Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Northeast China Institute of Electric Power Engineering》 2001-04
Add to Favorite Get Latest Update

Online Monitoring of the Efficiency of Low Pressure Cylinder of Steam Turbine

LUO Zhen 1,ZHAO Xiao tong 2,XU Zhi ming 1,GUO Dong xia 2 (1.Northeast China Institute of Electric Power,Jilin,132012;2.Electric Power Research Institute of China,Beijing,100085)  
From the point of engineering application,presents a method to calculate the efficiency of low pressure cylinder,it can be a practical engineering means for the online monitor the steam turbine efficiency and the analysis of thermal economics,typical example demonstrates the method can be used for engineering application with precision.
【Fund】: 中国电力科学研究院科研课题项目编号EZF2 0 0 1
【CateGory Index】: TK261
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Zhang Jian Cao Zuqing Yang HongbingSoutheast University EPTRI of Anhui Province;On-Line Monitoring of Steam Turbine Efficiency and Analysis on Its Numerical Properties[J];Proceedings of the Csee;1992-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Zhi-wu, YUAN Su-fang (Department of Material Engineering, Wuhan University, Wuhan 430072, China);Relation Between Corrosion Rate of Brass and Concentration of Chloride Ion[J];Materials Protection;2004-10
2 ZHENG Xin-ming (Guangxi Heda Pulp & Paper Co., Ltd, Hezhou, Guangxi 542800, China);On heat economy improvement of enterprise-owned thermoelectric power plant[J];China Pulp & Paper Industry;2004-01
3 JIN Jian guo,LIU Yan chen,GUAN Yue bo (Department of Thermal Power Engineering,Northeast China Institute of Electric Power Engineering,Jilin City 132012);Effect on the Ability of Unit Frequency Modulation and the Dynamic Characteristic of Regulative System by Condenser Vacuun[J];JOURNAL OF NORTHEAST CHINA INSTITUTE OF ELECTRIC POWER ENGINEERING;2000-01
4 WU Xi-jun~1,FANG Ying~2,LI Kai~3(1.Jilin Electric Power Company Training Center,Changchun City 130022;2.Jilin University,Changchun City,130022);Analyzing the Affection of Vacuum Tightness Test on Thermal Economy of Steam Turbine[J];Journal of Northeast China Institute of Electric Power Engineering(Natural Science Edition);2005-04
5 ZHAO Jin-feng~1 ZHANG Rong-xin~2 LI Yong~2 (1.Electric Power Research Institute Co.LTD.of Jilin Province,Changehun City,Jilin Province,China,130021;2.Energy and Mechanics Engineering College of Northeast Dianli University,Jilin City,Jilin Province,China,132012);Operating Mode Analyzing for 300MW Steam Turbine[J];Journal of Northeast Dianli University(Natural Science Edition);2008-02
6  *Sun Lingfang **Yang Shanrang *Wang Jianguo **Xu Zhiming *(Department of Automatic Control Engineering,Northeast China Institute of Electric Power Engineering,Jilin City,China 132012) **(Department of Thermal Power;Development of Depositing States Monitorfor Cooling-Tubes of Condenser[J];JOURNAL OF NORTHEAST CHINA INSTITUTE OF ELECTRIC POWER ENGINEERING;1998-02
7 Jin Jianguo (Department of Thermal Power Engineering) Tian Limin (Apparatus Section) Song Ke (Informationzing Education Center) Li Zidong (Beijing Electric Equipment Repairing and Making Factory);Evaluation Method for Bundle Arrangement Affecting Heat Transfer in Condenser[J];JOURNAL OF NORTHEAST CHINA INSTITUTE OF ELECTRIC POWER ENGINEERING;1998-04
8 Yao Tianyu; Yan Li(Shanxi Aluminium Plant ) (North China University of Electric Power)Hao Aina; Jiao Haifeng(Shanxi Aluminium Plant ) (Taiyuan Higher Electric College);Analysis of avibration Reasons During No. 4 Turbine Test-run in Shanxi Aluminium Plant[J];JOURNAL OF ELECTRIC POWER;1999-01
9 Yang Jianmeng (Huabei Electrical University)Yang Wei; Jiang Aiqin; Jiao Haifeng(Taiyuan Higher Electrical College);The Development and Exploration of 300MW Simulator's DEH System in Taiyuan First Thermal Power Plant[J];JOURNAL OF ELECTRIC POWER;1999-03
10 LI Ming1 , LONG Ning-hui2, GAN Fu-quan2, WAN Fang2, PENG Fu-hua2, HUANG Pi-wei1, HUANG Lai1 (1. Hunan Electric Power Test & Research Institute, Changsha 410007, China; 2. Hunan Xiangtan Power Plant, Xiangtan 411102, China);Upgrading of the Air Extraction System of Double Back Pressure Condenser and Benefits Analysis[J];Electric Power Technologic Economics;2009-03
China Proceedings of conference Full-text Database 1 Hits
1 Xu Zhi-ming~1 Yang Shah-rang~1 Guo Shu-qing~2 Zhao He~3 Qi Bing~3 (1.Northeast China Institute of Electric Power Engineering,Jilin City,Jilin Province,132012,China; 2.Institute of Engineering Thermophysics,Chinese Academy of Science,Beijing,100080,China; 3.Huaneng Dalian Power Plant,Dalian,116100,China);COSTS DUE TO CONDENSERS IN CHINA[A];[C];2003
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Sun Wei Ye Lin Li Yong Ye Rongxue (High New Corporation,Northeast China Institute of Electric Power Engineering,Jilin City 132012) Zhang Yongqing Cai Lidong (Power Bureau of Jilin Province,Changchun 131000);On-Line Monitoring and Diagnosis of 200MW System Turbine Relative Internal Efficiency[J];JOURNAL OF NORTHEAST CHINA INSTITUTE OF ELECTRIC POWER ENGINEERING;1997-01
2 Hou Ziliang (Electric Power Planning & Engineering Institute, Beijing 100011, China);STUDY ON THE SUPERVISORY INFORMATION SYSTEM OF PLANT LEVEL IN FOSSIL FUEL POWER PLANT[J];Automation of Electric Power Systems;2002-15
3 Cai Xiao shu(Shanghai, Shanghai University of Science and Technology), Wang Nai ning, M.Renner, H. Stetter.;The Development of a Combined Probe for Simultaneously Measurement of Flow Field and Wetness in LP Turbine[J];POWER ENGINEERING;1999-03
4 ZHANG Chun fa, CHEN Hai ping, LIU Ji zhen (Dept. of Power Engrg., North China Electric Power Univ., Baoding 071003, China);The Enthalpy Calculating Method for Main Condensate Water at The Outlet of The Heater with A Drain Pump[J];Power Engineering;2002-01
5 WANG Pei hong, JIA Jun ying, JIN Xu ying (Dept. of Power Engrg., Southest Univ., Nanjing 210096, China);Real-Time Calculating Arithmetic Research on Low Pressure Casing Efficiency for Steam Turbine[J];Power Engineering;2002-03
6 YAN Shui-bao~1,SHANG QING-lian~2,WANG Pei-ping~1 (1. School of Chemical Engineering , Zhengzhou University, Zhengzhou 450002,China; 2. Zhengzhou City's Boiler Inspection Bureau, Zhengzhou 450052,China);On-line Algorithm for Calculating the Enthalpy of Turbine's Exhaust Steam[J];Power Engineering;2005-02
7 Wei Jin ming (Shanghai,Shanghai University of Science and Technology),Zhang Zhi wei,Cai Xiao shu,Zheng Gang,Wang Nai ning,Yang Qi guo,Hou Shao hua,Wang Yang.;Measurement of Steam Wetness in Turbine Final Stage with the Optical Method[J];POWER ENGINEERING;1997-04
8 Ren Hao ren, Sheng De ren, Lu Xue feng, Chen Jian hong, Xu Dong (1) Ren Hao ren(Hangzhou, Zhejiang University), Sheng De ren, Lu Xue feng, Chen Jian hong, Xu Dong;Calculation of Turbine Exhaust Enthalpy in Online System[J];POWER ENGINEERING;1998-06
9 Zhou Ke yi(Nanjing,South East University),Shao Ai ju,Ge Cong.;Performance Monitoring and Diagnostic of Foreign Power Plant[J];Power Engineering;1999-01
10 Chun Hai ping (Baoding, North China University of Electric Power), Zhang Chun fa, Zhang Shu fang, Zhou Jian, Guo Dian kui, Shi Wei zhu, Dai Ri jun.;The On Line Monitoring System of Economical Operation on the Thermodynamic System of a Power plant.[J];POWER ENGINEERING;1999-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved