jiaotong University;2006-03
2 CHEN Jun1,ZHOU Shui-xing2,ZHANG Yu-zhu3(1.Hubei Province Transportation Planning and Design Institute,Hubei Wuhan 430051,China;2.School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China;3.Beijing Zhongtong Highway Bridge Engineering Consult Development Co.Ltd.,Beijing 100040,China);Discussion on Reasonable Structure Pattern of U-shaped Abutment[J];Journal of Chongqing Jiaotong University;2007-01
3 WU Zu-lie1,CHANG Guo-qiang2,ZHOU Bing1(1.Key Laboratory of Bridge-structure Engineering Ministry of Communications,Chongqing Jiaotong University,Chongqing 400074,China;2.School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Rationality of Computing the Twisting Moment of Cap Beams by Traditional Method[J];Journal of Chongqing Jiaotong University(Natural Science);2007-S1
4 XIANG Zhong-fu1,BIAN Ming-zhi1,LIANG Tian-tian1,ZHU Ci-xiang2(1.School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China;2.Wuhan Second Navigational Road & Bridge Special Engineering Co.Ltd,Hubei Wuhan 430071,China);Analysis of Curved Box Girder's Force Condition under Prestressed Radical Force[J];Journal of Chongqing Jiaotong University(Natural Science);2008-06
5 ZHOU Ye-fei1,GONG Jing-min2(1.Shenzhen Traffic Construction Engineering Test & Detection Centre,Shenzhen 518049,Guangdong,China;2.Hunan Communication Polytechnic,Changsha 410004,Hunan,China);Local Force Analysis of Steel-Box Girder Bridge with Incremental Launching Construction by Vertical Curve of Variable Curvature[J];Journal of Chongqing Jiaotong University(Natural Science);2010-03
6 ZHANG Qiu-ling1,HUANG Chao2(1.School of River and Ocean Engineering,Chongqing Jiaotong University,Chongqing 400074,China;2.School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);The Research on the Prestress Effect in the Small Radius Curved Beam[J];Journal of Chongqing Jiaotong University(Natural Science);2010-05
7 He Jian, Zhang Shengli;Relative Influence of Anti-drop-beam Device on Earthquake Isolating Bridge under Action of Earthquake[J];Urban Roads Bridges & Flood Control;2006-05
8 Li Jianmin, Feng Jian, Jin Dayong, Chen Jingang;Elementary Analysis of Typical Destroying Condition and Reason of Bridges in "5.12" Wenchuan Earthquake Area[J];Urban Roads Bridges & Flood Control;2008-08
9 LIU Jian-xin,ZHAO Guo-hui,LI Jia-wu(Bridge and Tunnel Key Laboratory of Shanxi Province,Chang'an University,Xi'an 710064,China);Wenchuan Earthquake and changes of the specifications for seismic design of highway bridges in China[J];Journal of Transport Science and Engineering;2009-01
10 ZHAO Li-ming(School of Civil and Architectural Engineering,Central South University,Changsha 410075,China);Analysis of the causes of the lateral movement of bridge abutments on soft clay and measurement[J];Journal of Railway Science and Engineering;2006-04
【Secondary Citations】
Chinese Journal Full-text Database 5 Hits
1 LIU Jian xin,HU Zhao tong,LI Zi qing (College of Highway Engineering,Xi'an Highway University,Xi'an 710064, China);Design method for seismic absorption of bridge structures[J];CHINA JOURNAL OF HIGHWAY AND TRANSPORT;2000-02
2 FAN Lichu, NIE Liying, LI Jianzhong(Department of Bridge Engineering, Tongji University, Shanghai 200092, China);Dynamic characteristic analysis of laminated rubber bearing sliding under earthquake[J];China Journal of Highway and Transport;2003-04
3 HUANG Jian-wen, ZHU Xi (School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China);Displacement-based seismic design method for RC continuous girder bridges[J];China Journal of Highway and Transport;2005-02
4 LI Zhong-xian1,HUANG Jian1,DING Yang1,SHI Zhi-li2(1.School of Construction Engineering,Tianjin University,Tianjin 300072,China;2.Tianjin Municipal Engineering Design Institute,Tianjin 300051,China);Seismic responses of long-span cable-stayed bridges under different patterns of earthquake excitations[J];China Journal of Highway and Transport;2005-03
5 WANG Jun-wen~(1,2),LI Jian-zhong~1,FAN Li-chu~1(1.Department of Bridge Engineering,Tongji University,Shanghai 200092,China;2.School of Civil Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China);Parametric study of longitudinal seismic pounding response for continuous girder bridges[J];China Journal of Highway and Transport;2005-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved