Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Chongqing Jiaotong University(Natural Science)》 2010-06
Add to Favorite Get Latest Update

Risk Management and Decision-making of Highway Pavement Construction Based on Utility Theory

WU Yi-fei1,TAN Jian-ming2,HE Shou-kui3,LI Ming2(1.Chongqing Constraction Engineering Group Corporation Ltd.,Chongqing 401147,China; 2.Traffic Engineering Test Center of Chongqing Fengdu County,Chongqing 408200,China; 3.Chongqing Jiaotong University,Chongqing 400074,China)  
In this paper,basic principles of risk management were employed to identify quality,safety,schedule and cost risk of northeast section of Chongqing by pass expressway.Optimal decisions by different decision makers were analyzed through applied risk management utility theory.The study indicated that risk attitude could exert great influence on risk decision.Risk management decision-making incentive and restrictive mechanism were established.
【CateGory Index】: U415.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 GUO Chang you CHEN Jun(TianJin Electric Power Construction co.Tian Jin 300012,China);Study on program management mode based on information framework[J];Journal of Industrial Engineering and Engineering Management;2005-S1
2 JIANG Xuelian1,2,LI Yanbao1 (1.School of Civil Engineering,Tianjin University,Tianjin 300072,China;2.Tianjin Key Laboratory of Soft Soil Characteristics & Engineering Environment,Tianjin Institute of Urban Construction,Tianjin 300384,China);Study on the Decision-making Model for Breakwater Based on the Combination of Utility Theory and Risk Quantification[J];Marine Science Bulletin;2009-01
3 HAN Yu qin (The Capital Construction Department of Fenxi Mining Industry Group Co. Ltd., Jiexiu 032000, China);Quality current situation of our group company construction engineering and treatment measures[J];Shanxi Agchitecture;2002-05
4 LU Ji-en~1,TAN Yu-sheng~1,PENG Bo~1,JI Cun-de~1,HAO Rui-zhen~1,ZHANG Bo~2(1.Maoming College,Maoming,Guangdong 525000,China;2.Maoming Electric Power Company,Maoming,Guangdong 525000,China);Comparison Between Utility Theory and Expected Profit and Loss Theory in the Decision of Project Risk[J];Construction Technology;2006-04
5 Du Bo Sun Liyu (Qingdao contruction group Co. Ltd. );CONTROL AND PREVENTION OF THE QUALITY RISK OF THE PROJECT MANAGEMENT IN THE CORPORATION[J];China Civil Engineering Journal;2003-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 YU Yongqiang(China Railway No.2 Engineering Group Co.Ltd,Chengdu 610032,China);Construction Project Quality Control and Risk Management[J];Journal of Chengdu University(Natural Science Edition);2008-04
2 KONG Ke-ying,MA Li-na(Liaoning Technical University,Huludao Liaoning 125105,China);Selecting the Optimal Risk of Response Based on Analytic Hierarchy Process[J];Science Technology and Industry;2009-05
3 CHEN Zhi-hua~1,YU Hai-feng~2(1.Engineering College of Shanxi University,Taiyuan 030013,China;2.Coastal Real Estate Investment(China) Limited Company,Sengzhen 518033,China);EPC General Contract Project Risk Management Research[J];Journal of Electric Power;2006-04
4 SONG Xiang-dong(NanHua college of Industry and commerce,Guangzhou 510507,China);Research on Human Factor Based on Project Quality Control[J];Construction & Design for Project;2007-12
5 LI Chang-you,FU He-lin,LI Liang,GUO Ming-xiang(School of Civil and Architectural Engineering,Central South University,Changsha 410075,China);Asseeement of collapse disater during tunnel construction in a underground-water tunnel[J];Journal of Railway Science and Engineering;2009-06
6 SHEN Qi-ming1,WAN Xian-jin2 (1.Chongqing Jiaotong University,Chongqing 400074,China;2.City Construction Investment Company of Chongqing,Chongqing 400015,China);Analysis of Expressway Construction Organization with Tunnel Group[J];Journal of Chongqing Jiaotong University(Natural Science);2010-04
7 CHEN Peng~1,WU Yu-hua~1,JIN Yu-cheng~2 (1.School of Management, Tianjin University, Tianjin 300072;2. Department of Education, East China Jiaotong University,Nanchang 330013,China);Application of Game Theory in Quality Management of Engineering Project[J];Journal of East China Jiaotong University;2004-04
8 HUANG Zhi-fang1,2,WEN Guo-hua1,HUANG Yue-sheng1(1.Department of Civil Engineering,Hunan City University,Yiyang,Hunan 413000,China;2.Road Engineering College,Changsha University of Science and Technology,Changsha,Hunan 410076,China);A Game Analysis on Quality Management of Engineering Project[J];;2005-04
9 ZHONG Yu-ping(National University of Defense Technology,Changsha 410073,China);The Application of Risk Management in General Contract International Hydropower Project[J];Hunan Nonferrous Metals;2006-03
10 SHI Wei,WANG Yong-xiang (School of Civil and Architectural Engineering,East China Jiaotong University,Nanchang 330013);Bidding risk analysis based on equal risk curve and fuzzy comprehensive evaluation method[J];Construction Management Modernization;2009-01
China Proceedings of conference Full-text Database 1 Hits
1 LIU Ren-hui~1 AN Shi~2 (1.School of Management,Harbin Institute of Technology,Harbin 150001,China;2.School of Science and Engineering on Communication,Harbin Institute of Technology,Harbin 150090,China);Project Risk Identification Model based on System Identification[A];[C];2007
【Secondary Citations】
Chinese Journal Full-text Database 6 Hits
1 LI Yan-bao,WU Yong-qiang,JIANG Xue-lian (School of Civil Engineering, Tianjin University, Tianjin300072,China);A Review of the Development of Research on Breakwater Failures at Home and Abroad[J];China Harbour Engineering;2004-06
2 ZHANG Zi-gang,CHENG Zhi-yong (College of Management,Huazhong University of Science & Technology,Wuhan 430074,China);Applying Utility Theory to Risk Management of Project[J];East China Economic Management;2004-04
3 LI Yanbao, MA Qingshan, JIANG Xuelian( School of Civil Engineering, Tianjin University, Tianjin 300072, China );A framework of Breakwater Risk Analysis[J];Marine Science Bulletin;2006-01
4 HAN Ying-ai (Changchun Engineering School, Changchun, Jilin\ 130012, China);Application of the Utility Theory in Construction Engineering Bid Decisions[J];Construction Technology;2004-12
5 WANG Yi-wang, DU Gang, QI Qing-zhu (School of Management,Tianjin University Tianjin,300072,China);A Research on the Programme Management model[J];Journal of Xidian University (Social Sciences Edition);2004-03
6 Cheng Tiexin, Huo Jidong and Liu Yuanzhang;A Review for the Evolution of Project Management[J];Management Review;2004-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved