《Chongqing Architecture》 2013-12
Add to Favorite Get Latest Update

Construction Technology for Frame Node of Post-pouring Square Ring Beam with Column Hoop

Huang Zhengrong;Wang Xianyong;Yu Haiyang;Zhou Xuemei;  
The friction force between reserved shear reinforcement(or embedded steel bar) with ring beam and the column withstands the structural load.That is to say,to add nodes of ring beam column hoop within the height scope of beam on the added floor slab,the section size and reinforcement of the nodes are determined after design and calculation,and the height of column hoop should be the same with that of newly added main beam.The main beam reinforcement should be anchored to ring beam column hoop,and the establishment of column hoop and template,the pouring of concrete and the construction of newly added beam structure should be carried out at the same time to meet the requirement of structure stress.
【CateGory Index】: TU755
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Zhong Caigen~1,Chen Geng~1,Cheng Cheng~2(1 Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2 Xiamen Municipal Engineering Design Institute Co.,Ltd.,Xiamen 361004,China;3 Nanjing Deji Real Estate Development Co.,Ltd.,Nanjing 210000,China);Disposal of joint connection used in top-down construction technology[J];Building Structure;2010-10
【Co-citations】
Chinese Journal Full-text Database 3 Hits
1 LIU Hui,YANG Yu,CAO Yu(Hubei Electric Power Survey & Design Institute,Wuhan 430024,China);Geotechnique Problem in Underground Substation Construction[J];Hubei Electric Power;2011-02
2 Zhong Caigen~1,Chen Geng~1,Cheng Cheng~2(1 Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2 Xiamen Municipal Engineering Design Institute Co.,Ltd.,Xiamen 361004,China;3 Nanjing Deji Real Estate Development Co.,Ltd.,Nanjing 210000,China);Disposal of joint connection used in top-down construction technology[J];Building Structure;2010-10
3 LONG Libo;Shanghai Construction No.2 (Group) Co.,Ltd.;Shanghai Center of Top-Down Method in Construction Engineering;;Experimental Study on Treatment Process of Structural Construction Joint in Later Period of Reversed Construction Method[J];Building Construction;2015-05
【Secondary Citations】
Chinese Journal Full-text Database 3 Hits
1 ;Haunch-Adding Treatment for Slab-Beam and Middle-Supporting-Column Joint in Basement Built with Semi-Reversed Construction Method[J];Building Construction;2006-10
2 ;Study on Construction and Joint Treatment for Temporary Vertical Supporting System in Top-Down Construction Method[J];Building Construction;2007-02
3 CHEN Shou-chang;Application of reverse construction technology[J];Shanxi Architecture;2008-17
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved