Analysis and construction control of a large span arch bridge

ZHOU Dong-liang,HUA Qiang(Construction and Development of Ruchen Expressway Co.Ltd,Chenzhou 423000,China)  
The configuration controlling measures of large span arch bridges were discussed by taking the construction of certain bridge as an example.According to the actual lifting and assembling process of the precast segments of the arch ribs,a theoretical analysis method is called rigid-elastic cable method was proposed for acquiring the installing coordinates of precast arch rib segments.Observation points for three dimensional coordinates gauges were installed prior to the lifting and assembling of the precast arch rib segments in order for in situ monitoring of the deformation of the arch during its lifting and assembling process as well as the construction process of the up-arch superstructure.The monitoring results show that the closure curves of all the arch ribs are in a good accordance with the theoretical ones,and the elevation errors of the arch ribs meet the demand specified by the relevant codes,and the deformation induced in the construction of up-arch superstructure develops evenly in the whole arch within safety limits.Through such a severe monitoring of its construction process,the quality and construction safety of the bridge are ensured,and the successive construction of the bridge illustrates the favorable applicability of the proposed methods,which can be adopted in the construction of similar structures.
【CateGory Index】: U445.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 8 Hits
1 ZHOU Shui xing 1,\ JIANG Li zhong 2,\ ZENG\ Zhong 3, ZHOU Jian ting 1 (1 Department of Bridge & Structural Engineering Chongqing Jiaotong Institute,Chongqing 400074,China;2 Sichuan Province Highway Bureau,Chengdu 610013,China;3 Da Yu Free;Simulate calculation study of cable-stayed force for arch bridge segmental construction[J];JOURNAL OF CHONGQING JIAOTONG INSTITUTE;2000-03
2 ZOU Zhong-quan1,HE Guo-jing2,WU Zai-xin1,LI Yuan-yuan1(1.School of Civil and Architectural Engineering,Central South University,Changsha 410075,China;2.College of Civil Engineering,Architecture and Mechanics,Central South University of Forestry and Technology,Changsha 410075,China);Research on computation methods for long-span arch bridge in constructing process while its precast segments are assembled with cables[J];Journal of Railway Science and Engineering;2007-03
3 YANG Xiao-li,WANG Jin-ming,SUI Zhi-rong(School of Civil and Architectural Engineering,Central South University,Changsha 410075,China);Stability analysis of tunnel surrounding rock based on Hoek-Brown yield criterion[J];Journal of Railway Science and Engineering;2008-05
4 Zhang Kaiyin 1) Liu Sanyuan 2) He Yuwei 2) Yi Guangming 3) (College of Naval Architecture & Civil Engineering,WTU,Wuhan 430063) 1) (Hubei Highway & Bridge Company,Wuhan 430052) 2) (The 12th Engineering Bureau of Railroa;Dynamic Control of the Arch Rib Alignment for Long span Concrete-filled Steel-tube Arch Bridge[J];JOURNAL OF WUHAN TRANSPORTATION UNIVERSITY;2000-01
5 YUAN Haiqing,FAN Xiaochun,FAN Jianfeng,ZHOU Qiangxin (School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070,China);Iterative go-ahead method of rib-assembling predicting for long-span concrete filled steel tubular arch bridge[J];China Journal of Highway and Transport;2003-03
6 Zheng Jielian[Guangxi Zhuang Autonomous Region Communications Administration, Nanning, 530012];Discussion on Technology of Suspending and Connecting for the RC Bridge with an Unusual Big Span[J];CHINA JOURNAL OF HIGHWAY AND TRANSPORT;1999-01
7 YANG Xiao-li,SUI Zhi-rong(School of Civil and Architectural Engineering,Central South University,Changsha 410075,China);Influences of stress dilatancy on stability factors of shallow tunnels[J];Journal of Central South University(Science and Technology);2008-01
8 YANG Xiao-li,LUO Heng,LI Lao-san(School of Civil and Architectural Engineering,Central South University,Changsha 410075,China);Dynamic response of single arch tunnel with four lanes induced by earthquake[J];Journal of Central South University(Science and Technology);2008-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHANG\ Hang 1, GONG Liang pu\+2 (1 College of transportation, Wuhan Technial University, Wuhan 430063, China; 2 Highway Bureau of Wufeng County,Hubei 443400, China);The modification technique of the principle of least squares for the tension of cables[J];Journal of Chongqing Jiaotong Institute;2002-03
2 MEI Gai-wei,ZHANG Min,ZHOU Shui-xing(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Solution on Cable Force and Segmental Camber in Arch Bridge Construction by Modified Inverted Method[J];Journal of Chongqing Jiaotong University(Natural Science);2009-02
3 HE Yu wei 1, LIU San yuan 1, ZHANG Kai ying 2 (1.Hubei Provincial Road Construction Chief Co., Wuhan 430052, China; 2.Wuhan Transportation University, Wuhan 430063, China);Integrated Construction Technology of Cable Erection Bent Tower Fastening of Longtan River Bridge[J];Journal of Changsha Communications University;2000-04
4 ZHANG Yu-ping, LI Chuan-xi, DONG Chuang-wen (Changsha University of Science and Technology, Changsha 410076, China);Discussion on "Zero Moment Method" in theCable Calculation of Cable-stay[J];Journal of Changsha Communications University;2004-01
5 ZOU Zhong-quan1,HE Guo-jing2,WU Zai-xin1,LI Yuan-yuan1(1.School of Civil and Architectural Engineering,Central South University,Changsha 410075,China;2.College of Civil Engineering,Architecture and Mechanics,Central South University of Forestry and Technology,Changsha 410075,China);Research on computation methods for long-span arch bridge in constructing process while its precast segments are assembled with cables[J];Journal of Railway Science and Engineering;2007-03
6 Sun Xiaohong Ren Weixin(Department of Civil Engineering, Fuzhou University, Fuzhou 350002);Prearranged Heights Calculation Of Steel Archribs During Erecting Concrete-Filled Steel Tubular Archribs[J];Fujian Architecture & Construction;2005-03
7 Xie Xiaoli,Qin Rong,Peng Wenli,Deng Zhiheng (Guangxi University, Nanning 530004,China);Theoretical Analysis of Creep and Shrinkage Effects in SRC Arch Bridge[J];Engineering Science;2001-03
8 ZHANG Zhi-cheng1 , YE Gui-ru1 , WANG Yun-feng2 (1. Civil Engineering Department of Zhejiang University, Hangzhou 310027, China; 2. Architectural Design Institute of Zhejiang University, Zhejiang 310027 China);OPTIMIZATION OF STAYED-BUCKLE CABLE FORCES DURING ADJUSTMENT OFTHE LINE-SHAPE ON LONG SPANARCH BRIDGE[J];Engineering Mechanics;2004-06
9 *XIE Xiao-li1,2 , ZHAO Guo-fan2 , HU An-ni2 , ZOU Cun-jun1 (1. College of Civil Engineering and Architectures, Guangxi University, Nanning, Guangxi 530004, China; 2. State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Dalian, Liaoning 116024, China);THE SECOND-ORDER ANALYSIS OF PRERAISED HEIGHT OF CONCRETE-FILLED STEEL TUBE ARCH BRIDGE DURING CONSTRUCTION CONSIDERING TEMPERATURE EFFECT[J];Engineering Mechanics;2005-04
10 CHEN De-liang, MIAO Li, TIAN Zhong-chu, LUO Zhong-lin (College of Bridge and Structure Engineering, Changsha University of Science & Technology, Changsha, Hunan 410076, China);CALCULATION OF THE CABLE-STAYED FORCE AND PRE-CAMER IN THE PROCESS OF ASSEMBLING ARCH BRIDGE SEGMENTS[J];Engineering Mechanics;2007-05
China Proceedings of conference Full-text Database 1 Hits
1 WANG Xiao-lu~1 ZHANG Su-mei~1 HUI Zhong-hua~2 1.School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China; 2.China Railway 13th Bureau Group Co.,LTD,Jilin,Changehun 130033,China;First order optimization method for calculating temporary cable force during the erection of arch bridge[A];[C];2007
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 ZHOU Shui xing 1,\ JIANG Li zhong 2,\ ZENG\ Zhong 3, ZHOU Jian ting 1 (1 Department of Bridge & Structural Engineering Chongqing Jiaotong Institute,Chongqing 400074,China;2 Sichuan Province Highway Bureau,Chengdu 610013,China;3 Da Yu Free;Simulate calculation study of cable-stayed force for arch bridge segmental construction[J];JOURNAL OF CHONGQING JIAOTONG INSTITUTE;2000-03
2 Wang Xiaoming (Architectural Engineering Department, South China University of Technology, Guangzhou, 510641);Computational Model for Cable with Changeable Initial Length[J];;1992-03
3 Zhang Kaiyin 1) Liu Sanyuan 2) He Yuwei 2) Yi Guangming 3) (College of Naval Architecture & Civil Engineering,WTU,Wuhan 430063) 1) (Hubei Highway & Bridge Company,Wuhan 430052) 2) (The 12th Engineering Bureau of Railroa;Dynamic Control of the Arch Rib Alignment for Long span Concrete-filled Steel-tube Arch Bridge[J];JOURNAL OF WUHAN TRANSPORTATION UNIVERSITY;2000-01
4 Shen Chengwu1) Du Guodong2) He Xiongjun1) Shen Diandong2) Lei Jianpin1)(Department of Civil Engineering,WTU1))(Communicaion Bureau of Zigui County,Hubei Province2));Inverse Analysis of Cable Forces on Filled SteelFubular Arch Bridge with Long Spanin Process of Installation[J];JOURNAL OF WUHAN TRANSPORTATION UNIVERSITY;1998-03
5 ZHANG Jian min 1, ZHENG Jie lian 2, QIN Rong 3 (1.Department of Civil Engineering, South China University of Techology, Guangzhou 510641, China;2.Guangxi Communication Department, Nanning 530011,China; 3. Department of Civil Engineering, Guangxi;A Calculation Method for Optimizing the Installation Process of CFST Arch Bridge[J];Bridge Construction;2002-01
6 TIAN Zhong-chu,CHEN De-liang,YAN Dong-huang,HE Bin,JIANG Tian-yong(School of Bridge & Structure Engineering, Changsha University of Science & Technology,Changsha 410076, China);Determination of the Buckling Cable-force and Precamber in the Process of Assembling Arch Ring Segments of a Long-span Arch Bridge[J];Journal of The China Railway Society;2004-03
7 Jiang Gong Hang (Parsons Brinckerhoff, Inc.);LIMIT ANALYSIS OF THE STABILITY OF SHALLOW TUNNELS IN SOFT GROUND[J];China Civil Engineering Journal;1998-05
8 Yuan Haiqing Fan Jianfeng Fan Xiaochun;Study of Line-shape Optimizing Method About Rib-assembling Coursing of Concrete Filled Steel Tubular Arc Bridges[J];Journal of Wuhan University of Technology;2002-02
9 Yang Xiaoli,Li Liang,Liu Baochen (Civil and Architectural Engineering College,Central South University, Changsha 410075 China);EVALUATION ON STRUCTURE STABILITY OF UNSYMMETRICALLY LOADED TUNNELS USING THE THEORY OF INFORMATION OPTIMIZATION ANALYSIS[J];Chinese Journal of Rock Mechanics and Engineering;2002-04
10 CHEN Fei1,2,DENG Jianhui3(1.Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;2.Dadu River Hydropower Development Co.,Ltd.,Chengdu,Sichuan 610016,China;3.State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu,Sichuan 610065,China);THREE-DIMENSIONAL STABILITY ANALYSIS OF ROCK SLOPE WITH STRENGTH REDUCTION METHOD[J];Chinese Journal of Rock Mechanics and Engineering;2006-12
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved