Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Railway Science and Engineering》 2011-04
Add to Favorite Get Latest Update

Research on risk evaluation in inter-city railway construction project based on fuzzy analytic network process

TANG Wen-bin1,2,ZHANG Fei-lian1,LI Jing-jing1,3(1.School of Civil Engineering,Central South University,Changsha 410075,China; 2.School of Economy and Management,Changsha University of Science and Technology,Changsha 410004,China; 3.School of Traffic and Transportation Engineering,Changsha University of Science and Technology,Changsha 410004,China)  
As the risks in inter-city railway construction projects are various and of complex relationship,many risk factors are complex and mutual dependence and mutual influence.What's more,many risk factors have problems like difficulty in accurate description of risks degree and unclear borders.Methods combining fuzzy evaluation theory and network analysis were utilized to establish risk evaluation system and evaluation model,and to completely state application of fuzzy ANP in project risk evaluation by taking a certain example,which shall provide decision reference for effectively controlling risks of inter-city railway construction project.
【Fund】: 国家社科基金资助项目(10CGL063);; 湖南省社科基金重点项目(2010ZDB30;09WTB09);湖南省社科基金一般项目(2010YBA003);; 湖南省高校创新平台开放基金项目(11K005);; 湖南省重点学科资助项目(10qgzh05)
【CateGory Index】: U239.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 LI Jing1,SUN Yasheng2(1.School of Civil and Hydraulic Eng.Dalian University of Tech.,Dalian 116023,China; 2.China Harbor Engineering Company Ltd.Beijing 100027,China);Application of F-ANP in risk evaluation of offshore wind power projects[J];Journal of Liaoning Technical University(Natural Science);2011-01
2 TANG Wen-bin1,2,ZHANG Fei-lian1 (1.School of Civil Engineering and Architecture,Central South University,Changsha 410075;2.School of Economy and Management,Changsha University of Science and Technology,Changsha 410114,China);The Risk of Evaluation Methodology of Urban Rail Transit Investment and Financing[J];Systems Engineering;2011-01
3 Wen Yujun Shanghai Shentong Metro Group Co.,Ltd.,2010003,Shanghai,China;Application of Risk Management in the Construction of Shanghai Urban Rail Transit[J];Urban Mass Transit;2010-06
4 XIE Lei,WANG Shu,DONG Jianjun;Economic Risks and Evading Countermeasures of Urban Rail Transit under PPP Financing Mode[J];Construction Economy;2008-10
5 WANG Pu, LIN Jing-ping (School of Economics and Management Department, East China Jiaotong University, Nanchang 330013, China);Research on Risk Evaluation Index System for railway main lines[J];Railway Computer Application;2009-09
6 ;Study on the Evaluation of Large Engineering Project Risk Based on the Theory of ANP[J];China Quality;2006-11
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 TANG Wen-bin1,2,ZHANG Fei-lian1 (1.School of Civil Engineering and Architecture,Central South University,Changsha 410075;2.School of Economy and Management,Changsha University of Science and Technology,Changsha 410114,China);The Risk of Evaluation Methodology of Urban Rail Transit Investment and Financing[J];Systems Engineering;2011-01
2 Xie Yousong Shenzhen Metro Group Co..Ltd., 518000,Shenzhen,China;Benefit Analysis of Safety Management Information System of Shenzhen Metro Line 5[J];Urban Mass Transit;2011-05
3 Zhu Husheng Shanghai Shentong Metro Group Co.,Ltd.,201103,Shanghai,China;Problems in the Construction and Management of Shanghai Rail Transit Line 10 during the First Phase Engineering[J];Urban Mass Transit;2012-01
4 Zhou Mingbao,Huang Hongwei,Jiang Fan,Shi Yi Suzhou Rail Transit Ltd.,Suzhou,China;Application and Implement of Risk Management on Construction of Suzhou Urban Rail Transit[J];Urban Mass Transit;2012-02
5 Chen Tao,Zhou Shunhua,Gong Quanmei Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,201804,Shanghai,China;Risk Analysis in the Construction of Multiple Combined Foundation Pits[J];Urban Mass Transit;2012-03
6 Wu Tao Shanghai Maglev Transportation Development Co.,Ltd.,201204,Shanghai,China;Safety Management of Maglev Transportation Based on Risk Identification & Control[J];Urban Mass Transit;2012-06
7 Deng Zhenhua(Planning and Finance Division,East China Jiaotong University,Jiangxi Nanchang 330013);The SWOT Analysis of BOT Model on Investment and Financing for the Program of Inter-city Rail[J];Science Mosaic;2010-08
8 LAI Zhi-xiang,YE Jia-wei(South China University of Technology,Guangzhou 510640,P.R.China);Optimization in Sub-production Processes Based on ANP Fuzzy Comprehensive Judgment[J];Science Technology and Engineering;2009-23
9 DU Jun,WANG Li-hao(College of Safety Science & Engineering,Civil Aviation University of China,Tianjin 300300,China);Research on the Risk Evaluation Index System for Collection in Air Transport of Dangerous Goods[J];Safety and Environmental Engineering;2011-03
10 XIAO Zhen-hong,SUN Feng-ling (School of Economic and Management,Harbin Engineering University,Harbin 150001,China);Research on Evaluation of M&A Financing Risk in the Preliminary Planning Stage for Listed Company[J];On Economic Problems;2012-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 HUANG Qing-chao1,CHI Li-bing2,3,TANG Yu-xuan3,HU Chun-bin3(1.Dongguan Road Transportation Administration Department,Dongguan Guangdong 523125,China;2.School of Science and Engineering on Transportation,Harbin Institute of Technology,Harbin Heilongjiang 150090,China;3.China Academy of Urban Planning & Design,Beijing 100037,China);Regional Intercity Rail Transit:Functionalities and Construction Standard[J];Urban Transport of China;2010-04
2 REN Yu-long,WU Guo-sheng,XU-jin,ZHANG-yu(College of Economics and Business Administration , Chongqing University ,Chongqing 400030,China );Economic Analysis of Principal Parts of Engineering Project[J];Journal of Chongqing University(Natural Science Edition);2004-04
3 XIANG Peng-cheng,REN Hong,ZHONG Yun,FENG Ying-bin,(College of Construction Management & Real Estate,Chongqing University,Chongqing 400045,China);The Behavior Game Analysis for participants in construction project Based on The theory of Information Asymmetries[J];Journal of Chongqing University(Natural Science Edition);2007-10
4 XIE Ru-he~1, ZONG Yan~2, WANG Rong-hua~3, QIU Zhu-qiang~2(1.School of Economy and Management, Guangzhou University, Guangzhou 510091, China; 2.School of Transportation Engineering, Central South University, Changsha 410075, China;3.Shimen-Changsha Railway Company, Ltd. Guangzhou Railway Group Company, Changsha 410001, China);Comprehensive appraisement on intercity railway passenger transportation[J];Journal of Guangzhou University(Natural Science Edition);2005-01
5 ZHANG Zhi-qin SONG Yuan-sheng (China Railway Eryuan Engineering Group Co.,Ltd,Chengdu 610031,China);Study on the Maximum Gradient of Intercity Railway[J];High Speed Railway Technology;2011-01
6 REN Zhi-tao~(1,2),ZHANG Shi-ying~1 (1.Management Institute,Tianjin University,Tianjin 300072,China;2.Construction Industry Management Office of Hanan,Handan 056001,China);Rent-seeking analysis to employer and contractor[J];Journal of Hebei Institute of Architectural Science and Technology;2004-01
7 XIANG Pengcheng , XIE Linlin;Construction Project Risk Management Based on the Theory of Information Asymmetries[J];Construction Economy;2008-01
8 ZHANG Chaoyong;Game Analysis and Supervision Mechanism Design of the Collusion of Players Involved in Agent Construction System[J];Construction Economy;2010-02
9 XIANG Pengcheng,KONG Deping;A New View of Construction Project Risk Research——Behavioral Risk of Principal Participants in Construction Project[J];Construction Economy;2010-03
10 ;Evaluation of Marketing Moral Hazard based on the Enterprise Vulnerability[J];Pioneering with Science & Technology Monthly;2009-12
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LI An-yun(Chongqing University of Science and Technology,Chongqing 400042,China);The Application of Analytical Hierarchy Process in Project Risk Management[J];;2005-03
2 Wang Haisheng,He Dehong,Huang YuxiangFirst-author′s address College of Economic & Management,Tongji Univ., 200092,Shanghai,China;Risk Analysis of Urban Mass Transit Investment PPP Mode[J];Urban Mass Transit;2005-03
3 Xie Weidong,He WenChina Development Bank,100037,Beijing,China;PPP Pattern Financing in Urban Mass Transit Realm of China[J];Urban Mass Transit;2006-03
4 CHEN Liu-qin (Tianjin Academy of Social Sciences,Tianjin 300191,China);Applying PPP Mode in Financing on Urban Rail Transit Construction[J];Journal of Hubei University of Economics;2006-02
5 LI Jinghua LI Qiming;Economic Risk Factor Analysis of Urban Rail Transport under PPP—Taking Beijing Metro Line 4 as an- Example[J];Construction Economy;2007-10
6 YANG Yu , SUN Yan;Risks of PPP Financing Projects and Measures of Avoiding Risks by Contract[J];Construction Economy;2008-06
7 XIE Lei,WANG Shu,DONG Jianjun;Economic Risks and Evading Countermeasures of Urban Rail Transit under PPP Financing Mode[J];Construction Economy;2008-10
8 LU Zhi-feng,YUAN Da-xiang,LIU Na-bing;The Application of Monte Carlo Simulation in Risk Decision of Construction Project[J];Sci-Tech Information Development & Economy;2007-35
9 Tian Yuanfu~(1,2),Li Huimin~1 ( 1. Xi'an University of Architecture and Technology,Xi'an710055,China; 2. School of Civil Engineering, Lanzhou Jiaotong University,Lanzhou730070,China);A study of hazard assessment on project building phase[J];Lanzhou Jiaotong University;2004-01
10 ZHOU Hong-bo~(1,2)(1.Shanghai Research Institute of Building Sciences,Shanghai 200032,China;2.Shanghai Jianke Project Management Co.,Ltd.,Shanghai 200032,China);Risk Assessment of Deep Foundation Pit by Using Fuzzy Comprehensive Evaluation Method Based on Bayesian Networks[J];Journal of Shanghai Jiaotong University;2009-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved