Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Roads Bridges & Flood Control》 2011-09
Add to Favorite Get Latest Update

Scheme Design Conception of Fuyuan Road Xiangjiang Bridge in Changsha City

Lu Yongcheng  
The total length of Fuyuan Road Xiangjiang Bridge in Changsha City is 1.435 km.The bridge is composed of the main channel bridge,auxiliary channel bridge,and the east and west approach bridges.It is a large-scale combined structural crossing-river bridge.The main channel bridge is the combined structure of 3 × 210 m continuous steel arch-combined beam.The auxiliary channel bridge and the east and west approach bridges are the structures of the basic span 85-m steel and concrete combined continuous beams.The design conception of bridge schemes can be referred for the similar projects.
【Key Words】: combined structure arch bridge continuous beam jacking construction design construction
【CateGory Index】: U442.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 Wei Hua,Jiang Yingchong,Xi Lingzhi;Conception of Scheme Design for Fuzhou Wushan Bridge[J];Urban Roads Bridges & Flood Control;2012-08
【Co-references】
Chinese Journal Full-text Database 1 Hits
1 CHEN Bao-chun(College of Civil Engineering,Fuzhou University,Fuzhou,Fujian 350108,China);View and review of arch bridge technology[J];Journal of Fuzhou University(Natural Science Edition);2009-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved