Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Chongqing Jiaotong University(Natural Science)》 2011-S2
Add to Favorite Get Latest Update

Conceptual Design of Super-span Cable-stayed Bridge with Partial Ground-anchorage and Cross Stays

SHAO Xu-dong,HU Jia,ZHAO Hua (Department of Bridge Engineering,Hunan University,Changsha 410082,Hunan,China)  
This paper presents an original design scheme of super-span cable-stayed bridge,namely,a cable-stayed bridge with partial ground-anchorage and cross stays,which is appropriate for cable-stayed bridges with main span length around 1500 m.Its main characteristic is that the long stays cross with each other and are anchored in the ground-anchorage,and thus the long stays result in little horizontal pressure force in the main girder.Studies show that the proposed novel cable-stayed bridge system has the following significant advantages over conventional ones:① Horizontal pressure forces in the main girder caused by cables are greatly reduced;② The cross stays effectively increase the stiffness of the girder in the span-center region of the main span;③ As the cross stays can provide dual vertical supports and balance horizontal forces with each other perfectly,the horizontal angle of long stays can be reduced and the height of tower be decreased to only about 1/5.5 of main span length as a result;and ④The long stays form a network in the span-center region of the main span,which effectively improve the aerodynamic performance of the long stays.
【CateGory Index】: U448.27
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHOU Shangmeng,LI Yadong(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Synthesis optimization algorithm applied to extradoses bridge[J];Sichuan Building Science;2010-04
2 ZHU Bing-bing 1, WU Ling 2 (1.Anhui Chaohu Highway Administration Bureau, Chaohu 238001, China;2.Anhui Huayun Design and Consult Co. LTD. ,Hefei 230061, China);Measure and control of cable-stayed bridge in the construction[J];Journal of Anhui Institute of Architecture;2005-02
3 Guo Yang1, Du Yongfeng2 (1.Anhui Research and Design Institute for Architectural Science, Hefei 230001, China; 2.School of Civil Engineering, Hefei University of Technology, Hefei 230009, China);Simulation Analysis of the Construction Supervision of the No.3 Paihe Bridge[J];Anhui Architecture;2006-04
4 Ni Shiyuan1,Xie Junpei2(1.Feixi Building Administration,Hefei 231000,China;2.Feixi Construction Bureau,Hefei 231000,China);Construction Control of No.3 Paihe Bridge of Feixi County[J];Anhui Architecture;2006-05
5 Yang Huanhuan1 Wei Maolin2(1.Beijing Polytechnic College,Beijing 100042,China;2.Sichuan Chuangxiang Planning & Architectural Designing co.,LTD,Leshan Sichuan 614000,China);Finite Element Analysis and Research on Steel-concrete Joint Section of Hybrid Girder Cable-stayed Bridge[J];Journal of Beijing Polytechnic College;2009-03
6 LI Jiu-yang et al.(School of Civil Engineering,ChangchunInstitute of Technology,Changchun 130012,China);Mechanical analysis in designing inclined-pulling bracket for crossing river[J];Journal of Changchun Institute of Technology;2005-04
7 LIU Jian sheng 1, WANG Tong qing 1, WANG Gui xin 2, JU Yan 1, WANG Dai hua 1 (1.Dept of Opto Elct Engin,Chongqing University,Chongqing 400044,China; 2.Chongqing Logistic Engineering University,Chongqing 400042,China);Damage recognition of cable-stayed bridges based on polyvinylidene fluoride sensors[J];Journal of Transducer Technology;2002-07
8 HUANG Zhang-yu 1 ,JIN Hua 2 (1.Civil Engineering College,Hehai University,Nanjing210024,China;2.Construction Command Post of Second Nanjing River Bridge,Nanjing210028,China);Real-time Survey in the Main Bridge Construction Control of Large Tilt Dragged Bridge[J];Engineering of Surveying and Mapping;2002-01
9 GU Bi-feng~1,CAI Shao-yun~2,JIANG Bo~1;Construction Survey in the Cable-stayed Bridge of Runyang Yangtze River Road Bridge's North Branch[J];Bulletin of Surveying and Mapping;2005-01
10 YUE Jian-ping, XIE Bo, GAO Yong-gang;Research on Information Management and Visualization of Engineering Control Network[J];Bulletin of Surveying and Mapping;2005-05
China Proceedings of conference Full-text Database 4 Hits
1 Zhan Sheng~1,Xu Youlin~1,Hong Xiaojian~1,Zhu ledong~2,Zhang Xiaohua~1 (1 Department of Civil and Structural Engineering,The Hong Kong Polytechnic University,Hong Kong,China; 2 Department of bridge engineering,Tongji University,Shanghai,200092,China);Development of a Long Suspension Bridge Model for Structural Health Monitoring[A];[C];2009
2 HE Jun, ZHENG Da-wei, LEI Jun-qing ( School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044,China; Department of Bridge Engineering, Tongji university, Shanghai 200092,China; China International Engineering Consulting Corporation, Beijing 100044,China);Research on Construction Cable Force and Configuration Control of Long-Span Cable-Stayed Steel Bridge[A];[C];2006
3 HU Jian-hua (Hunan Provincial Communications Planning, Survey and Design Institute, Changsha 410008,China);Innovative Design of Structural Systems of Self-Anchored Suspension Bridge[A];[C];2006
4 NIE Jian-guo~(1,2) LI Fa-xiong~(1,2) FAN Jian-sheng~(1,2) 1.Dept.of Civil Engineering,Tsinghua University,Beijing 100084,China; 2.Key Laboratory of Structural Engineering and Vibration of China Education Ministry,Tsinghua University,Beijing,100084;Study on effective width of concrete deck in composite cable-stayed bridge[A];[C];2007
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved