Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Railway Science and Engineering》 1986-02
Add to Favorite Get Latest Update

A Method for Reduction of Project Networks

Zhou Xu (Department of Civil Engineering)  
This paper treats the problem of reducing large project networkswith continuous nonlinear cost-time relationship.A method basedon quadratic programming is presented.This method is simplerin computation than dynamic programming.Moreover,it canreduce the coupling networks,which dynamic programming cannot do.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Zhou Xu;Quadratic Programming Method for Optimization of Cost-duration in Planning Networks[J];;1985-01
【Co-citations】
Chinese Journal Full-text Database 1 Hits
1 Meng Lingjing He Bowen(School of Computer,China University of Geosciences,Wuhan 430074);Application and Study of Program Evaluation and Review Technique Based on Ant Colony Algorithm[J];Computer & Digital Engineering;2009-10
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Li Junqi (Dept.of Urban Construction Engineering, Beijing 100044);Study of Large Network Plan Time-cost Optimization[J];Journal of Beijing Institute of Civil Engineering and Architecture;1996-03
2 LU Hao,WU Huan qun,LUO Yi (Changsha Comm.Univ.,Changsha 410076,China);A Time-cost Optimization Modeling and Program[J];Journal of Changsha Communications University;2001-02
3 Zhou Xu;Quadratic Programming Method for Optimization of Cost-duration in Planning Networks[J];;1985-01
4 Wang Yanshu Cheng Hu (College of Civil Engineering, Southeast University, Nanjing 210096);Integrated Management of Construction Project[J];JOURNAL OF SOUTHEAST UNIVWRSITY(NATURAL SCIENCE EDITION);2000-04
5 ShenHoucai;XuNanrong;ZhongWeijun(Economics and Management School,Southeast University, Nanjing 210018);A Study on the Bilevel Decision Method for the Multiobjective Problem with0- 1 Variables[J];JOURNAL OF SOUTHEAST UNIVWRSITY;1995-06
6 ZHONG Wei,YIN Zhi wen,LOU Na (School of Management Fudan University,Shanghai 200433,China);A New Optimizing Algorithm for the Time-Cost Project Network[J];Journal of Fudan University;2001-04
7 LUO Gang~1, LIU Er-lie~1, WANG Jian~2(1. School of Management,Tianjin University,Tianjin 300072,China;2. Dept. of Applied Mathematics,University of Colorado,Colorado US);Time-cost Tradeoff Optimization of Construction Projects Using Genetic Algorithms[J];Industrial Engineering Journal;2005-04
8 HU,ying Hydroelectric Institute of Gezhouba;A New Method of Seeking for Optimum Time in CPM[J];Journal of Industrial Engineering and Engineering Management;1989-Z2
9 Chen Senfa Lin Yihong(Southeast University);A New Algorithm for the Least Cost Scheduling in Network Project[J];Journal of Industrial Engineering and Engineering Management;1992-02
10 BI Yu-feng~1,WANG Xuan-cang~2,SUN Li-Jun~1,Liu Wei~3 (1.Tongji University, Shanghai 200092, China; 2.Chang'an University,Shanxi Xi'an 710064, China; 3.Zhoukou Highway department of Henan Province, Henan Zhoukou 466000, China);GA's2rithmetic on Time-cost Optimization in Highway Engineering[J];Journal of Highway and Transportation Research and Development;2004-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved