Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Changzhou Institute of Technology》 2010-05
Add to Favorite Get Latest Update

A Tunnel′s Schemes of Excavation and Construction of Lining

LI Ying-jie(Shaanxi Railway Institute,Weinan 714000)  
This paper makes a comprehensive analysis and summary of Dali-Lijiang-line Ⅶ tenders for tunnel construction organizations.Among the whole line,Beiya tunnel is a key and difficult project.Thus the tunnel′s schemes of excavation and construction of lining are investigated to further enhance the understanding of tunnel construction.
【CateGory Index】: U455.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Guo Fasheng (China Railway No.4 Engineering Group Co., Ltd., Hefei 230023, China);The Swiveling Drilling of Under-reamed Bored Pile in Perennial-frost Zone of Qinghai-Tibet Railway Construction[J];Anhui Architecture;2008-02
2 Liu Bin et al(China Railway Siyuan Survey and Design Group Co.,Ltd,Wuhan 430063,China);On the Design of Xi'dai Tunnel Over-passing a Blow-down Tunnel[J];Anhui Architecture;2008-03
3 DENG Ren-qing(No.5 Engineering Co.Ltd,of China Railway 11 Bureau Group,Chongqing 400037,China);A Method of Water Blocking by Grouting in High Pressure and Enriched Water Tunnel and Its Application[J];Chinese Journal of Underground Space and Engineering;2006-02
4 LUO Zhang-bo(Architecture and Metro Design Institute,The 5th Survey and Design Institute(Group) Co Ltd.of CRCC,Beijing 102600,China);Design of Track Panel Shaft in Metro Tunneling Interval[J];Chinese Journal of Underground Space and Engineering;2009-01
5 WU Dijun XIONG Wei(China Zhongtie Major Bridge Reconnaissance and Design Institute Co.Ltd.,34 Hanyang Avenue,Wuhan 430050,China);DESIGNING FOR ACCURACY OF BRIDGE CONSTRUCTION ELEVATION CONTROL NETWORK AND OBSERVATION OF OVER-RIVER LEVELING[J];Journal of Geomatics;2009-04
6 Liu Zhenyu,Hu Jun;Construction Technology of No-sealed Concrete Double-wall Steel Cofferdam with Uneven Cutting Edges[J];Urban Roads Bridges & Flood Control;2008-12
7 LIN Liangrong(Shenzhen Guangtie Civil Engineering Co Ltd, Shenzhen 518020, China);Information Technology in Replacement of Railway Bridge Pile Foundation[J];Journal of Changsha Railway University;2003-03
8 LI Jian-bo~(1,2) CHEN Jian-yun~(1,2) LI Jing~2 1.State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,China; 2.College of Civil and Hydraulic Engineering,Dalian University of Technology,Dalian 116024,China;Coupled Fluid-Mechanical Analysis of Settlement and Stability of Subway Tunnel[J];Journal of Disaster Prevention and Mitigation Engineering;2008-04
9 Zhao hongxin (China railway Seventh Group450000);Regression Analysis of Measuring Tunnel Data[J];Fujian Architecture & Construction;2008-04
10 ZHAO Guo-zhu(4TH Engineering Company of China Railway 13TH Bureau Group Co.Ltd.,Ha'erbin, Heilongjiang 130033,China);Smooth Blasting Technique in Excavation of Carst Tunnel under Different Geological Conditions[J];Journal of Water Resources and Architectural Engineering;2008-03
China Proceedings of conference Full-text Database 10 Hits
1 SUN Dan-chen;Self-balanced Detecting Technology for Deep Filling Pile With Large Diameter[A];[C];2004
2 HUA Yuan~1 ZHOU Tai-quan~1 L(?) Bao-hua~2 (1. College of Environmental and Civil Engineering, Jiangnan University, Wuxi 214122, China; 2. No.5 Engineering Department, China Railway Construction Group No. 19 Company, Dalian 116000, China);Reliability analysis of wet-sprayed fiber reinforced concrete lining structure within soft and weak rock mass using response surface method[A];[C];2008
3 SONG Yu-xiang~(1,2),JIA Xiao-yun~2,ZHU Yong-quan~2 (1.Southwest Jiaotong University,Chengdu 610031,China;2.School of Civil Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China);Research on simplified method of multiple structure reliability of metro tunnel[A];[C];2007
4 Wei Fei (Tai-Zhong-Yin Command Department of the 3rd China Coal Construction Co.Ltd Shanxi Luliang 033000);On the Lishi Controlled Blasting of the Tunnel and the Concerning Economic Analysis[A];[C];2009
5 Wei Nengyuan (Tai-Zhong-Yin,Command Department of the 3rd China Coal Construction-Company Shanxi Luliang 033000);Ventilation Technology of Trackless Transportation Construction in Long Tunnels[A];[C];2009
6 ;青云山特长隧道通风技术研究与应用[A];[C];2009
7 TANG Xinquan (China railway first survey and design institute group ltd,Xi’an 710043,China);Root Piles Reinforcement Design in Foundation Base of The Luotuochang Tunnel[A];[C];2009
8 WANG Wei,MIAO Dehai,LI Mingchong (China Railway Siyuan Survey and Design Group Co.,LTD,Wuhan 430063,Hubei,China);Dynamic Design of The Complicated Krast Tunnels of Yichang-Wanzhou Railway[A];[C];2009
9 HOU Junhong (Third Railway Design And Survey Institute Group Co. ,Tianjin, 300251,China);Collapse Treatment of the GangCheng Tunnel in Taizhongyin Railway[A];[C];2009
10 Tao Weiming (The 2nd Survey and Design Institute of China Railway, Chengdu 610031,China);Theoretical Basis of the Waterproof and Drainage Principle Applied to Mountain Tunnel with High Groundwater Level and its Engineering Application[A];[C];2009
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved