Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Electric Power Science and Technology》 2008-04
Add to Favorite Get Latest Update

Substation sequential operation and its application in Changsha power grid

LIU Zheng-yin,YANG Jun,JIN Yuan,YANG Jian-ping(Changsha Electric Power-Supply Bureau,Changsha 410015,China)  
Substation sequential operation is introduced,and the requirement of primary equipment and secondary equipment for substation sequential operation reconstructing is analyzed in this paper.With a practical example of substation sequential operation reconstructing for Changsha power grid,the technology basic,design and system structure for substation sequential operation are investigated.The substation work efficiency is great enhanced,and the cost is reduced effectively.The example can be a reference for other substation sequential operation reconstructing.
【CateGory Index】: TM769;TM63
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 TAI De-qun,ZHANG Dong,CHENG Wang-liu(Tongling Power Supply Company,Tongling 244000,China);Research and Application of Substation Sequential Control[J];Journal of Anhui Electrical Engineering Professional Technique College;2011-03
2 LI Li fang,LI Weixin (Xiamen Electricity Bureau,Xiamen 361004,Fujian China);Programmed Operation Control System Study and Application of 10 kV Distribution Switching Station[J];Distribution & Utilization;2010-05
3 Yan Ruijie;Li Haixiang;;Exploration and Application on Sequential Control in Smart Substation Simulation System[J];Shandong Electric Power;2014-03
【Citations】
Chinese Journal Full-text Database 4 Hits
1 LI Zai-hua,BAI Xiao-min,ZHOU Zi-guan,XU Jing,LI Xiao-jun, DING Jian,FANG Zhu(Electrical Power Research Institutes of China,Beijing,100085,China);Power grid dispatching protocol review and an application case analysis[J];Journal of Electric Power Science and Technology;2007-04
2 ZHOU Yong-ming1,PENG Dong-fei2,LIU Ke3(1.Dongying Municipal Engineering Design Institute,Dongying 257000,China;2.Administration Department of Pantou Reservoir,Chenzhou 423000,China;3.Changsha Electric Power Bureau,Changsha 410006,China);Status and conversion of neutral grounding model in distribution network in Changsha[J];Journal of Electric Power Science and Technology;2008-02
3 WANG Xiao-fang1,XIANG Qian2,LI Fu-liang3 (1.Department of Electrical Engineering,Shaoyang University,Shaoyang 422000,China;2.Beijing Bodian-Xinli Power System Instrument Limited Company,Beijing 100098,China;3.Hunan Hydroelectric Occupational College,Changsha 410131,China);Protective devices test for digital substations[J];Journal of Electric Power Science and Technology;2008-03
4 YE Feng, SHEN Jun, YANG Shihua, GU Jian (NARI-Relays Electric Co Ltd, Nanjing 211100, China);Implementation of Sequence Control in Substation Automation System[J];Automation of Electric Power Systems;2006-21
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Shi-ming1,LI Wei2,YUE Zeng-hui2 (1.School of Electrical Engineering,Shandong University,Jinan 250061,China;2.Yantai Dongfang Electronics Co.LTD,Yantai 264000,China);Software-only testing system for protective relay based on IEC61850[J];Journal of Electric Power Science and Technology;2010-01
2 YU Wen-hui1,LI Jian2,CHEN Zu-xun2(1.Maomen Power Supper Bureau,Maomen 525000,China; 2.The Extrahigh Voltage Subcompany of Shandong Electric Power Company,Jinan 250021,China);A novel voltage arc-suppression method for grounding faults in distribution networks[J];Journal of Electric Power Science and Technology;2012-01
3 YE Feng, SHEN Jun, YANG Shihua, GU Jian (NARI-Relays Electric Co Ltd, Nanjing 211100, China);Implementation of Sequence Control in Substation Automation System[J];Automation of Electric Power Systems;2006-21
4 LUO Jiawen1,DUAN Bin1,2,XIAO Hongguang1(1.Changsha University of Science and Technology,Changsha 410076,China;2.XiangTan University,Xiangtan 411105,China);Research on On-line Interlocking Mechanism of Substation Automation Based on Wide Area Security Defense[J];Automation of Electric Power Systems;2008-02
5 WANG Wenlong, HU Shaoqian, TANG Zhenyu(Nanjing NARI-Relays Electric Co. Ltd., Nanjing 211102, China);Some Key Issues in Implementing Sequence Control in Substation Automation System[J];Automation of Electric Power Systems;2008-22
6 LIU Ju,YU Bin,WANG Zhilin(Beijing Sifang Automation Co.Ltd.,Beijing 100085,China);A Scheme for Implementing Distributed Sequence Control of Substation Automation System Independent of Protocol[J];Automation of Electric Power Systems;2009-07
7 WANG Wenlong1,LIU Yin2,DAI Xiaoxiang1,HU Shaoqian1,LI Youjun1,XU Guanghui1(1.Nanjing NARI-Relays Electric Co.Ltd.,Nanjing 211100,China;2.Beijing Electric Power Corporation,Beijing 100054,China);Influence of Sequential Operation on an Expanded Substation[J];Automation of Electric Power Systems;2009-07
8 WANG Shuchao(Chinese Society for Electrical Engineering,Nanjing 211100,China);Application of Sequence Control Technology in IEC 61850 Based Substation Automation System[J];Automation of Electric Power Systems;2010-08
9 ZHANG Jing,LI Xianbo,LI Ke,OU Ye(State Grid Electric Power Research Institute,Nanjing 210003,China);An Intelligent Sequential Operation Scheme Based on Script Language[J];Automation of Electric Power Systems;2012-06
10 GONG Jian-ping,WU Guo-pei,LUO Zhen-hai,MAO Wei-min,FU Gang-lin(Guangzhou Power Supply Company,Guangzhou 510620,China);Application of IEC 61850 and sequential operation in substation[J];Telecommunications for Electric Power System;2009-04
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 TAI De-qun,ZHANG Dong,CHENG Wang-liu(Tongling Power Supply Company,Tongling 244000,China);Research and Application of Substation Sequential Control[J];Journal of Anhui Electrical Engineering Professional Technique College;2011-03
2 ;The Research of Transformation to Digital Substation[J];Anhui Electric Power;2009-03
3 LI Zai-hua,BAI Xiao-min,ZHOU Zi-guan,XU Jing,LI Xiao-jun, DING Jian,FANG Zhu(Electrical Power Research Institutes of China,Beijing,100085,China);Power grid dispatching protocol review and an application case analysis[J];Journal of Electric Power Science and Technology;2007-04
4 FENG Yong xin, ZHAO Lin liang, WANG Guang xing (School of Information Science and Engineering, Northeastern University, Shenyang 110004,China);A Network Reconfiguration and Recover Strategy Based on Mobile Network[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2001-04
5 Zhu Daxin (National Power Company Power Automation Institute);The Development of Intergrated Automation System of Digital Transformer Station[J];Electrotechnical Journal;2001-04
6 Gao Zhuo,L uo Yi,Tu Guangyu,Wu Tong Huazhong U niversity of Science and Technology,Wuhan430 0 74,China;ANALYSISOF COMPUTER NETWORK SECURITY IN SUBSTATION[J];Automation of Electric Power Systems;2002-01
7 Zhao Jiaqing(Suzhou Power Supply Company, Suzhou 215004, China);COMPUTER CENTRALIZED SCADA SYSTEM ON UNMANNED 220 kV SUBSTATION[J];Automation of Electric Power Systems;2003-08
8 Tang Tao(Nanjing Sino German Protection & Substation Control System Ltd. Co. Nanjing 210003, China);DEVELOPMENT AND PROSPECTS FOR THE AUTOMATION TECHNOLOGY OF POWER PLANTS AND SUBSTATIONS[J];Automation of Electric Power Systems;2004-04
9 Yin Zhiliang, Liu Wanshun, Yang Qixun, Qin Yinli (North China Electric Power University Sifang Institute, Beijing 100085, China);NEW METHOD FOR IMPLEMENTING THE SYNCHRONIZATION OF MERGING UNIT ACCORDING TO THE IEC 61850 STANDARD[J];Automation of Electric Power Systems;2004-11
10 ZHAO Xi-cai (Nanjing Automation Research Institute, Nanjing 210003, China);A Review of CIGRE ' 2004 on Protection and Automation[J];Automation of Electric Power Systems;2005-04
【Secondary References】
Chinese Journal Full-text Database 6 Hits
1 Chen Yuhui,Jiang Biao,Mao Weijie (Songjiang Power Supply Company,SMEPC,Shanghai 201600,Shanghai China);Research on the Modes of Preventing Mal-Operation of the High-Tension Loop-Network Cabinets in the Distribution Network[J];Distribution & Utilization;2011-04
2 Chen Handong;Chen Yong (Shanghai Chongming Electricity Company,Shanghai 202150,Shanghai China);Development and Application of Improved Smart Mimic Board in Substation[J];Distribution & Utilization;2011-04
3 Huang Chunhong,Lin Jibin(Xiamen Electric Power Bureau,Xiamen 361004,Fujian China);The Sequential Control Intelligent Creation Technology of Substation and its Application[J];Distribution & Utilization;2011-05
4 Zhang Junjun,Zhuang Jiali,Tian Qian(Shanghai Songjiang Power Supply Company,SMEPC,Shanghai 201600,Shanghai China);Research on the Protection Configuration of 10 kV Switching Station[J];Distribution & Utilization;2012-01
5 LIANG Gui(Guangxi Power Grid Corporation Liujiang Power Supply Bureau,Yongning Nanning Guangxi,545100);Key Techniques of 35 kV Digital Substation[J];Electric Switchgear;2013-03
6 DAI Dongyun;WU Yuede;YU Dongmei;LUO Hu;WANG Yu;Xi'an High Voltage Apparatus Research Institute Co.,Ltd.;State Grid Shanxi Elecric Power Company of Yuxian Electric Supply Company;;Design and Application of Integrated Control and Supervisory Electric Chassis Unit[J];High Voltage Apparatus;2015-07
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 XU Yu-qin,LIU Li-hua,ZHANG Li(College of Electrical Engineering,Huabei University of Electric Power,Baoding 071003,China);Capacitor current compensating approach for current differential protection of ultra-high voltage transmission line[J];Journal of Electric Power Science and Technology;2007-02
2 ZHAO Yu-fu,CHEN Zhuo-ya,GUO Hong (Henan Electric Power Research Institute,Zhengzhou 450052,Henan,China);Electronic Transformer[J];Electrical Measurement & Instrumentation;2006-06
3 Xin Yaozhong (The National Electric Power Dispatching and Communication Center of China. 100761. Beijing. China);DATA COMMUNICATION PROTOCOL SERIES FOR POWER SYSTEMS[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-01
4 Tan Wenshu (Electric Power Research Institute, 100085, Beijing. China);THE TRANSMISSION PROTOCOL OF DISTRIBUTION AUTOMATION SYSTEM[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-16
5 Zhao Jiaqing(Suzhou Power Supply Company, Suzhou 215004, China);COMPUTER CENTRALIZED SCADA SYSTEM ON UNMANNED 220 kV SUBSTATION[J];Automation of Electric Power Systems;2003-08
6 Tang Tao(Nanjing Sino German Protection & Substation Control System Ltd. Co. Nanjing 210003, China);DEVELOPMENT AND PROSPECTS FOR THE AUTOMATION TECHNOLOGY OF POWER PLANTS AND SUBSTATIONS[J];Automation of Electric Power Systems;2004-04
7 Huang Yizhuang,Lu Wenzhe(D.E.E.,Tsinghua University,Beijing);STRUCTURE OF AN INTELLIGENT COMPREHENSIVE AUTOMATION SYSTEM FOR SUBSTATIONS[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1995-10
8 ZHU Yong-chang1,WANG Hai-zhen2(1. Zhejiang University,Hangzhou 310027,China;2. Hangzhou Electric Power Education and Training Centre,Hangzhou 310015,China);Design of blocking against misoperation in configuration of distributed electric control system[J];Electric Power Automation Equipment;2004-09
9 ZHOU Hong-tao,FU Bin-jie,ZHAO Xiao-dong,PAN Shu-yan(Nanjing Sino-Germany Protection & Substation Control System Co.,Ltd.,Nanjing 210003,China);Program control of 10 kV switch cabinet in Anzhen substation[J];Electric Power Automation Equipment;2006-04
10 JIA Chun\|juan (Shandong University of Technology, Jinan 250061, Shandong Province, China);CONNECTION TECHNIQUE OF REAL-TIME SYSTEM BASED ON CORBA[J];Power System Technology;2001-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved