Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Roads Bridges & Flood Control》 2017-12
Add to Favorite Get Latest Update

Study on Drainage Design of High Fill Subgrade in Urban Road

Wei Peng;Ma Guogang;  
As for the design of Rainwater Discharge Outlet 3# in Lanzhou Yide International Trade City Planned Road V Rainwater Project, it is required to study and solve the problem of excessive rainfall, and also to study the layout issues of dark buried pipeline and drop manhole on the high fill subgrade slope.The relative experience can be referred for the relative professionals.
【CateGory Index】: U417.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved